| 1 | Earth work in ordinary soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. |
| 2 | Disposal of excavated earth by truck within 5 Km. lead including loading and unloading to the lower area of the Town for filling of depression etc. complete. |
| 3 | Filling foundation and plinth with sand and wel watered &rammedetc . Complete including cost of sand . |
| 4 | Cement Concrete (1:4:8) by using 4cm. Size C. B.H.G. metal including cost, conveyance etc. complete. |
| 5 | Cement concrete (1:2:4) with 12mm. Size hard broken granite chips (Crusher broken) including all cos |
| 6 | Fly ash bricks of 23 cm X 12cm X 8cm size having crushing strength not less than 75 kg / Cm2 with cement mortar (1:6) in super structure including splays,cutting,circular moldings, watering & curing for 7 days cost,conveyance ,taxes,& royalties of all materials,labourwith T&P etc.complete for super structure |
| 7 | 16mm thick CP (1:6) on brick work in F&P ect Complete |
| 8 | Supplying all materials, labour and ladder/scaolding T&P for art painting/concept painting/ 3D painting over walls/streets (RCC or Plastered or CC or Bituminous Base Black Top Surface) as per direction of BMC including cost of paint admixtures such as fabric strainer, acrylic emulsion etc, with labour charge of artists and helpers etc all complete (not covered under Govt. of Odisha SOR and hence rate has been adopted as per prevailing average local market rate) |
| 9 | Wall painting 1 coat with plastic emulsion paint of approved shade on old work to give an even shade including cost of paint. |
| 10 | Painting two coat with any approved paint including cost of paint |
| 11 | Supply, fitting and fixing of G.I. made grill, truss, purling including screws as may be required etc. with cost, conveyance, taxes of all materials ,labour,T & P required for complete in all respect. |
| 12 | Cement concrete (1:11/2:3) with 12mm. Size hard broken granite chips (Crusher broken) for R.C.C. works including hoisting, laying, all cost, conveyance, royality etc. complete. |
| 13 | Straightening, cutting,bending,binding tor steel rods, cranking,hooking,tying the grills & placing in proper positionfor RCC work including cost of binding wire ,cost conveyance, taxes of steel and other materials etc. complete |
| 14 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete. |
| 15 | Electrical Fitting including cost of materials |
| 16 | Animals statue |
| 17 | Operation & Maintenance for 3 year (3%) |
| 18 | Provision for site clean, cost of Display Board Photographs and unforseen items Please Enable Macros to View BoQ information |