| 1 | Excavation for pole above 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 3 | Excavation and erection of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 4 | Fixing of LT V cross arm |
| 5 | Fixing of LT 3 phase cross arm |
| 6 | Dismantling and re erection of three phase cross arm |
| 7 | Dismantling and re erection of single phase cross arm |
| 8 | Fixing of Tapping Channel X arm |
| 9 | Fixing 11 KV DISC Insulator |
| 10 | Fixing of HT pin Insulator with pin 11KV |
| 11 | Fixing of Guarding X arm |
| 12 | Erection of LT Shackle |
| 13 | Fixing of LT Aluminium Knob |
| 14 | Pole Concreting |
| 15 | Earthing of poles with GI wire 4 or 6 SWG by coil earthing |
| 16 | Loading or unloading of above 9 mt pole |
| 17 | Transforting of 9 mtr poles and other associated materials from road side to pole pit upto 2KM |
| 18 | Loading or unloading of DT upto 250 KVA |
| 19 | Loading or unloading of DT upto 25 KVA |
| 20 | Excavation of PSC pole 9.00 m lenth by using JCB/Manual |
| 21 | Erection of PSC 9.00 m poles length by using Crane / Manual |
| 22 | Excavation and erection of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 23 | Erection of Tapping Channel ( structure ) |
| 24 | Erection of Transformer Bed structure |
| 25 | Erection of LT cable arrangement |
| 26 | Erection of AB switch |
| 27 | Erection of H.G.Fuse |
| 28 | Erection of HT -LAS fixing |
| 29 | Erection of LT -LAS fixing |
| 30 | Erection with central supporting arrangement |
| 31 | Painting structure poles colour paint with single pole structure materials aluminium paint ( by contractor ) |
| 32 | Fixing of HT Jumpering complete |
| 33 | Transportation of 9 mtr poles from road side to pole pit upto 2 KM |
| 34 | Loading and unloading of 9 mt poles |
| 35 | Pole Concreting Mass Concrete(including materials ) |
| 36 | Stay Concreting (including materials ) |
| 37 | Structure earthing complete with 3 pits and earth loops |
| 38 | Transforting of Distribution Transformer/Line Materials from stores to Office/site |
| 39 | Paving and stringing of conductor of 7/3.35mm ACSR for LT |
| 40 | Paving and stringing of conductor of 7/4.09mm ACSR for HT |
| 41 | Dismantling of conductor of 7/3.35mm ACSR for LT |
| 42 | Dismantling and re erection of conductor of 7/2.59mm ACSR for LT |
| 43 | Fixing of HT/LT fitting |
| 44 | Dismantling of RCC, REC, PSC poles above 8.00m length by using Crane / Manual Please Enable Macros to View BoQ information |