| 1 | HIWALL SPLIT - SITC |
| 2 | SITC of 3 Star rating of BEE Air Cooled Split Type Inverter Air Conditioner of latest available model comprising Indoor unit (IDU), Outdoor Unit (ODU), Surface/concealed copper refrigerant piping with proper insulation and covering the FRP tape, (IDU to ODU) copper power cable (at least 3C×2.5 Sqmm, PVC insulation FRLS copper wire), applicable refrigerant, remote, Suitable for 400/230 V + 10% of 50 Hz, 1/3 phase AC Supply capable of performing cooling, Dehumidification, scroll/reciprocating, rotary compressor etc complete in all respect. |
| 3 | 1.0TR (SP First floor Office room) |
| 4 | 1.5 TR (Animal house First floor BMS room) |
| 5 | 1.5 TR (Admin GND Floor IT Head Roonm) |
| 6 | 1.5 TR (Admin Third floor UPS) |
| 7 | 1.5 TR (Admin BMS) |
| 8 | DISMANTLING |
| 9 | Existing hiwall split ac dismantling indoor&outdoor with all assoceries (like copper pipe,drain pipe,communication cable)andbshifting the unit to location as instructed by engineer in charge |
| 10 | 1.0TR (SP First floor Office room) |
| 11 | 2.0TR (Animal house BMS room) |
| 12 | 1.5 TR (Admin GND Floor IT Head Roonm) |
| 13 | 2.0TR (Admin Third floor UPS) |
| 14 | 2.0TR (Admin BMS) |
| 15 | 2.0TR (SP Ground floor Production area) |
| 16 | REFIXING |
| 17 | Refixing,Testing and commissioning of existing hiwall split ac along with all assoceries (Like outdoor stand fixing, copper pipe,drain pipe,communication cable) |
| 18 | 2.0TR |
| 19 | COMPRESSOR - SITC |
| 20 | Replacement,SITC of compressor and complete refrigent gas charging in existing Split AC (Make:Daikin) |
| 21 | 1.5TR (Utility Ground floor UPS Room) |
| 22 | 1.5 TR (SP First floor BMS Room) |
| 23 | FANMOTOR - SITC |
| 24 | High-efficiency, thermally protected motor compatible with the existing AC unit.Installation of the new motor, including proper mounting and, if necessary, replacing the blower fan or condenser blade in Daikin make. |
| 25 | 1.5TR (Utility Ground floor UPS Room) |
| 26 | 1.5TR (Time office Ground floor Monitoring Room ) |
| 27 | 1.5TR (Time office Ground floor Vendor Room ) |
| 28 | FANMOTOR - SITC |
| 29 | DC Motor for Inverter AC (BCG First floor Office room) |
| 30 | PCB BOARD - SITC |
| 31 | 2.0TR (BCG First floor LAB1,LAB2) |
| 32 | 2.0 TR (Bacterial vaccine First floor UPS room) |
| 33 | 2.0TR (Admin Second floor QC office room) |
| 34 | CAPACITOR - SITC |
| 35 | Testing and replacing (SITC) of old capacitors, wiring, and contactors to ensure proper function.Ensuring the motor operates within specified noise levels, proper speed, and correct amperage draw. |
| 36 | 1.5TR (Utility Groun floor LAB 2) |
| 37 | 1.5TR (Utility Groun floor CPM Room) |
| 38 | ADDITIONAL COPPER GAS PIPING & GAS CHARGE |
| 39 | Additional Copper gas Piping (5/8,3/8 & 1/2) and gas charging of split AC systems as per OEM recommendation |
| 40 | CONDENSOR COIL - SITC |
| 41 | Supply, Fixing, testing and commissioning of outdoor copper condenser coil for existing 1.5 Ton High wall Split Air conditioner including gas charging etc. (Ware house First floor UPS room) |
| 42 | GENERAL SERVICE |
| 43 | General service includes cleaning air filters, evaporator/condenser coils, fan blowers, and water trays, along with checking for gas leaks, tightening electrical connections, and inspecting for damage to ensure optimal performance. |
| 44 | 1.5TR |
| 45 | Cold Room - Dx System Service |
| 46 | Providing comprehensive maintenance servicing and refrigerant gas charging for DX type coldroom units , including detailed visual inspection of all components such as evaporator coils, condenser units, compressors, expansion valves, and piping systems for any signs of wear, corrosion, or leaks; thorough cleaning of evaporator and condenser coils using approved non-corrosive cleaners to remove dust, debris, and contaminants; checking and tightening of all electrical connections, relays, contactors, and control panels; testing of safety devices including high/low pressure switches, thermostats, and defrost timers; leak detection using electronic detectors or soap solution methods followed by necessary repairs with compatible materials; system evacuation using vacuum pumps to achieve a minimum of 500 microns hold; charging with the specified refrigerant gas to the recommended pressure and quantity based on manufacturer's guidelines; performance testing post-charging to verify temperature pull-down, superheat, subcooling, and overall efficiency within ±2°C tolerance for storage requirements; submission of detailed service reports including pre- and post-service parameters and compliance certifications (Ware house 2°-8° ) |
| 47 | 8.35(L) X 6.90(W) X 3.0 (H)m (W1G018) ( GND Floor UCR 1) |
| 48 | 13.25 (L) X 6.30(W) X 3.0 (H)m (W1G020) ( GND Floor UCR 2) |
| 49 | 15.55(L) X 6.30(W) X 3.0 (H)m (W1G021) ( GND Floor UCR 3) |
| 50 | 12.14(L) X 6.30(W) X 3.0 (H)m (W1G022) ( GND Floor UCR 4) |
| 51 | 4.25(L) X 5.85(W) X 3.0 (H)m (W1G024) ( GND Floor UCR 5) |
| 52 | 4.70(L) X 5.95(W) X 3.0 (H)m (W1G007) ( GND Floor UCR 6) |
| 53 | Cold Room - Dx System Service |
| 54 | Providing comprehensive maintenance servicing and refrigerant gas charging for DX type coldroom units , including detailed visual inspection of all components such as evaporator coils, condenser units, compressors, expansion valves, and piping systems for any signs of wear, corrosion, or leaks; thorough cleaning of evaporator and condenser coils using approved non-corrosive cleaners to remove dust, debris, and contaminants; checking and tightening of all electrical connections, relays, contactors, and control panels; electrical door heaters, Light fittingswith bulb, testing of safety devices including high/low pressure switches, thermostats, and defrost timers; leak detection using electronic detectors or soap solution methods followed by necessary repairs with compatible materials; system evacuation using vacuum pumps to achieve a minimum of 500 microns hold; charging with the specified refrigerant gas to the recommended pressure and quantity based on manufacturer's guidelines; performance testing post-charging to verify temperature pull-down, superheat, subcooling, and overall efficiency within ±2°C tolerance for storage requirements; submission of detailed service reports including pre- and post-service parameters and compliance certifications (Ware house -20 ) |
| 55 | 3.60(L)X5.90(W)X3.0(H)m (W1G023) ( GND Floor UCR 1) |
| 56 | 5.70(L)X2.55(W)X3.0(H)m (W1G025) ( GND Floor UCR 2) |
| 57 | SUB STATION - DUCTABLE SPLIT AC |
| 58 | General service includes cleaning air filters of AHU, evaporator/condenser coils, fan blowers, and water trays, along with checking for gas leaks, tightening electrical connections, and inspecting for damage to ensure optimal performance. (110 KV Substation GND Floor Main Panel Area ) |
| 59 | SITC of 3/8th Drier for Outdoor unit |
| 60 | SIT of 5/8 & 3/8 Insulation Hose |
| 61 | Gas refill / Topup - R 410 a |
| 62 | 4 TR*6 Nos |
| 63 | 3 TR*4 Nos |
| 64 | Validation of Unclassified Cold Rooms.Validation scope reamains same as the above, but tests limited to Temperature Mapping, Stability Study |
| 65 | 8.35(L) X 6.90(W) X 3.0 (H)m (W1G018) ( 2°-8° UCR 1) |
| 66 | 13.25 (L) X 6.30(W) X 3.0 (H)m (W1G020) ( 2°-8° UCR 2) |
| 67 | 15.55(L) X 6.30(W) X 3.0 (H)m (W1G021) ( 2°-8° UCR 3) |
| 68 | 12.14(L) X 6.30(W) X 3.0 (H)m (W1G022) ( 2°-8° UCR 4) |
| 69 | 4.25(L) X 5.85(W) X 3.0 (H)m (W1G024) ( 2°-8° UCR 5) |
| 70 | 4.70(L) X 5.95(W) X 3.0 (H)m (W1G007) ( 2°-8° UCR 6) |
| 71 | 3.60(L)X5.90(W)X3.0(H)m (W1G023) ( 0°-20° UCR 1) |
| 72 | 5.70(L)X2.55(W)X3.0(H)m (W1G025) ( 0°-20° UCR 2) Please Enable Macros to View BoQ information |