|
| 1 | Complete overhauling and repairing of engine |
| 2 | Repairing of radiator assy with all connections and mounting |
| 3 | Replacement of piston, liner, piston ring one set each |
| 4 | Replaceemnt of C.R. Bearing two Set |
| 5 | Replacement of full gasket, main and timing seal one set each |
| 6 | Replacement of pin and bush, mobil and diesel filter one set each |
| 7 | Head reparing with vel,guide,lock seal etc |
| 8 | Repairing of fuel pump, nozzle overhauling with spares replacement |
| 9 | Machining Charge |
| 10 | Complete wiring with replacement of bulbs, positioning of assys. |
| 11 | Replacement of cross assy, Brake system repairing |
| 12 | Clutch Assy. |
| 13 | Clutch assy fitting charge |
| 14 | Profit @ 10% on Consumables |
| 15 | Various repairing of 12 Ton Crane |
| 16 | One No. hoist jack repairing |
| 17 | Crandle yoke assy crack repairing |
| 18 | Front tyre guard repairing |
| 19 | Lift jack guard repairing |
| 20 | Profit @ 10% on Consumables |
| 21 | Repairing of lower structural assembly and boom slider assembly |
| 22 | Electrode ESAB OK 21.03 or Eqv. 4MM |
| 23 | Electrode CPEM 021 or Eqv |
| 24 | Electrode L&T 660 NH or Eqv, 4 mm |
| 25 | Industrial Gas (2/3 No DA + 2 No Oxygen) |
| 26 | Bush AMLSAB0900000 |
| 27 | Service Charge Including 12.72% PF & contractor profit (Skilled 2 Nos X 4 Days X 2 Shift & Un-Skilled 3 Nos. X 4 days X 2 Shift) |
| 28 | Profit @ 10% on Consumables |
| 29 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |