| 1 | Construction of New open well, pipe line , Motor pumpset with all amenities at aliyur periya eri in Aliyur panchayat in Peranamallur Block in Tiruvannamalai District under PMAYG 2025-2026 |
| 2 | Earth work Open well excavation Complying with relevant Classes of 1x10 SS Well sinking and intial lead upto 10 mts in hard stiff clay,stiff black cotton soil hard Red earth shales,murram,gravel, stone earth and hard granite measures in solid including blastering and stracking Ordinary soil 0.0mtr - 2.00m Ist depth |
| 3 | Do S.D.R NOT REQ.rock requiring blasting 2.00-4.00-II Nd depth |
| 4 | Do M.D.R NOT REQ.rock requiring blasting 4.00tr - 6.00m III nd depth |
| 5 | Do MDR- REQ.rock requiring blasting 6.00mts -8.00m IV rd depth |
| 6 | Do Hard rock requiring blasting 8.00mtr - 10.00 -5 th depth |
| 7 | Do Hard rock requiring blasting 10.00mtr - 12.00 -6th depth |
| 8 | Do Hard rock requiring blasting 12.00mtr - 12.80m 7 th depth |
| 9 | Towards bailing out eater charges Bailing out water |
| 10 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance to site and all labour charges etc complete |
| 11 | RCC 1:1.5:3 mix using 20mm HBG metal including cost and conveyance etc complete |
| 12 | suppling and errecting of steel centering etc competed including cost and conveyance etc complete |
| 13 | Supply and fabrication of steel including cost and conveyance etc. complete |
| 14 | Earth work excavation as per SS20B for nerrow foundation |
| 15 | Towards parchesin of 90mm p.v.c pipes etc completed |
| 16 | Towards fixing of 90mm p.v.c pipes etc completed |
| 17 | Refilling with execavaterd earth etc completed |
| 18 | Towards Cost of Zoological survey |
| 19 | Towards Cost of E.B Service connection |
| 20 | Towards Cost of 6\\" dia Test Bore well |
| 21 | Cost and Supply of 5HP Motors and GI pipe and specials |
| 22 | Towards the labour charges for fixing of motor and pipes fixing |
| 23 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |