| 1 | Loading&unloading of 9m PSC pole |
| 2 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground |
| 3 | Erection of 9m PSC pole in Normal Ground |
| 4 | Transportation of 9m PSC pole from road side to pole pit upto 2KM |
| 5 | Loading&unloading of 8m PSC pole |
| 6 | Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground |
| 7 | Erection of 8m PSC pole in Normal Ground |
| 8 | Transportation of 8m PSC pole from road side to pole pit upto 2KM |
| 9 | Erection of V X arm 4.5 feet |
| 10 | Fixing of HT/LT TI fittings |
| 11 | Fixing of HT pin insulator |
| 12 | Fixing of LT S phase cross arm |
| 13 | Fixing of LT 3 phase cross arm |
| 14 | Fixing of LT pin insulator |
| 15 | Fixing of shackle |
| 16 | Fixing of aluminium knob |
| 17 | Excavation of stay pit (1.00m*0.5m*1.5m) in normal ground |
| 18 | Erection of stay set complete in normal ground |
| 19 | Paving and stringing of LT ACSR 7/2.59 conductor in pin point |
| 20 | Paving and stringing of LT ACSR 7/2.59 conductor in cut point |
| 21 | Paving and stringing of LT ACSR 7/3.35 conductor in pin point |
| 22 | Paving and stringing of LT ACSR 7/3.35 conductor in cut point |
| 23 | Coil earthing per pole & pole earthing |
| 24 | Loading&unloading of line materials |
| 25 | Transportation of line materials from Section Office to work spot up to 20 KM |
| 26 | Erection of LED lamp fittings |
| 27 | Providing Jumbering at Cut point |
| 28 | Drilling/less than 23mm hole per hole/slatted hole |
| 29 | Ordinary tree clearance |
| 30 | Erection of Single phase Service connection |
| 31 | Erection of Three phase Service connection |
| 32 | Dismantling of Single phase Service connection |
| 33 | Dismantling of Three phase Service connection |
| 34 | Dismantling & refixing of V X arm 4.5 feet |
| 35 | Dismantling & refixing of TI fittings |
| 36 | Dismantling & refixing of HT pin insulator |
| 37 | Dismantling & refixing of LT S phase cross arm |
| 38 | Dismantling & refixing of LT 3 phase cross arm |
| 39 | Dismantling & refixing of LT pin insulator |
| 40 | Dismantling & refixing of aluminium knob |
| 41 | Dismantling & Reerection of LED lamp fittings |
| 42 | Dismantling of 9mtr PSC pole |
| 43 | Dismantling of 8mtr &7.5 mtr RCC,REC, PSC &metal pole including the closing of the pit |
| 44 | Dismantling of conductors of ACSR 7/2.59 Conductor in cut point |
| 45 | Dismantling of conductors of ACSR 7/2.59 Conductor in pin point Please Enable Macros to View BoQ information |