| 1 | Part A (Materials Provided by contractor) |
| 2 | ACSR Dog Conductor |
| 3 | 11 KV XLPE Cable3×300 mm2 |
| 4 | 11 KV XLPE Cable3×185 mm2 |
| 5 | 33 KV XLPE Cable3×300 mm2 |
| 6 | ST Pole 11 M long |
| 7 | PCC Pole 11 M Long |
| 8 | ST Pole 9 M long |
| 9 | 33 KV line Isolator |
| 10 | Structure for line Isolator |
| 11 | 33 KV Bus Isolator |
| 12 | Structure for Bus Isolator |
| 13 | 33 KV post insulators |
| 14 | Structure for Post Insulator |
| 15 | 33 KV C. T |
| 16 | C.T Structure |
| 17 | 33 KV PT(Outdoor) |
| 18 | PT Structure |
| 19 | 33 KV Fuse Set |
| 20 | Fuse Set Structure |
| 21 | 33 KV Lightning Arrestors |
| 22 | LA Structure |
| 23 | 33 KV VCB 800A, 750 MVA with Structure |
| 24 | 33 KV Control Panel for Single T/F |
| 25 | 33KV Control Pannel for single feeder |
| 26 | AB Cable 3x120+1x95+1x16 |
| 27 | 90 Lbs. Rail pieces for T/F Wt. 44.6 Kg/Mtr. @ Rs. 22.10 Per Kg. |
| 28 | 11 KV VCB (Incoming) 600/300/5A 350 MVA |
| 29 | 11 KV VCB (Out going) 200/100/5A 350 MVA |
| 30 | 11 KV Bus Coupler |
| 31 | 11 KV Top channel |
| 32 | 11 KV X Arm with clamp |
| 33 | PG Clamp Dog to Dog Conductor |
| 34 | 11 kv Cable Jointing Kit 3×300 mm outdoor |
| 35 | 11 kv Cable Jointing Kit 3×300 mm indoor |
| 36 | 11 kv Cable Jointing Kit 3×185 mm outdoor |
| 37 | 11 kv Cable Jointing Kit 3×185 mm indoor |
| 38 | 11 kv Cable Jointing Kit 3×185 mm traight Through |
| 39 | 33 kv Cable Jointing Kit 3×300 mm outdoor |
| 40 | 33 kv Cable Jointing Kit 3×300 mm Straight Through |
| 41 | 11 KV Feeder Pillar |
| 42 | MS Dropper Channel |
| 43 | G I Pipe 6’‘Dia |
| 44 | 11 KV Disc Insulator B&S Polymeric Type |
| 45 | 11 KV Disc Fitting |
| 46 | Copper Z Clamp |
| 47 | Number Plate with clamp and Nut & Bolt |
| 48 | Danger Board with clamp and Nut & Bolt |
| 49 | Barbered Wire |
| 50 | Nut Bolt and washer all sizes |
| 51 | Alluminium Paint |
| 52 | Red Oxide Paint |
| 53 | Stay Set Complete |
| 54 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 55 | HDPE Pipe 160 mm dia PN8 |
| 56 | Holding Clamp for Top, Droper |
| 57 | Lug for ACSR Dog Conductor |
| 58 | L.T.P.V.C. Cable 3½×70 mm2 |
| 59 | Terminal Gantry |
| 60 | Bus Bar complete with structure |
| 61 | 24 Volt Battery & Battery Charger/Inverter with cabinet |
| 62 | Armoured Cu. Control Cable 2×2.5 mm2 |
| 63 | Armoured Cu. Control Cable 4×2.5 mm2 |
| 64 | 11 KV T.P. M.O. Switch with fixing clamps |
| 65 | 11 KV Fuse set with fixing clamps. |
| 66 | T&P of Substation switchgears (Hand Gloves-05 Set, Safety Helmets-5 Set, Safety Belts-4 Set, Tool kit Box-1, Pliers-05 Nos, Meggar-1 No, Multimeter-1 No, earth chain, ladder, Discharge Rod-3 No.) |
| 67 | Rubber Mat |
| 68 | Fire Fighting equipments including 02 no 10 kg,02 Nos. 4.5 Kg. Co2 Fire Extinguisher potable type and 02 Nos. machenical Foam type Fire Extinguisher potable type |
| 69 | Fire Bucket with sand and stand |
| 70 | Substation Furniture (4–fiber Chairs,2 wooden chair,1- revolving chair, 2–Table with drawer, 2–Bench, 1–Chauki, 2–Stool) |
| 71 | PART – B- WORKErection, grouting, painting of following fabricated structures as per RESSPO Drawing. |
| 72 | 33 KV Bus bar Gantry |
| 73 | 33 KV Terminal Gantry |
| 74 | 33 KV Isolator structure |
| 75 | 33 KV L.A. structure |
| 76 | 33 KV Post insulator structure |
| 77 | 33 KV fuse set structure |
| 78 | 33KV C.T. structure |
| 79 | 33KV P.T. structure |
| 80 | 33 KV VCB Structure |
| 81 | Insttalation, mounting and fitting of equipment on erected structures as per RESSPO Drawing. |
| 82 | 33 KV Line isolator complete |
| 83 | 33 KV Bus isolator complete |
| 84 | 33 KV L.A. |
| 85 | 33 KV Post insulator complete |
| 86 | 33 KV fuse set |
| 87 | 33KV C.T. |
| 88 | 33KV P.T. |
| 89 | 33 KV VCB |
| 90 | Construction of power transformer plinth for 10 MVA/05 MVA transformer of size 3.5 x 3.5 x 0.5 mtr or as per site requirement. including cost of all material as per requirement. |
| 91 | Transformer body earthing complete including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials. (delta type) |
| 92 | Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials. (delta type) |
| 93 | Indoor Equipment earthing (11 kv pannels) including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials. (delta type) both delta earthing will be connected with 32mm round bar |
| 94 | Separate earthing of Indoor Equipment (33 kv control pannel) including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials. (delta type) |
| 95 | Special earthing of LA including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials. (delta type) |
| 96 | Providing and Making of Outdor Earthing (Eartmat) as per UPPCL Norms. |
| 97 | Laying of 33kv/11 KV “XLPE” cable 3 x 185/300 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable or laying in cable trench as per site requirement. |
| 98 | Laying of 33 KV/11 KV Cable with inserting of HDPE Pipe by digging pit Mathod or HDD Mathod or Cable Trench Method .as per site requirement |
| 99 | Rising of cable on DP with GI Pipe 6\\" dia 3mtr long for cable safety. |
| 100 | Providing and erection of Special pipe earthing for cable protection. |
| 101 | Stringing of Terminal gantry and Making all Jumpers with provided all required material. complete work. |
| 102 | Stringing of 33 KV Bus Bar and Making all Jumpers in Switchyard with provided all required material. complete work |
| 103 | Providing & grouting of Neutral stand with all required materials. |
| 104 | Providing & Grouting of cable stand and fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
| 105 | Writing name on S/S Building 11 KV Switchgear panels & all equipments insatalled in control room & switchyard. |
| 106 | Jointing charges of 33 kv/11 KV “XLPE” C/J kit 3 x185/300 mm2 indoor/outdoor/Straight Through |
| 107 | Installation and connection of old 63 KVA T/F with all accessories |
| 108 | Fitting & Fixing of TPMO and Fuse set on erected 11 KV D/P. |
| 109 | Making of control cable trench with cover and hanger by providing all required materials. as per site requirement. |
| 110 | Laying from switchyard to control room for 33 KV panel, CT, VCB, 5 MVA t/F by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand. |
| 111 | 2 x 2.5 mm2 |
| 112 | 4 x 2.5 mm2 |
| 113 | Providing and writing of Sub-Station Name & Arrow shine Board Complete. |
| 114 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 115 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar. |
| 116 | Construction of SSO's approached road 1.5 Mtr. wide in Switchyard by laying dry sand and interlocking bricks the work includes proper plastering top & side of road and leveling & dressing of earth beneath the brick work on edge. |
| 117 | Laying of LT cable 3.5x70 sqmm |
| 118 | Outdoor switch yard & approch road colony lighting with Provide 08 no. street light pole,150-watt LED light and all required materials |
| 119 | Installation of 33 KV control panel for “VCB” with complete earthing and connection of battery and battery charger/inverter in control room and making all protection equipment connection. |
| 120 | installation & Concreting of Stay set complete |
| 121 | Filling of sand in cable trench in the Switch Gear Room. |
| 122 | Installation of 24 V Battery & Battery Charge/ Inverter with cabinet |
| 123 | Erection, grouting, muffing and painting of 2 Nos. ST Poles 11m long for making DP Structure including fabrication & fixing of M.S. Channel, M.S. Angle, TPMO, Fuse Set, disc Insulators etc. The work includes supply and fixing of necessary clamps with nuts, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:4:8 (cement, sand & brick ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with M.S. earthing rod complete in all respect. |
| 124 | Erection, grouting, muffing and painting of 2 Nos. ST Poles 9m long for making DP Structure including fabrication & fixing of M.S. Channel, M.S. Angle, TPMO, Fuse Set, disc Insulators etc. The work includes supply and fixing of necessary clamps with nuts, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:4:8 (cement, sand & brick ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with M.S. earthing rod complete in all respect. |
| 125 | Making T/F Plinth 2x2x1.5 mtr. with complete material or as per required size. |
| 126 | Making FRP fencing (Jali) of 250/400 kva TF as per required size |
| 127 | Special Chemical Earthing for 63/250/400 kva T/F with complete material & work |
| 128 | Shifting, Loading, Carraige & insatallation of existing 5 MVA/10MVA Transformer from old Plinth to new Plinth. . Complete work |
| 129 | Carriage, loading shifting and unloading of existing 250/400 KVA T/F Safely from existing place to shifted place lifting by crane and Installation all material with T/F |
| 130 | Providing of Misc. Items i.e. all type register, Shut Down/Breakdown Name Board, Writing name on Substation Building, name of feedar & switchgear |
| 131 | Testing & commissioning charges of Substation. |
| 132 | Making Plinth & Installation of 11 KV Feeder Pillar Box with complete wiring and Earthing after Temporary work Complete. |
| 133 | Shifting, Loading, Carriage & Unloading of old and damaged 33KV/11 KV/LT Line materials from work site to Store centre Gorkahpur Distt. Gorakhpur. |
| 134 | Temporary Shifting Work |
| 135 | Temporary Laying/Hanging of 11 KV XLPE Cable 3×300 mm2 |
| 136 | Temporary Laying/Hanging of 11 KV XLPE Cable 3×185 mm2 |
| 137 | Temporary Laying/Hanging of 33 KV XLPE Cable 3×300 mm2 |
| 138 | Temporary Laying/Hanging of 3x120+1x95+1x16 Sq.mm LT AB cable |
| 139 | Providing LT AB Cable hanging related all require materials i.e -I hooks & clamp, shackle Insulator, suspension clamp and all materials. |
| 140 | Erection, grouting, painting of CT And LA structure |
| 141 | Making Plinth & Installation of 11 KV Feeder Pillar Box with complete wiring and Earthing For temporary shifting of old DP. complete work |
| 142 | Jointing charges of 33 kv/11 KV “XLPE” C/J kit 3 x185/300 mm2 indoor/outdoor/Straight Through |
| 143 | Temporary shifting of old Existing 11/9-meter pole with LT & 11 KV Composite line |
| 144 | Temporary Shifting of 250/400 kva Transformer in Trolly with Necessary fitting During Construction of SS if required |
| 145 | Extend of power Transformer Plinth for temporary shifting of Transformer |
| 146 | Shifting/Sliding of Power Transformer & making all connection, Wiring, testing. complete work |
| 147 | Shifting/Sliding of 11 kv I/C, O/G, B/C Pannel/LT Pannel in control room, making all connection, Wiring, testing complete work |
| 148 | Temporary Shifting of old 63/100 kva transformer with all necessary fitting |
| 149 | Sfifting of old CT & LA on new Structure & wiring, earthing |
| 150 | Dismentling of old exising cable by digging and relaying on new DP/Feeder pillar |
| 151 | Dismentling of existing temporary all HT/LT Lines with all material & fitting and Shifting, Loading Carriage & Unloading of old- and used-Line materials from Work site Store to store centre Gorakhpur at the end of final shifting. |
| 152 | Erection of Double pole on 11 mtr long PCC Pole with fitting of accessories. |
| 153 | Erection of Single pole on 11 mtr long PCC Pole with fitting of accessories. Please Enable Macros to View BoQ information |