|
| 1 | Clearing grass and removalof rubbish upto a distanceof 50 m outside theperiphery of the area |
| 2 | Providing & laying cementconcrete 1:3:6 (1 cement :3 coarse sand : 6 gradedgranitic or basaltic stoneaggrt. 40 mm. nominalsize) excluding cost ofcentering shuttering andfinishing in:;All worksupto plinth level |
| 3 | Removing white or colourwash by scrapping sandpapering and preparingsurface smooth includingnecessary repairs toscratches etc. complete. |
| 4 | Applying breathable nonreactiveantifungal andwater repellant Silane/Siloxane chemical asapproved byArchaeological Survey ofIndia/ Engineer ofapproved brand andmanufacture diluted withsolvent mineral Turpentineoil in the ratio of 1:12 (Onepart of approved chemical :12 Part of Turpentine oil)on the exposed lateritemasonry surface with twoor more coats to giveuniform application ofchemical on the surface allcomplete as per direction of Engineer. (The rate isinclusive of all materials &labours). |
| 5 | Painting one or more coatsof acryllic exterior paint ofapproved brand and manufacture(Such as Dulex/Asian Paints/ SherwinWillians) on old workincluding cleaning thesurface with water etc.complete. |
| 6 | Painting two or more coats(excluding priming coat)with superior quality readymixed paint for steel workof approved brand &manufacture in all shadeson new work to give aneven shade. |
| 7 | Erection of Shamiana/pandal with suitable clothand border etc. complete,supported with adequateframe work consisting ofM.S. sections/trusses & G. I. pipes etc.before the day of function& removing & taking backall the materials after thefunction is over & asdirected |
| 8 | Providing and laying watertight corrugated G.I. sheetsover existing frame workof shamiana/pandal, before the day offunction & removing andtaking back all thematerials after the functionis over and as directed bythe Engineer in Charge. |
| 9 | Erection of stage/platformwith ply wood of size 8\\" x4\\" and suitable height upto3' |
| 10 | Making arrangement ofpodium fitted with mike. |
| 11 | Making arrangement ofPlastic Chairs |
| 12 | Making arrangement ofCushioned chairs |
| 13 | Making arrangement ofVVIP chairs |
| 14 | Making arrangement ofSofa |
| 15 | Making arrangement ofpublic address system |
| 16 | Making arrangement ofsound system with mixer& 6 mikes |
| 17 | Making arrangement ofcordless Microphone |
| 18 | Providing & Laying redcoir carpet in pathways &pandal. |
| 19 | Providing & Laying sidewall curtain with suitablecloth & support up to 10’high. |
| 20 | Making arrangement oftables with suitable cloth |
| 21 | Making arrangement ofGenerator |
| 22 | Providing and laying greennet/cloth for the pandalfloor Please Enable Macros to View BoQ information |