|
| 1 | CIVIL WORK |
| 2 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 3 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 4 | 15.2.1 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 5 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 6 | 5.9.2Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 7 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 8 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge |
| 10 | 16.79 Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. |
| 11 | 10.28 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) |
| 12 | 13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 13 | 13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 14 | 13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 15 | OD52076/2025-2026 Providing and laying neatly dressed shaped Natural stone of size 30 x 60 x 5 cm or nearest available size over bed of agreegate of average 50 mm after levelling, filling the joints with cement mortar including cost of conveying, unloading, material labor etc all complete as per the Direction of Engineer in charge |
| 16 | OD52077/2025-2026 CHEST PRESS CUM SHOULDER PRESS- Providing and fixing Chest press cum shoulder press - FFE 007 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for CENTER FRAME, Minimum 40 NB & 32 NB GI B-CLASS Pipe for MAIN FRAME, Minimum 32 NB & 25 NB GI B-CLASS Pipe for HANDLE FRAME, Minimum 32 NB & 25 NB & 40 NB GI BCLASS Pipe for CONNECTING PIPE, LLDP Rotomoulded seat with inbuilt bolts 3/8\\" X 1.5\\" for SEAT & BACK REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 17 | OD52078/2025-2026 PULL UP STATION- Providing and fixing Pull up station - FFE 028 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for MAIN FRAME, Minimum 40 NB GI B-CLASS Pipe for LEG FRAME, Minimum 25 NB & 32 NB GI B CLASS Pipe for HANDLE FRAME, LLDP Rotomoulded seat with inbuilt bolts 3/8\\" X 1.5\\" for FOOT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 18 | OD52079/2025-2026 LEG EXTENTION- Providing and fixing Leg extetion - FFE 0014 (Make FUN PLAY )using, 100 NB G.I C-Class pipe for main frame, 32 NB G.I B-Class pipe for Bench frame, 20 NB G.I B-Class pipe for Handle frame, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 19 | OD52081/2025-2026 WALKER SINGLE- Providing and fixing Walker single- FFE 0015 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe- for MAIN FRAME, minimum 32 NB GI B-CLASS Pipe- for LEG FRAME, Minimum 25 NB GI B-CLASS Pipe for HANDLE FRAME, NYLON 66 INJECTION MOULDED CASING CLAMPS, LLDP Rotomoulded seat with inbuilt bolts 3/8\\" X 1.5\\" FOOT REST, Nylon 66 injection Moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 20 | 1.019OD52082/2025-2026 LEG PRESS- Providing and fixingLeg press - FFE 008 (Make FUN PLAY )using, 100 NB G.I C-Class pipe for main frame, 32 NB G.I B-Class pipe for Bench frame, 20 NB G.I B-Class pipe for Handle frame, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 21 | OD52084/2025-2026 ONE SEATING CUM 2 STANDING TWISTER- Providing and fixing ONE SEATING CUM 2 STANDING TWISTER - FFE 019D (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for MAIN FRAME, Minimum 25 NB GI B CLASS Pipe for HANDLE FRAME, LLDP Rotomoulded seat with inbuilt bolts 3/8\\" X 1.5\\" for TWISTER DISC, Minimum 25 NB & 20 NB GI B class Pipe for SEATING FRAME, Minimum 80 NB GI B-class Pipe for SEATING FRAME STAND, Minimum 80 NB GI B-CLASS Pipe for TWISTER STAND, Minimum 25 NB GI B-CLASS Pipe for TWISTER HANDLE FRAME, LLDP Plastic- TWISTER DISC, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 22 | OD52086/2025-2026 CYCLE- Providing and fixing Cycle - FFE 024 (Make FUN PLAY )using, 25 NB & 40 NB GI B-class Pipe for MAIN FRAME, 32 NB GI B-CLASS Pipe for SEAT FRAME, 25 NB GI B-CLASS Pipe for HANDLE FRAME, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 23 | OD52087/2025-2026 ABB TRAINER- Providing and fixing ABB Trainer - FFE 025 (Make FUN PLAY )using, Minimum 80 NB GI B-class Pipe for MAIN FRAME, Minimum 32 NB GI B class Pipe for SIDE FRAME, Minimum 25 NB G.I. PIPES for INTERMEDIATE PIPE, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 24 | OD52088/2025-2026 FUN RIDER- Providing and fixing Rider - FFE 023 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe- for MAIN FRAME, Minimum 32 NB GI B CLASS pipe for SEAT FRAME, Minimum 40 NB & 25 NB B CLASS GI B CLASS Pipe for HANDLE FRAME, Minimum 32NB & 25NB GI B-CLASS pipe with two handles for LEG REST, LLDP Rotomoulded seat with inbuilt bolts 3/8\\" X 1.5\\" for FOOT REST & SEAT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 25 | OD309224/2025-2026 PENDULUM- Providing and fixing Pendulum - FNF 012 (Make FUN PLAY )using, Minimum 100 NB GI C-class Pipe for MAIN FRAME, Minimum 40 NB GI B CLASS Pipe for LEG FRAME, Minimum 25 NB & 32 NB GI B-CLASS Pipe for HANDLE FRAME, LLDP Rotomoulded seat with inbuilt bolts 3/8\\" X 1.5\\" for FOOT REST, Nylon 66 injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT including cost of concrete foundation , all materials, labour,etc all complete asper the instruction of Engineer in-charge |
| 26 | OD52089/2025-2026 Designing and Fixing Inauguration/signage Board including cost of board, lettering, fixing, conveying etc all complete As per the Direction Of Departmental officers Please Enable Macros to View BoQ information |