Earthwork in excavation and removal of vegetationincluding disposal and lift upto 1point 5 mtr disposed earth afterwatering and compacting by power equipment and earthMovers Providing and laying anti termite treatment andantiweed for the entire area twiceSupplying spreading and leveling stone blast for WBMthickness 6inch after compacting and consolidate by wateringand using 8 to 10 ton powered steel wheel tandem roller Min6 to 8 passes
2
Asphalting Leveling
Providing and laying bitumen tack coat Previous layershould be cleaned and bitumen emulsion to be sprayedProviding and laying an intermediate leveling coat ofhot plant mix aggregate size of 20mm to 10mm with 80 to100mm grade bitumen premix layer with loose thickness of 1inch after compacting by roller with power steel wheeltandem roler After a gap of 21 days providing and laying anIntermediate leveling course of hot plant mix aggregate sizeof 10mm to 6mm with 80 to 100 grade bitumen premix layerwith loose thickness of 1 inch after compacting by roller withpower steel wheelProviding and laying seal coatwith stone dust Including Minimum bitumen mix by hot plants
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.