| 1 | Providing and fixing 4 mm thickness APP superthermoly st sheet polyester based sheet black finishing( including 2coats of silver colour paint) with hot torch treatment overRCC /cemented surface byfollowingmethods(i)aplyingwith shalitex stp primer for bitumen membrane @0.40liters/Sqm (ii) Mt.by the 4mm thickness APP superthermolystp sheet polyester based sheet black finishingmanufacturerer of density at @25*C ,0.87-0.89 kg/liter overprimer coated layer shall be laid using butane torch andsealing all the joints longitudinal as well as transverseprepare the surface complete. (iti) cut 1\\"deep grove above the roof surface on the parapet wall and seal edge of APPsuperthermoly stp polyester sheet into the groove with polymer modified mortar (iv)Incase of low height parapets,terminate APP superthermoly stp polyester sheet over theparapet. (v)For overlapping of joints, rub the polythylene side ofmembrane by wire brush,apply shali bond APP over therubbed area ,allow it to the tackly and then fix the bituminousside of APP superthermoly stp sheet polyester with hot application (vi) For longitudinal and transverse joints overlap of 75mm and 100mm respectively is desired. The vital physical and chemical parameter of the membrane shall as under:-Softening point of membrane not less than 150*C & cold flexibility shall be upto 0*C when tested in accordance with ASTM Joint strength in longitudinal amd transverse direction at 23*C as 350/300 N/5cm. Tear strength in longitudinal and transverse direction as 60/80N. in 4mm thick, the weight of Roll (55 kg for 1 meter by 10 meter ) the laying of membrane shall be got done through the certified applicator (certificate need to be attached). |
| 2 | preparing the surface by removal of old layers of mortar on roof and cleanig the cracks with wire brush etc ,shifting of debries /mulba from roof , parapets , momties and adjoining area o to the dumping sites by engaging labours skilled/mason |
| 3 | preparing the surface by removal of old layers of mortar on roof and cleanig the cracks with wire brush etc ,shifting of debries /mulba from roof , parapets , momties and adjoining area o to the dumping sites by engaging labours un- skilled |
| 4 | Cement plaster 1:2 (1 cement:2 course sand ) thickness 12mm to 20mm for levelling the surface of roof before laying sheet for waterproofing |
| 5 | providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying (a)after surface preparation ,frst layer of cement @0.488 kg/sqm mixed with water proofing cement compound @0.253kg/sqm(b)laying second layer of fibre glass cloth when the first layer is still green .Overlps of joints of fiber cloth should not be less than 10cm.(c)third layer of 1.5mm thickness consisting of slurry of cement @1.289kg/sqm mixed with water proofing cement compound @0.670kg/sqmand coarse sand @1.289kg/sqm. this will be allowed to air cure for 4 hours following by water curing for 48 hours .the entire treatment will be upto 30cm on parapet wall and tucked into groove in parapet all around |
| 6 | Engaging skilled labour for specilised job during execution of work at site |
| 7 | \\"Cleanig of roof surface after the execution of work ,shifting of debries /mulba from roof , parapets , momties and adjoining area of blocks to the dumping sites by engaging labours & carrying out any minor repair there of .un-Skilled \\" |
| 8 | Engaging welder including the hire charges of welding set and helper for roof maintence |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete. |
| 10 | Providing and fixing of prepainted /pre coatedcorrugated sheet including all fittings (complete job ) |
| 11 | providing and fixing of pvc pipe dia 3\\" dia for ( rain water,drainage etc )LMR |
| 12 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. |
| 13 | Engaging trolley for shifting of mulba from site to beyond the muncipality limit including loading and unloading on day today basis during the execution of work . |
| 14 | \\"Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank \\" |
| 15 | providing and fixing of pvc pipe dia 4\\" dia for ( rain water,drainageetc )LMR |
| 16 | \\"Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge: 25mm nominal outer dia pipes \\" |
| 17 | providing and fixing of 3mm thick ACP Sheet false ceiling with necessary aluminium frame work including filling of silicon in the groove /joints all complete Please Enable Macros to View BoQ information |