| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge.CPWD -2023- 2.8.1 |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge.CPWD -2023 16.1 |
| 3 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30Including supply of all material, labour, T&P etc required for proper completion of the work. |
| 4 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25.Including supply of all material, labour, T&P etc required for proper completion of the work. |
| 5 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) having CBR Value-20.Including supply of all material, labour, T&P etc required for proper completion of the work. |
| 6 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen emulsion 16.31.1.1 On W.B.M / W.M.M. @ 0.4kg/sqm |
| 7 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen emulsion 16.31.1.2 On bituminous surface @ 0.25kg/sqm |
| 8 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) for GradingII(19 mm nominal size) .Including supply of all material, labour, T&P etc required for proper completion of the work. |
| 9 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with ahydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects)for Grading-II (bituminous binder @ 5.4 % of mix .Including supply of all material, labour, T&P etc required for proper completion of the work. |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) .Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 11 | Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 12 | Removal of dabris / waste material / rubbish on road side / park / dust bin and from any other location by full load tractor trolly within the specified colonies as desired by the Engineer-in -charge & safe disposal of the same out side the colony area including cost of all labour (minimum fournos labours or more as required ) T&P etc required for proper loading/unloading and disposal of waste . or any other material required for the proper completion of work.(As per rate anlysis ) |
| 13 | Road Marking with Applied hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per Sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Including supply of all material, labour, T&P etc required for proper completion of the work. |
| 14 | Providing and laying of an elastomeric slab seal expansion joint complete as per app Clause 1207.2.5.1 (PWD MORD SOR May 2017 No No 14-20) Please Enable Macros to View BoQ information |