|
| 1 | ALMIRAH LARGE STEEL (FD-1031) |
| 2 | CP Handle : Removing of old unserviceable handles from Almirah large steel and S&F new CP steel handle of latest pattern having exisiting size to Almirah large steel directed by GE/Engr-in-Charge . |
| 3 | Lock : Removing of old unserviceable lock from Almirah large steel and S&F new lock of approved make, 06 lever with two keys & brass lever to Almirah large steel all as shown on drawing or as directed. |
| 4 | Locking Device : M&L for locking device and lock bar as required and as directed by Engr-in-Charge to Almirah large steel including making adjustment of door shutter & applying one coat of synthetic enamel paint over a coat of red-oxide primer after preparation of surfaces complete with spray machine all as shown on drawing and as directed. |
| 5 | Legs : Removing of old unserviceable leg from Almirah large steel and S&F new leg made out of 1mm thick MS black sheet (PBI) of existing size, shape and welding at appropriate points all as directed by the Engr-in-Charge. |
| 6 | All as per Item Sl No. 1.04 here-in-before but bottom sheet of Almirah large steel. |
| 7 | All as per Item Sl No. 1.04 here-in-before but shelf of Almirah large steel. |
| 8 | Removing of old unserviceable but hinges of Almirah large steel and S&F new butt hinges 75 mm long and adjusting door by revitting / welding complete all as shown on drawing and as directed. |
| 9 | M&L for refixing of loose shelves with mild steel revitting /spot welding complete all as directed. |
| 10 | S & F 02 Nos of nylon bufferrs at the bottom of each legs with MS bolt. |
| 11 | ALMIRAH MEDIUM STEEL (FD-1032 ) |
| 12 | CP Handle : Removing of old unserviceable handles from Almirah medium steel and S&F new CP steel handle of exisiting size to Almirah medium steel all as shown on drawing and as directed. |
| 13 | Lock : Removing of old unserviceable lock from Almirah medium steel and S&F new lock of approved make, 06 lever with two keys to Almirah medium steel all as shown on drawing and as directed. |
| 14 | Locking Device : M&L for locking device and lock bar as required and as directed by Engr-in-Charge to Almirah med steel including making adjustment of door shutter & applying one coat of synthetic enamel paint over a coat of red-oxide primer after preparation of surfaces complete with spray machine all as shown on drawing and as directed. |
| 15 | Legs : Removing of old unserviceable leg from Almirah med steel and S&F new leg made out of 1mm thick MS black sheet (PBI) of existing size, shape and welding at appropriate points all as directed by Enger-in-Charge |
| 16 | All as per Item Sl No. 2.04 here-in -before but bottom sheet of Almirah medium steel. |
| 17 | All as per Item Sl No. 2.04 here-in -before but shelf of Almirah medium steel. |
| 18 | Removing of old unserviceable butt hinges of Almirah medium steel and S&F new butt hinges 75 mm long and adjusting door by revitting / welding complete all as shown on drawing and as directed. |
| 19 | M&L for refixing of loose shelves with mild steel revitting /spot welding complete all as directed. |
| 20 | S & F 02 Nos of nylon bufferrs at the bottom of each legs with MS bolt. |
| 21 | BED HARD STEEL (FD/E6/MAP/08 ® |
| 22 | Removing of old and unserviceable Plytop from Bed Hard and S&F of new 12mm thick plytop of suitable size, BWP IS:710 of approved quality with 10 Nos stainless steel half round nuts & bolts all as shown on drawing and as directed. (Make of Plywood : Greenply Gold 2.0/Archid Ply Gold/Century ply (Architect Ply). |
| 23 | Removing of old unserviceable head board from Bed Hard and S&F new head board made of 18 mm thick Plywood BWP Grade both laminated with colour/ shade approved by GE/ Engr-in-Chrge. All as per size and design shown on drawing and as directed. |
| 24 | All as per Item Sl No. 3.02 here-in-before but foot board of Bed hard. |
| 25 | S&F in replacement hard rubber shoes at each corner of long rail of Bed hard steel all as shown on drg. |
| 26 | S&F in replacement hard rubber shoes at the top of leg of of Bed hard steel all as shown on drg. |
| 27 | S&F in replacement hard rubber shoes at the bottom of leg of Bed hard steel all as shown on drg. |
| 28 | Welding to broken joints of bed hard all as directed . |
| 29 | TABLE BED SIDE (OFFICERS) (FD/E6/MAP/15(R) |
| 30 | Replacement of upper drawer made out of 18 mm thick BWP plywood with both side lamination & 2mm PVC edge-binding (Make-Rehau/Pegasus/Kinex) as per colour/ shade approved by GE/Engr-in-Charge. |
| 31 | Replacement of Lower drawer made out of 18 mm thick BWP plywood witrh both lamination with colour/ shade as approved by GE/Engr-in-Charge & soft close telescopic channel of best quality (Make-Godrej/EBCO/Hettich) as approved by Engr-in-charge. |
| 32 | Removing of old unserviceable top from table bed side and supply and fixing the new top made out of 18 mm thick BWP grade plywood IS:710 with both side lamination with colour / shade as approved by GE/ Engr-in-Charge. |
| 33 | All as per srl item No. 4.03 here-in-before but side of table bed side. |
| 34 | Removing of old unserviceable back ply of table bed side and supply and fixing the newback ply of same size made out of 06mm thick plywood both side laminated all as shown on drawing and as directed by Engineer-in-Charge. |
| 35 | Removing of old/unserviceable handle from the table bed side and supply and fixing new CP steel handle 100mm long as per sample, shape and size as directed by Engr-in-charge/GE. |
| 36 | TEAPOY VERANDAH (FD - E6/MAP/17) |
| 37 | Removing of old unserviceable top from Teapoy Verandah and S&F of new top made out of 18 mm thick BWP plywood (IS:710) duly post formed, colour / shade as approved by GE. 2 mm thick PVC edge-binding of Make-Rehau/Kinex shall be provided with mechanical fixing at two open end side of top complete all as per drawing, as specified and as directed. |
| 38 | M&L for Welding to broken joints of Teapoy verandah complete all as per drawing, as specified and as directed. |
| 39 | S&F in replacement PVC shoes to Teapoy verandah complete complete all as per drawing, as specified and as directed. |
| 40 | Removing of old/unserviceable jali from existing Teapoy Verandah and S&F new Jali including two coat of synthetic enamel paint (black in colour) complete all as per drawing, as specified and as directed. |
| 41 | PAINTING :- M&L for removing existing paint by application of paint remover / grinding machine, applying one coat of red oxide steel primer and two coats of synthetic enamel paint (Dual tone) make/colour/ shade as approved by Engr-in-Charge/ GE by spray painting after denting and filling with putty and preparation of surface thoroughly to the following steel furniture items (internally & externally complete) :- |
| 42 | Almirah Large Steel/Almirah Large Steel MAP (FD-1031/ FD/E6/MAP/18) |
| 43 | Almirah Med Steel (FD-1032) |
| 44 | Bed hard steel (MAP) (FD/E6/MAP/08(R)) |
| 45 | Teapoy Verandah (FD - 255/E6/MAP/17) |
| 46 | CHAIR VERANDAH (FD-19M,256,359,259) |
| 47 | M & L for Re-canning in MAT pattern 4mm wide half round new white plastic cane through out as approved by GE including taking out old canning complete as as showm on drawing and directed by Engr -in- Charge and 4 mm wide at the edge as approved by GE including taking out old canning complete all as shown on drawing and complete all as specified and directed by Engr-in-charge |
| 48 | Powder Coating : All CRCA steel surfaces shall undergo mandatory pre-treatment consisting of degreasing, derusting, water rinse, phosphating & passivation. Powder coating shall be pure epoxy/ epoxy-polyester hybrid with minimum film thickness 60-80 microns, cured at manufacturer-recommended temperature, achieving smooth, high gloss finish equivalent to Godrej trade finish, Shade shall be dual/ contrast as approved by GE. |
| 49 | Replacement of Hard rubber/PVC shoes as per drg complete all as specified and directed by Engr-in charge |
| 50 | CHAIR COMPUTER (FD/E6/MAP/01) |
| 51 | S&F new seat made of 12mm thick hot pressed plywood with fabric polyproplene /acrelic and mouled polyurethene foam 40 Density with PVC lipping all round complete all as shown on drawing. |
| 52 | All as per item No 8.01 above but back complete. |
| 53 | S&F new arm rest made of polyurethene as per drg |
| 54 | S&F complete pedestral assembly complete all as per drg and as directed. |
| 55 | S&F new twin wheel castors of required dia complete all as directed. |
| 56 | Supply & Fix new hydrolic cylinder (complete fittings) complete all as per drg and as directed. |
| 57 | Taking out old unserviceable locking lever assembely and Supply & fix new as shown in drawing complete all as directed. |
| 58 | NOTE:-(i)- The contract sum shall be arrived at after duducting amount of schedule of \\"Credit\\" from the Total quoted amount Note for all items:- (i) All items in BOQ are for \\"Materials and labour / Supply and fix\\" and to be executed in \\"Repairs/Replacement unless otherwise specifically mentioned as \\"Supply only\\" or Fixing only\\" in BOQ Bidders are required to quote their rates accordingly.(ii) The contract sum shall be arrived at after duducting amount of schedule of \\"Credit\\" from the Total quoted amount(iii) Makes of materials will be approved by GE in writing before commencement of work.(iv)- Quantities are clubbed in BOQ for different Jobs. For which ref. Annexure-I on Sl. page. No. 41 to 43 of tender document. Please Enable Macros to View BoQ information |