| 1 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. |
| 2 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within lead of 30 Mtrs. |
| 3 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (Rehandling of earth) |
| 4 | Compaction Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling. Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.Extra for rolling to specifications |
| 5 | Laying cement concrete M-15 with stone ballast or shingle mixing by manual means |
| 6 | Laying cement concrete M-10 with stone ballast or shingle mixing by manual means |
| 7 | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in Super Structure. |
| 8 | Reinforced Cement Concrete M-25 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth. |
| 9 | Providing, lowering precast concrete NP-2 plain end pipes with collar andreinforcement, in trenches to correct gradient and alignment. cutting of reinforcement cement concrete, plain end pipe stringing in trenches, jointing endsand fixing collars with cement mortar 1:2 as per IS 456:2003 into trenches for all depths and laying out same to correct alignment, gradients, levels, etc., complete inRCC NP-2 all respect. 350 mm |
| 10 | Water proofing treatment of RCC structures (after making the surface clean, dry & free from all internal voids or honey combs ), with Zycosil /equivalent water proofing Solution (1 litre of Zycosil / equivalent & 20 litres of potable water stirred first & 2 litres of Zycoprime / equivalent added and stirred (total 23 litres)) using two coats till it meets the saturation level and testing as per RILEM or by water drops test in which water drops do not absorb but drops remain or rolls. |
| 11 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) |
| 12 | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc. |
| 13 | Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. |
| 14 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and Technical Specifications. |
| 15 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and Technical Specifications. |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. |
| 17 | Providing & placing of Steel foot steps complete |
| 18 | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth |
| 19 | Making Bore & installation of pumping set for dewatring arrangement complete in all respects. |
| 20 | Running and Maintenance of Pumping set 8 HP/Generator Set for dewatering arrangements complete in all respects. |
| 21 | Making dewatering arrangement by pumping set 4\\" X 4\\" (Tractor Driven) |
| 22 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth. |
| 23 | 12.5 mm thick cement plaster 1:3. |
| 24 | Dismantling brick work tile, masonry or tile lining -in cement |
| 25 | Extra for pumping charges of Batch Mix Concrete / Ready mix conrete work (RMC) Please Enable Macros to View BoQ information |