| 1 | H.S.R. Item |
| 2 | Less Credit of Old Bricks bat |
| 3 | Less Credit of Old Bricks |
| 4 | Less Credit of Old Steel |
| 5 | Less credit of old Pumping Machinery .. |
| 6 | Supplying, erection, testing and commissioning of Horizontal motorpumping set for clear water having head 12. 00 m as per the indicatedrequirements of discharge in LPM and power capacity in BHPMake: KSB, CRI, Kirlosker, Crompton Greeve, Lubi) 3200 LPM, 15 BHP |
| 7 | Credit of C.I. Pipe and Specials. |
| 8 | Provision for Centering and Shuttering for Dismantling of structure in many stages |
| 9 | Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head 45.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP Make: KSB, CRI, Kirtosker, Crompton Greeve, Lubi) 6000 LPM, 100 BHP...... |
| 10 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 6000 LPM x 45 mtr Head= 100 BHP |
| 11 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 1050 LPM x 15 Mtr Head = 20 BHP |
| 12 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 1050 LPM x 35 Mtr Head = 15 BHP |
| 13 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 1050 LPM x 35 Mtr Head = 15 BHP |
| 14 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 3200 LPM x 12 Mtr Head = 15 BHP |
| 15 | Supplying, erection, testing and commissioning of Horizontal motor pumping set for clear water having head 40. 00 m as per the indicated requirements of discharge in LPM and power capacity in BHP Make: KSB, CRI, Kirtosker, Crompton Greeve, Lubi) 3000 LPM , 50 BHP(3000 LPM x 40 mtr Head=50 BHP) |
| 16 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER) 3000 LPM x 40 Mtr Head = 50 BHP |
| 17 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 1.50 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG)`.. |
| 18 | Operation and Maintenance for complete scope of work i.e. existing water works WTP, 02 No. proposed boosting station and 01 No. existing boosting station mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/ Mtc. estimate complete in all respect as per Approved NIT.(i) During defect liability period (Operation only) after 3 monthTrial run period. |
| 19 | (ii) During 1st year after defect Liability period. |
| 20 | (iii) During 2nd year. |
| 21 | (iv) During 3rd year. |
| 22 | (v) During 4th year. |
| 23 | (vi) During 5th year. Please Enable Macros to View BoQ information |