| 1 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 2 | 8.5/9/11 Mtr. long PCC Poles. |
| 3 | 9/11 Mtr. S.T. Poles |
| 4 | ACSR Weasel conductor |
| 5 | 16/25/63 KVA T/F |
| 6 | Earthing Complete |
| 7 | Shackle Insulator |
| 8 | Stay Set Complete |
| 9 | Tee off Channel |
| 10 | 11 KV Pin Insulator with Pin |
| 11 | Disc Insulator with Disc Fitting |
| 12 | F Bracket |
| 13 | 11 KV X-Arm |
| 14 | 50/95/120 sqmm. AB Cable |
| 15 | Suspension Clamp |
| 16 | Dead End Clamp |
| 17 | G.I Wire 6/8/10 SWG |
| 18 | Cable Jointing Kit |
| 19 | 11 KV XLPE cable |
| 20 | Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 21 | PCC poles 8.5/9/11 Mtr. |
| 22 | STP 9.0/11 Mtr. |
| 23 | Double Pole |
| 24 | Errection of following material as per RESPO manual |
| 25 | Cable Jointing Kit |
| 26 | Suspension Clamp |
| 27 | Dead End Clamp |
| 28 | Shackle Insulator |
| 29 | Tee off Channel |
| 30 | 11 KV Pin Insulator with Pin |
| 31 | Disc Insulator with Disc Fitting |
| 32 | F Bracket |
| 33 | 11 KV X-Arm |
| 34 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 35 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 36 | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. |
| 37 | ACSR Weasal conductor |
| 38 | 50/95/120 sqmm. AB Cable |
| 39 | XLPE Cable |
| 40 | Providing & Fixing of Following Clamps etc |
| 41 | 11 KV X Arms Clamps for STP/PCC Pole |
| 42 | Nut,bolt & Washer |
| 43 | 11 KV F Clamp for STP/PCC Pole |
| 44 | Earthwire Clamps |
| 45 | LT Clamp with Nut & Bolt |
| 46 | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer |
| 47 | Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The \\"T\\" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material. |
| 48 | Dismentlling and removal of existing Line from the various area |
| 49 | Dismentlling Of Pole STP/PCC |
| 50 | Opening Of Following accessories From Dismentaling Of Poles |
| 51 | 11 KV X-Arm |
| 52 | 11 Kv Clamps |
| 53 | 11 KV Pin Insulator with Pin |
| 54 | 11 KV Disc Insulator |
| 55 | Installation 16/25/63 KVA T/F on erected pole Please Enable Macros to View BoQ information |