| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 7 | Dumping of Stone in Horizental on Level including the Cost of stone Complete job. |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 9 | Hand Packed stone in wire crate including the cost of stone and wire crate complete job. |
| 10 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-4 class (Heavy duty) R.C.C. pipes 900 mm dia. R.C.C. pipe |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 12 | Carriage of materials by Mechanical Transport including loading, unloading and stacking at site complete. Carriage of Sand/Bajree beloow 40mm nominal size by an average distance of 10 km by M.T. |
| 13 | Carriage of Non-pressure NP-4 class (Heavy duty) R.C.C. pipes 900 mm dia. R.C.C. pipe by an average distance of 90 km by M.T. |
| 14 | Carriage of Stone by an average distance of 08 km by M.T. Please Enable Macros to View BoQ information |