Tender For Hiring Services For Operations And Maintenance (O&M) With Rev Ing Of 4 Etps (Etp- 1 (Kalol Ggs-Iii), Etp-2 (Kalol Ggs-Vii), Etp- Nawagaon & Etp- Limbodra) Of Ahmedabad Asset For A Period Of 5 Years After Expiry Of The Existing Contract
Tender Overview
Project Description
Tender for Hiring Services For Operations And Maintenance (O&M) With Rev Ing Of 4 Etps (Etp- 1 (Kalol Ggs-Iii), Etp-2 (Kalol Ggs-Vii), Etp- Nawagaon & Etp- Limbodra) Of Ahmedabad Asset For A Period Of 5 Years After Expiry Of The Existing Contract
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Jun-2026 | PreBidReply | Other | 21-Jul-2026 |
| 2 | 21-Jul-2026 | CorrigendumEXTN | Date | 31-Jul-2026 |
| 3 | 20-Jul-2026 | ReplyofBidderQuery | Other | 31-Jul-2026 |
| 4 | 30-Jun-2026 | PreBidReply | Other | 31-Jul-2026 |
| 5 | 27-Jul-2026 | CorrigendumEXTN2 | Date | 17-Aug-2026 |
| 6 | 27-Jul-2026 | CorrigendumBEC | Other | 17-Aug-2026 |
| 7 | 21-Jul-2026 | CorrigendumEXTN | Date | 31-Jul-2026 |
| 8 | 20-Jul-2026 | ReplyofBidderQuery | Other | 17-Aug-2026 |
| 9 | 30-Jun-2026 | PreBidReply | Other | 17-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | AHMEDABAD ASSET |
| 2 | TOTAL CONTRACT VALUE FOR ALL THE PLANTS, INCLUSIVE OF GST (D+H +L + P -Q) Site Name : ETP KALOL GGS - III -2000M3/DAY Revamping of ETP KALOL GGS-III Sr. no UNIT / SYSTEM Description of Job (Itemised breakup of revamping job ) Rate (In INR) EXCLUDING GST |
| 3 | Wash Tank |
| 4 | Surge Tank |
| 5 | Chemical dosing system with Tank , pumps |
| 6 | Flash Mixer , Flocculator , CPI |
| 7 | Filter Feed Tank |
| 8 | Nutshell Feed Pump |
| 9 | Nutshell Filter |
| 10 | Cooling Tower |
| 11 | UF Feed Tank |
| 12 | UF Feed Pumps |
| 13 | UF System |
| 14 | Treated Water Tanks 1000m3x2 |
| 15 | Treated water transfer Pump |
| 16 | slope oil recovery system |
| 17 | Sludge / ows / Dirty back wash sump |
| 18 | Sludge Dry bed /Filtrate Press |
| 19 | Control room: |
| 20 | Electrical jobs and MCC room: |
| 21 | All rotatory Equipment’s: |
| 22 | All Instruments: |
| 23 | Air Compressor |
| 24 | Any other existing system / equipment A Major overhaul and revamping of existing facility with above details for ETP 1 KALOL GGS III total for revaming of existing facility 0.0 Site Name : ETP 2 KALOL GGS - VII -2000M3/DAY Revamping of ETP 2 KALOL GGS-VII Sr. no UNIT / SYSTEM Description of Job (Itemised breakup of revamping job) Rate (In INR) EXCLUDING GST |
| 25 | Wash Tank |
| 26 | Surge Tank |
| 27 | Chemical dosing system with Tank , pumps |
| 28 | Flash Mixer , Flocculator , CPI |
| 29 | Filter Feed Tank |
| 30 | Nutshell Feed Pump |
| 31 | Nutshell Filter |
| 32 | Cooling Tower |
| 33 | UF Feed Tank |
| 34 | UF Feed Pumps |
| 35 | UF System |
| 36 | Treated Water Tanks |
| 37 | Treated water transfer Pump |
| 38 | slope oil recovery system |
| 39 | Sludge / ows / Dirty back wash sump |
| 40 | Sludge Dry bed /Filtrate Press |
| 41 | Control room: |
| 42 | Electrical jobs MCC room: |
| 43 | All rotatory Equipment’s: |
| 44 | All Instruments: |
| 45 | Air Compressor |
| 46 | Any other existing system / equipment E Major overhaul and revamping of existing facility with above details for ETP 2 KALOL GGS-VII total for revaming of existing facility 0.0 Site Name : ETP NAWAGAM -2000M3/DAY Revamping of ETP NAWAGAM Sr. no UNIT / SYSTEM Description of Job (Itemised breakup of revamping job ) Rate (In INR) EXCLUDING GST |
| 47 | Wash Tank |
| 48 | Surge Tank |
| 49 | Chemical dosing system with Tank , pumps |
| 50 | Flash Mixer , Flocculator , CPI |
| 51 | Filter Feed Tank |
| 52 | Nutshell Feed Pump |
| 53 | Nutshell Filter |
| 54 | Cooling Tower |
| 55 | UF Feed Tank |
| 56 | UF Feed Pumps |
| 57 | UF System |
| 58 | Treated Water Tanks |
| 59 | Treated water transfer Pump |
| 60 | slope oil recovery system |
| 61 | Sludge / ows / Dirty back wash sump |
| 62 | Sludge Dry bed /Filtrate Press |
| 63 | Control room: |
| 64 | Electrical jobs MCC room: |
| 65 | All rotatory Equipment’s: |
| 66 | All Instruments: |
| 67 | Air Compressor |
| 68 | Any other existing system / equipment I Major overhaul and revamping of existing facility with above details forETP NAWAGAM total for revaming of existing facility 0.0 Site Name : ETP LIMBODRA -600M3/DAY Revamping of ETP LIMBODRA Sr. no UNIT / SYSTEM Description of Job (Itemised breakup of revamping job ) Rate (In INR) EXCLUDING GST |
| 69 | Wash Tank |
| 70 | Surge Tank |
| 71 | Chemical dosing system with Tank , pumps |
| 72 | Flash Mixer , Flocculator , CPI X 2 trains |
| 73 | IGF x 2 nos |
| 74 | Filter Feed Tank |
| 75 | Nutshell Feed Pump |
| 76 | Nutshell Filter |
| 77 | Cooling Tower |
| 78 | UF Feed Tank 50m3 x1 |
| 79 | UF Feed Pumps |
| 80 | UF System |
| 81 | Treated Water Tanks x2 |
| 82 | Treated water transfer Pump |
| 83 | slope oil recovery system |
| 84 | Sludge / ows / Dirty back wash sump |
| 85 | Sludge Dry bed /Filtrate Press |
| 86 | Control room: |
| 87 | Electrical jobs MCC room: |
| 88 | All rotatory Equipment’s: |
| 89 | All Instruments: |
| 90 | Air Compressor |
| 91 | Any other existing system / equipment M Major overhaul and revamping of existing facility with above details for ETP LIMBODRA total for revaming of existing facility 0.0 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 18 daysCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 18 daysCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 18 daysCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 18 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender