Sales : +91-777 804 8217
| Sl. No. | Item Title | Item Description |
| 1 | HULL WORK PACKAGE001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). Note 2:- Last date of Undocking - 18 Oct 23. | HULL WORK PACKAGE001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). Note 2:- Last date of Undocking - 18 Oct 23. |
| 2 | 002 Hull Cleaning (a) Under Water and Boot Top Area HP jet clean entire under water area inlcuding boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. | 002 Hull Cleaning (a) Under Water and Boot Top Area HP jet clean entire under water area inlcuding boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. |
| 3 | 002 Hull Cleaning (b) Internal Compartments - Carry out Manually clean following internal compartments/Tanks and present for survey. (a) Engine room bilges(b) SRP compartment(c) FW tanks (2 Nos)(d) Ballast Tank (2 Nos)(e) Forepeak tank(f) Aft peak tank(g) Cofferdam (02 Nos) | 002 Hull Cleaning (b) Internal Compartments - Carry out Manually clean following internal compartments/Tanks and present for survey. (a) Engine room bilges(b) SRP compartment(c) FW tanks (2 Nos)(d) Ballast Tank (2 Nos)(e) Forepeak tank(f) Aft peak tank(g) Cofferdam (02 Nos) |
| 4 | 003 Hull survey (a) Carry out visual/hammer survey in accordance with NO 01/15 of U/W hull including boot top area, above water hull, super structure, weather decks, all internal compartments including living spaces tanks i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc. All manholes to be inspected to ensure water tightness. All under water fenders to be removed to facilitate hull survey. | 003 Hull survey (a) Carry out visual/hammer survey in accordance with NO 01/15 of U/W hull including boot top area, above water hull, super structure, weather decks, all internal compartments including living spaces tanks i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc. All manholes to be inspected to ensure water tightness. All under water fenders to be removed to facilitate hull survey. |
| 5 | 003 Hull survey (b) UTG Survey External and Internal Hull survey. Carry out UTG survey in the presence of QC representatives of U/W hull, ship side, superstructure, weather deck, bulkheads, Tanks,manhole covers, bollards living spaces covering entire part of hull. Firm to submit 07 copies of Hull survey report. | 003 Hull survey (b) UTG Survey External and Internal Hull survey. Carry out UTG survey in the presence of QC representatives of U/W hull, ship side, superstructure, weather deck, bulkheads, Tanks,manhole covers, bollards living spaces covering entire part of hull. Firm to submit 07 copies of Hull survey report. |
| 6 | 004 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Lagging (2\\" MFMB) material in the budgetary cost for 50 sqm. | 004 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Lagging (2\\" MFMB) material in the budgetary cost for 50 sqm. |
| 7 | 005 Build ups Carry out build ups as indicated by the Hull survey team/ RMT (a) 50 x 50 mm - 300 Nos | 005 Build ups Carry out build ups as indicated by the Hull survey team/ RMT (a) 50 x 50 mm - 300 Nos |
| 8 | 005 Build ups Carry out build ups as indicated by the Hull survey team/RMT (b) 100 x 100 mm - 150 Nos | 005 Build ups Carry out build ups as indicated by the Hull survey team/RMT (b) 100 x 100 mm - 150 Nos |
| 9 | 006 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ RMT | 006 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ RMT |
| 10 | 007 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT. | 007 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT. |
| 11 | 008 Sea tube (a) Hydro jet blasting, UTG survey and pressure testing of sea tube including sea chest to be carried out. Dia - 300mm | 008 Sea tube (a) Hydro jet blasting, UTG survey and pressure testing of sea tube including sea chest to be carried out. Dia - 300mm |
| 12 | 008 Sea tube (b) carryout renewal of defective seatubes as per survey tube. OD-300mm. | 008 Sea tube (b) carryout renewal of defective seatubes as per survey tube. OD-300mm. |
| 13 | 009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric. | 009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric. |
| 14 | 010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK-II) those consumed more than 50% Note:- Anodes will be supply by firm. | 010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK-II) those consumed more than 50% Note:- Anodes will be supply by firm. |
| 15 | 010 Sacrificial Anodes (b) Renew Sacrificial anodes (MK- III) those consumed more than 50% Note:- Anodes will be supply by firm. | 010 Sacrificial Anodes (b) Renew Sacrificial anodes (MK- III) those consumed more than 50% Note:- Anodes will be supply by firm. |
| 16 | 010 Sacrificial Anodes (b) Renew Sacrificial anodes (MK- V) those consumed more than 50% Note:- Anodes will be supply by firm. | 010 Sacrificial Anodes (b) Renew Sacrificial anodes (MK- V) those consumed more than 50% Note:- Anodes will be supply by firm. |
| 17 | 011 Surface preparation. Under Water area including Boot top area Carry out sweep blasting to SA 1 standard on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15 . | 011 Surface preparation. Under Water area including Boot top area Carry out sweep blasting to SA 1 standard on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15 . |
| 18 | 011 Surface preparation. Under Water area including Boot top area Carry out Grit blasting to SA 2.5 standard on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15 . | 011 Surface preparation. Under Water area including Boot top area Carry out Grit blasting to SA 2.5 standard on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15 . |
| 19 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area including boot top area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard Primer , DFT-50 microns | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area including boot top area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Penguard Primer , DFT-50 microns |
| 20 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal N10 (Aluminium) - 150 microns | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal N10 (Aluminium) - 150 microns |
| 21 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal N10 (grey) - 150 microns | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal N10 (grey) - 150 microns |
| 22 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard Universal ES - 125 microns | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard Universal ES - 125 microns |
| 23 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Pro U (Light Red) - 150 microns | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Pro U (Light Red) - 150 microns |
| 24 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F:Seaquantum Pro U (Dark Red) - 150 microns | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F:Seaquantum Pro U (Dark Red) - 150 microns |
| 25 | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Top Coat: A/F Seaquantum Spectrum (Black) - 150 microns DFT | 012 Painting Under Water Area including Boot top area - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Top Coat: A/F Seaquantum Spectrum (Black) - 150 microns DFT |
| 26 | 013 Surface prepartion Above Water Area and Bulwark(a) Carry out Grit blasting to SA 2.5 standard on the Above Water Area and Bulwark (in side and out side) for removal of paint and application of new paint scheme as per NO 53/16. | 013 Surface prepartion Above Water Area and Bulwark(a) Carry out Grit blasting to SA 2.5 standard on the Above Water Area and Bulwark (in side and out side) for removal of paint and application of new paint scheme as per NO 53/16. |
| 27 | 013 Surface prepartion Above Water Area and Bulwark(a) Carry out surface preparation to St 1 standard on the Above Water Area and Bulwark (in side and out side) for removal of paint and application of new paint scheme as per NO 53/16 | 013 Surface prepartion Above Water Area and Bulwark(a) Carry out surface preparation to St 1 standard on the Above Water Area and Bulwark (in side and out side) for removal of paint and application of new paint scheme as per NO 53/16 |
| 28 | 014 Painting Above Water Area, Bulwark and deck fittings including guardrails - Jotun Scheme(a) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 1st Coat: Penguard primer (Red), 50 microns DFT | 014 Painting Above Water Area, Bulwark and deck fittings including guardrails - Jotun Scheme(a) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 1st Coat: Penguard primer (Red), 50 microns DFT |
| 29 | 014 Painting Above Water Area, Bulwark, Super structure and deck fittings including guardrails - Jotun Scheme (b) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 2nd Coat:Jotamastic 80 (Red Brown) - 125 microns DFT | 014 Painting Above Water Area, Bulwark, Super structure and deck fittings including guardrails - Jotun Scheme (b) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 2nd Coat:Jotamastic 80 (Red Brown) - 125 microns DFT |
| 30 | 014 Painting Above Water Area, Bulwark, Super structure and deck fittings including guardrails - Jotun Scheme(c) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 3rd Coat:Jotamastic 80 (Grey) - 125 microns DFT | 014 Painting Above Water Area, Bulwark, Super structure and deck fittings including guardrails - Jotun Scheme(c) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 3rd Coat:Jotamastic 80 (Grey) - 125 microns DFT |
| 31 | 014 Painting Above Water Area, Bulwark, Super structure and deck fittings including guardrails - Jotun Scheme (d) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 4th Coat:Hardtop XP (RAL9010 WHITE) - to be Painted 2 Coat each 60 microns DFT | 014 Painting Above Water Area, Bulwark, Super structure and deck fittings including guardrails - Jotun Scheme (d) Paint above mentioned area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. 4th Coat:Hardtop XP (RAL9010 WHITE) - to be Painted 2 Coat each 60 microns DFT |
| 32 | 015 Surface prepartion Weather Deck Carry out Hydrojet blasting to WJ 2 on weather deck and deck fittings. | 015 Surface prepartion Weather Deck Carry out Hydrojet blasting to WJ 2 on weather deck and deck fittings. |
| 33 | 016 Painting Weather Deck - Jotun Scheme Paint weather deck with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer (Red), 50 microns DFT | 016 Painting Weather Deck - Jotun Scheme Paint weather deck with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard primer (Red), 50 microns DFT |
| 34 | 016 Painting Weather Deck - Jotun Scheme Paint weather deck with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotacote Universal N10 (Aluminium) - 2X150 microns DFT | 016 Painting Weather Deck - Jotun Scheme Paint weather deck with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotacote Universal N10 (Aluminium) - 2X150 microns DFT |
| 35 | 016 Painting Weather Deck - Jotun Scheme Paint weather deck with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Non Slip Epoxy D.A. Grey (HDNS) - 2X250 microns DFT | 016 Painting Weather Deck - Jotun Scheme Paint weather deck with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Non Slip Epoxy D.A. Grey (HDNS) - 2X250 microns DFT |
| 36 | 017Cleaning and Application of OM 750 OilLube Oil Tank, Waste Oil Tank, Bilge Holding Tank, Fuel Oil Service Tank, Fuel Oil RU tankManually scrap and clean Fuel Tank and apply two coats of OM 750 oil.Note:- Firm to quote for service & material required for undertaking job. | 017Cleaning and Application of OM 750 OilLube Oil Tank, Waste Oil Tank, Bilge Holding Tank, Fuel Oil Service Tank, Fuel Oil RU tankManually scrap and clean Fuel Tank and apply two coats of OM 750 oil.Note:- Firm to quote for service & material required for undertaking job. |
| 37 | 018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 3 (bare metal) standards for paint application in Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker. | 018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 3 (bare metal) standards for paint application in Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker. |
| 38 | 018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 1 standards for paint application in Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, cable locker | 018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 1 standards for paint application in Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, cable locker |
| 39 | 019 Painting Painting of Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints. (a) 1st Coat: primer -Penguar primer -50 microns DFT | 019 Painting Painting of Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints. (a) 1st Coat: primer -Penguar primer -50 microns DFT |
| 40 | 019 Painting Painting of Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints. (b) 2nd Coat: Bolloxy HB light Light Biege- DFT -150 micron | 019 Painting Painting of Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints. (b) 2nd Coat: Bolloxy HB light Light Biege- DFT -150 micron |
| 41 | 019 Painting Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank - Jotun Scheme. Painting of Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints. (c) 3rd Coat: Bolloxy HB light Light Green - 150 microns | 019 Painting Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank - Jotun Scheme. Painting of Fore Peak Tanks, Aft Peak Tank, Ballast Tank, SW OH Tank, Cable locker to be carried out with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints. (c) 3rd Coat: Bolloxy HB light Light Green - 150 microns |
| 42 | 022 Surface Preparation Fresh water tanks, Foam tank and Fresh water gravity tanks Carry out mechanical cleaning to ST 3 standard for paint application. | 022 Surface Preparation Fresh water tanks, Foam tank and Fresh water gravity tanks Carry out mechanical cleaning to ST 3 standard for paint application. |
| 43 | 022 Surface Preparation Fresh water tanks, Foam tank and Fresh water gravity tanks Carry out mechanical cleaning to ST 1 standard for paint application. | 022 Surface Preparation Fresh water tanks, Foam tank and Fresh water gravity tanks Carry out mechanical cleaning to ST 1 standard for paint application. |
| 44 | 023 Painting Painting of fresh water tanks, foam tanks and fresh water gravity tank to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints . (a) 1st Coat: Penguard HB White -100 microns DFT | 023 Painting Painting of fresh water tanks, foam tanks and fresh water gravity tank to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints . (a) 1st Coat: Penguard HB White -100 microns DFT |
| 45 | 023 Painting Painting of fresh water tanks, foam tanks and fresh water gravity tank to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB Grey -100 microns DFT | 023 Painting Painting of fresh water tanks, foam tanks and fresh water gravity tank to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB Grey -100 microns DFT |
| 46 | 023 Painting Painting of fresh water tanks, foam tanks and fresh water gravity tank to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints. (c) 3rd Coat: Penguard HB White -100 microns DFT | 023 Painting Painting of fresh water tanks, foam tanks and fresh water gravity tank to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints. (c) 3rd Coat: Penguard HB White -100 microns DFT |
| 47 | 024 Surface Preparation Internal Compartments - Bilges of Engine Room and SRP Compartment Carry out mechanical cleaning to ST 3 standard for paint application. | 024 Surface Preparation Internal Compartments - Bilges of Engine Room and SRP Compartment Carry out mechanical cleaning to ST 3 standard for paint application. |
| 48 | 024 Surface Preparation Internal Compartments - Bilges of Engine Room and SRP Compartment Carry out mechanical cleaning to ST 1 standard for paint application. | 024 Surface Preparation Internal Compartments - Bilges of Engine Room and SRP Compartment Carry out mechanical cleaning to ST 1 standard for paint application. |
| 49 | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints. (a) 1st Coat: primer - Penguard Primer(Red) - 50 microns DFT | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints. (a) 1st Coat: primer - Penguard Primer(Red) - 50 microns DFT |
| 50 | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints (b) 2nd Coat: Anticorrosive - Jotacote Universal N10(Aluminium) - 150 microns | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints (b) 2nd Coat: Anticorrosive - Jotacote Universal N10(Aluminium) - 150 microns |
| 51 | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jotacote Universal N10(Grey) - 150 microns | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jotacote Universal N10(Grey) - 150 microns |
| 52 | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints (d) 4th Coat: Top Coat -Penguard Top Coat(Grey 38) - 50 microns | 025 Painting Painting of bilges of Engine room and ASP compartment to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints (d) 4th Coat: Top Coat -Penguard Top Coat(Grey 38) - 50 microns |
| 53 | 026 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. Carry out mechanical cleaning to ST 3 standard for paint application. | 026 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. Carry out mechanical cleaning to ST 3 standard for paint application. |
| 54 | 026 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. Carry out mechanical cleaning to ST 1 standard for paint application. | 026 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. Carry out mechanical cleaning to ST 1 standard for paint application. |
| 55 | 027 Painting Painting of bulkheads of Engine room and SRP compartments and living spaces to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints. (a) 1st Coat: primer -Epoxy Red Oxide Primer - 2X40 microns DFT | 027 Painting Painting of bulkheads of Engine room and SRP compartments and living spaces to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints. (a) 1st Coat: primer -Epoxy Red Oxide Primer - 2X40 microns DFT |
| 56 | 027 Painting Painting of bulkheads of Engine room and SRP compartments and living spaces to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: White interior fire retradant paint(JSS 8010-72:2001) DFT-2X100 microns | 027 Painting Painting of bulkheads of Engine room and SRP compartments and living spaces to be carried out with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: White interior fire retradant paint(JSS 8010-72:2001) DFT-2X100 microns |
| 57 | 028 Air Pressure Testing (a) Air Pressure Test the following tanks to 0.14 Kg per Sq. Cms and rectify the defects any observed during pressure testing and prove. note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0006 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (i) Fresh Water Tank -02(ii) Fwd Ballast Tank -02(iii) Forepeak Tank -01(iv) Fuel Tank -02(v) Aft Peak Tank -01(vi) Lube oil tank - 01(vii) Waste oil tank -01(viii) Foam Tank -01 | 028 Air Pressure Testing (a) Air Pressure Test the following tanks to 0.14 Kg per Sq. Cms and rectify the defects any observed during pressure testing and prove. note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0006 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (i) Fresh Water Tank -02(ii) Fwd Ballast Tank -02(iii) Forepeak Tank -01(iv) Fuel Tank -02(v) Aft Peak Tank -01(vi) Lube oil tank - 01(vii) Waste oil tank -01(viii) Foam Tank -01 |
| 58 | 028 Bilge Platform plate (b) Bilge platform plate damaged/deformed. Renew bilge platform plate. Material- aluminium chequered plate, thickness- 05 mm | 028 Bilge Platform plate (b) Bilge platform plate damaged/deformed. Renew bilge platform plate. Material- aluminium chequered plate, thickness- 05 mm |
| 59 | 029 Bilge Platform Supporting brackets Bilge platform supporting brackets corroded/broken at indicated locations to be renewed. Mat - MS angle bar | 029 Bilge Platform Supporting brackets Bilge platform supporting brackets corroded/broken at indicated locations to be renewed. Mat - MS angle bar |
| 60 | 030 Key Fender Head & Stern fenders Coaming plate between fenders corroded, thinned and holed. Coaming plate to be renewed as per survey reports. (a) Top and bottom securing brackets/ plates and partition plates length varies from 430 mm to 905 mm x 8mm thick Note: - Work involves removal of head and stern key fenders for hull survey and repair/ renewal of top and bottom securing brackets/ plates and partition plates. | 030 Key Fender Head & Stern fenders Coaming plate between fenders corroded, thinned and holed. Coaming plate to be renewed as per survey reports. (a) Top and bottom securing brackets/ plates and partition plates length varies from 430 mm to 905 mm x 8mm thick Note: - Work involves removal of head and stern key fenders for hull survey and repair/ renewal of top and bottom securing brackets/ plates and partition plates. |
| 61 | 030 Key Fender Head & Stern fenders (b) All Head and stern Key Fenders to be renewed with White colour fenders as per sizes. Specification - EPDM rubber as per NES 170. Crossection size 300mmx300mm. Length of fenders varies between 430mm to 850 mm. | 030 Key Fender Head & Stern fenders (b) All Head and stern Key Fenders to be renewed with White colour fenders as per sizes. Specification - EPDM rubber as per NES 170. Crossection size 300mmx300mm. Length of fenders varies between 430mm to 850 mm. |
| 62 | 030 Key Fender Head & Stern fenders Key Fender securing arrangement (c)(c) Key Fender securing rod corroded/broken. Renewal of securing rod to be carried out. Size- M24 DIA ,Mat - SS, Length of rod varies between 430 mm to 850 mm. All nuts are to be tack welded post tightening. | 030 Key Fender Head & Stern fenders Key Fender securing arrangement (c)(c) Key Fender securing rod corroded/broken. Renewal of securing rod to be carried out. Size- M24 DIA ,Mat - SS, Length of rod varies between 430 mm to 850 mm. All nuts are to be tack welded post tightening. |
| 63 | 031 Tyre fenders Tyre fender damaged on P&S side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere sow (a) OD 750mm; ID 400mm width of tyre- 360 mm | 031 Tyre fenders Tyre fender damaged on P&S side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere sow (a) OD 750mm; ID 400mm width of tyre- 360 mm |
| 64 | 031 Tyre fenders Tyre fender damaged at FWD and AFT to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere sow (b) Tyre fenders , OD- 1000 MM, ID 800 MM for fwd and aft . Width-350 mmNote- Tyre to be fitted with metallic pipe bush. each tyre - 03 bush | 031 Tyre fenders Tyre fender damaged at FWD and AFT to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. Vendors to adhere sow (b) Tyre fenders , OD- 1000 MM, ID 800 MM for fwd and aft . Width-350 mmNote- Tyre to be fitted with metallic pipe bush. each tyre - 03 bush |
| 65 | 031 Tyre fenders (c) Tyre fenders are to be secured with Securing chains. Dia- 16 mm ,MAT- SS. | 031 Tyre fenders (c) Tyre fenders are to be secured with Securing chains. Dia- 16 mm ,MAT- SS. |
| 66 | 031 Tyre fenders (d) Tyre fenders securing chain is to be secured with D-Shackles. 14 mm dia , MAT-SS | 031 Tyre fenders (d) Tyre fenders securing chain is to be secured with D-Shackles. 14 mm dia , MAT-SS |
| 67 | 031 Tyre fenders (d) Tyre fenders securing chain to be passed through metallic sleeve . Mat - MS , Dia - 3 inch pipe. | 031 Tyre fenders (d) Tyre fenders securing chain to be passed through metallic sleeve . Mat - MS , Dia - 3 inch pipe. |
| 68 | 031 Tyre fenders (e) Securing Brackets/Eye of Tyre Fenders damaged/deformed to be renewed. | 031 Tyre fenders (e) Securing Brackets/Eye of Tyre Fenders damaged/deformed to be renewed. |
| 69 | 032 Under water fenders (a) Underwater fenders to be removed for inspection of fenders and hull for visual/UTG survey and necessary repairs to be attended on associted hull. post repair fenders to be fitted backNote: cost of visual/ UTG survey and necessary repairs undertaken to be quoted under DL 1.0010 | 032 Under water fenders (a) Underwater fenders to be removed for inspection of fenders and hull for visual/UTG survey and necessary repairs to be attended on associted hull. post repair fenders to be fitted backNote: cost of visual/ UTG survey and necessary repairs undertaken to be quoted under DL 1.0010 |
| 70 | 032 Under water fenders (b) New fenders to be fitted in Black colour below water line and Above water line with-white colour. Specification - EPDM rubber as per NES 170, Qty. - 90 Rmt Black, 60 Rmt White | 032 Under water fenders (b) New fenders to be fitted in Black colour below water line and Above water line with-white colour. Specification - EPDM rubber as per NES 170, Qty. - 90 Rmt Black, 60 Rmt White |
| 71 | 032 Underwater fenders securing arrangment (c) Fenders is to be secured with proper nut, bolt and washers as per sample. (Mat - MS with nickel coating), Nut & Bolt Dia -20 mm, bolt Length-370 mm, Washer dia-22mm) (Note : Firm to QUOTE FOR NUTS BOLTS AND ASSOCIATED ACCESSORIES also) | 032 Underwater fenders securing arrangment (c) Fenders is to be secured with proper nut, bolt and washers as per sample. (Mat - MS with nickel coating), Nut & Bolt Dia -20 mm, bolt Length-370 mm, Washer dia-22mm) (Note : Firm to QUOTE FOR NUTS BOLTS AND ASSOCIATED ACCESSORIES also) |
| 72 | 032 Under water fenders (d) Damaged C channel of underwater fender to be renewed. | 032 Under water fenders (d) Damaged C channel of underwater fender to be renewed. |
| 73 | 033 Bulwark coaming Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renew as per survey report. (a) Pipe On Bulwark | 033 Bulwark coaming Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renew as per survey report. (a) Pipe On Bulwark |
| 74 | 033 Bulwark coaming (b) Bulwark plate and Frames deformed/ damaged at various locations on weather deck to be renew as per survey report. | 033 Bulwark coaming (b) Bulwark plate and Frames deformed/ damaged at various locations on weather deck to be renew as per survey report. |
| 75 | 034 Anchor and chain cable (a) Chain cable and associated fittings are to be hydrojet blasted to bare metal and survey to be carried out. paint with 02 coat of black bituminous post survey iaw NO 02/2021 and refit back. Renew off all such parts which declared unservicebile.note : -The job involves removal of all anchor accessories, laying out and hydro jet blasting for survey and painting and final refitment post survey by ND (V) | 034 Anchor and chain cable (a) Chain cable and associated fittings are to be hydrojet blasted to bare metal and survey to be carried out. paint with 02 coat of black bituminous post survey iaw NO 02/2021 and refit back. Renew off all such parts which declared unservicebile.note : -The job involves removal of all anchor accessories, laying out and hydro jet blasting for survey and painting and final refitment post survey by ND (V) |
| 76 | 034 Anchor and chain cable (b) Remove Swivel piece for hydrojet blasting and present for survey. Post survey paint with 02 coat of black bituminous paint iaw NO 02/2021 and refit back. | 034 Anchor and chain cable (b) Remove Swivel piece for hydrojet blasting and present for survey. Post survey paint with 02 coat of black bituminous paint iaw NO 02/2021 and refit back. |
| 77 | 034 Anchor and chain cable (c) Remove Lug less joining shackles for hydrojet blasting and present for survey. Post survey paint with 02 coat of black bituminous paint iaw NO 02/2021 and refit back. | 034 Anchor and chain cable (c) Remove Lug less joining shackles for hydrojet blasting and present for survey. Post survey paint with 02 coat of black bituminous paint iaw NO 02/2021 and refit back. |
| 78 | 034 Anchor and chain cable (d) Remove D- shackles for hydrojet blasting and pesent survey. Post survey paint with 02 coat of black bituminous paint iaw NO 02/2021 and refit back. | 034 Anchor and chain cable (d) Remove D- shackles for hydrojet blasting and pesent survey. Post survey paint with 02 coat of black bituminous paint iaw NO 02/2021 and refit back. |
| 79 | 034 Anchor and chain cable (e) Anchors (including Anchor Shackle,Ring and crown shackle) to be hydrojet blasted to bare metal and present for survey. Post survey paint with 02 coat of Jotamastic 80 black iaw NO 02/2021 and refit back. | 034 Anchor and chain cable (e) Anchors (including Anchor Shackle,Ring and crown shackle) to be hydrojet blasted to bare metal and present for survey. Post survey paint with 02 coat of Jotamastic 80 black iaw NO 02/2021 and refit back. |
| 80 | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. Type: Anchor Windlass (Chain Size 20.5mm) (a) Overhaul Anchor windlass. Arrest leackages in piping and fittings. Oil level sight glass to be replaced. Overhauling of anchor windlass includes removal of drum,gearbox. Complete grease to be removed, the bearing housing to be washed with cleaner/petrol and throughly dried. Brake drum surfaces to be cleaned and deposited rust,oil grease to be removed. Fresh oil and grease to be charged into sytem. Anchor windlass to be proved for satisfactory operation post overhaulling. Note: Oil and grease to be supplied by Firm. (Oil Qty- 70 Ltrs, Oil Grade- SAE 140), Grease :- Servogem (M/s IOC or equivalent, 10 Kgs) | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. Type: Anchor Windlass (Chain Size 20.5mm) (a) Overhaul Anchor windlass. Arrest leackages in piping and fittings. Oil level sight glass to be replaced. Overhauling of anchor windlass includes removal of drum,gearbox. Complete grease to be removed, the bearing housing to be washed with cleaner/petrol and throughly dried. Brake drum surfaces to be cleaned and deposited rust,oil grease to be removed. Fresh oil and grease to be charged into sytem. Anchor windlass to be proved for satisfactory operation post overhaulling. Note: Oil and grease to be supplied by Firm. (Oil Qty- 70 Ltrs, Oil Grade- SAE 140), Grease :- Servogem (M/s IOC or equivalent, 10 Kgs) |
| 81 | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (b) Renewal of bearings to be carried out. | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (b) Renewal of bearings to be carried out. |
| 82 | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (c) Blow out motor windings throughly with clean dry air. Clean and varnish dirty and oily windlings. Check insulation resistamce to earth and between phases. Air gap to be checked and adjusted Terminals and scres to be cleaned and tightned. Corroded surfaces to be made clean and smooth. Bad contacts to be replaced with new. Any defect during trial to be rectified by firm. | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (c) Blow out motor windings throughly with clean dry air. Clean and varnish dirty and oily windlings. Check insulation resistamce to earth and between phases. Air gap to be checked and adjusted Terminals and scres to be cleaned and tightned. Corroded surfaces to be made clean and smooth. Bad contacts to be replaced with new. Any defect during trial to be rectified by firm. |
| 83 | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (d) Gypsy, Pedestal, linkages, brake & clutch to be cleaned and check for proper operation. Greasing to be done. Adjust clearances to be checked for optimum performance. | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (d) Gypsy, Pedestal, linkages, brake & clutch to be cleaned and check for proper operation. Greasing to be done. Adjust clearances to be checked for optimum performance. |
| 84 | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (e) Break lining to be renewed and prove for satisfactory operation. | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (e) Break lining to be renewed and prove for satisfactory operation. |
| 85 | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (f) Clutching and Declucting arrangement to be overhauled. Rust and old grease to be removed. Defective parts to be repaired/fabricated. Lubrication of clutch arrangements be done. Clutch arrangement system to be proved for satisfactory performance. | 035 Anchor windlass Make: Geeta Engineering Works Pvt. Ltd. (f) Clutching and Declucting arrangement to be overhauled. Rust and old grease to be removed. Defective parts to be repaired/fabricated. Lubrication of clutch arrangements be done. Clutch arrangement system to be proved for satisfactory performance. |
| 86 | 036 Capstan (a) Overhauling of capstan to be carried out. Renew brake linings, refit and prove for satisfactory operation. Dia 400 mm note :- Overhauling involves removal of drum,gearbox, and overhaul of all these items and refitment. | 036 Capstan (a) Overhauling of capstan to be carried out. Renew brake linings, refit and prove for satisfactory operation. Dia 400 mm note :- Overhauling involves removal of drum,gearbox, and overhaul of all these items and refitment. |
| 87 | 036 Capstan (b) Drain Gear unit oil & flush throughly and refill with fresh oil. Note: Oil to be supplied by Firm. (Qty-20 Ltrs) Oil Grade- SAE 140) | 036 Capstan (b) Drain Gear unit oil & flush throughly and refill with fresh oil. Note: Oil to be supplied by Firm. (Qty-20 Ltrs) Oil Grade- SAE 140) |
| 88 | 037 Single bollards Single bollards corroded, thinned and holed. To be renewed as per survey report.Details :- Size of pipe: 280mm dia x1200 mm Height x thickness 12mm. Doubler plate of dia 300mm and 10mm thick, dummy plate of 300mm dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no.s on each bollard. Cross arm rod of 60 mm dia to be fitted | 037 Single bollards Single bollards corroded, thinned and holed. To be renewed as per survey report.Details :- Size of pipe: 280mm dia x1200 mm Height x thickness 12mm. Doubler plate of dia 300mm and 10mm thick, dummy plate of 300mm dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no.s on each bollard. Cross arm rod of 60 mm dia to be fitted |
| 89 | 038 Twin Bollard Twin bollards corroded, thinned and holed, to be renewed as per survey .Details (Dia of bollard pipe: 270mm, Height of bollard: 620mm, Size of bollard base/ foundation: 1140mmx380mmx 220mm; Doubler plate size: 1240mmx500mm; side rods of bollard pipe: 520mmx40mmdia rod; Dummy plate 300mm dia x12mm thick. | 038 Twin Bollard Twin bollards corroded, thinned and holed, to be renewed as per survey .Details (Dia of bollard pipe: 270mm, Height of bollard: 620mm, Size of bollard base/ foundation: 1140mmx380mmx 220mm; Doubler plate size: 1240mmx500mm; side rods of bollard pipe: 520mmx40mmdia rod; Dummy plate 300mm dia x12mm thick. |
| 90 | 037 Single bollards Single bollards corroded, thinned and holed. To be repaired as per survey report.Details :- Size of pipe: 280mm dia x1200 mm Height x thickness 12mm. Doubler plate of dia 300mm and 10mm thick, dummy plate of 300mm dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no.s on each bollard. Cross arm rod of 60 mm dia to be fitted | 037 Single bollards Single bollards corroded, thinned and holed. To be repaired as per survey report.Details :- Size of pipe: 280mm dia x1200 mm Height x thickness 12mm. Doubler plate of dia 300mm and 10mm thick, dummy plate of 300mm dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no.s on each bollard. Cross arm rod of 60 mm dia to be fitted |
| 91 | 038 Rubber beading Rubber beading of wt doors , hatches, scuttles perished/cracked to be renewed and chalk test to be proved. (a) Rubber beading size: specification as per sample.Note: silicon rubber beading to be used as per NCD 5910 | 038 Rubber beading Rubber beading of wt doors , hatches, scuttles perished/cracked to be renewed and chalk test to be proved. (a) Rubber beading size: specification as per sample.Note: silicon rubber beading to be used as per NCD 5910 |
| 92 | 038 Clips Operating Clips/Butterfly nut of wt doors , hatches, scuttles sky light to be removed ,overhauled and fitted back. | 038 Clips Operating Clips/Butterfly nut of wt doors , hatches, scuttles sky light to be removed ,overhauled and fitted back. |
| 93 | 038 Clips Operating Clips of WT doors/hatches broken, to be renewed as per sample. Mat- MS. | 038 Clips Operating Clips of WT doors/hatches broken, to be renewed as per sample. Mat- MS. |
| 94 | 039 WT Hatch metal coaming Metallic coaming of 05 in no WT Hatches on weather deck corroded and thinned. To be renewed as per survey report. Area - 20 Sqm. | 039 WT Hatch metal coaming Metallic coaming of 05 in no WT Hatches on weather deck corroded and thinned. To be renewed as per survey report. Area - 20 Sqm. |
| 95 | 040 Non WT door Non water tight doors (including frames, hinges, locks, door closer, stoppers, handles) of bridge and living spaces damaged. To be renewed. Mat- CRCA/Wood | 040 Non WT door Non water tight doors (including frames, hinges, locks, door closer, stoppers, handles) of bridge and living spaces damaged. To be renewed. Mat- CRCA/Wood |
| 96 | 041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled , renewel of rubber seal and wire mesh to be renewed and fitted back. Damaged mushroom head to be repaired/renewed. (a) Dia: 550mm Dia | 041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled , renewel of rubber seal and wire mesh to be renewed and fitted back. Damaged mushroom head to be repaired/renewed. (a) Dia: 550mm Dia |
| 97 | 041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled , renewel of rubber seal and wire mesh to be renewed and fitted back. Damaged mushroom head to be repaired/renewed. (b) Dia: 360mm Dia | 041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled , renewel of rubber seal and wire mesh to be renewed and fitted back. Damaged mushroom head to be repaired/renewed. (b) Dia: 360mm Dia |
| 98 | 041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled , renewel of rubber seal and wire mesh to be renewed and fitted back. Damaged mushroom head to be repaired/renewed. (c) Dia - 300mm Dia | 041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled , renewel of rubber seal and wire mesh to be renewed and fitted back. Damaged mushroom head to be repaired/renewed. (c) Dia - 300mm Dia |
| 99 | 042 Towing Hook Towing hook to be overhauled and load tested to 25 Tons . note 1 -The job involves overhaul of hook, operating handle, steel wire rope and in way pullies. Note 2 - Load testing will be undertaken by yard certified firm. Any defects occurred during load testing will be rectified by the firm. Firm to submit load test certificate to user department. | 042 Towing Hook Towing hook to be overhauled and load tested to 25 Tons . note 1 -The job involves overhaul of hook, operating handle, steel wire rope and in way pullies. Note 2 - Load testing will be undertaken by yard certified firm. Any defects occurred during load testing will be rectified by the firm. Firm to submit load test certificate to user department. |
| 100 | 043 Tanks/Manhole (a) Manhole of various tanks corroded/thinned. Manholes including coaming to be renewed as per survey carried in DL No. 0007 Size of manhole: 720x520x08mm thick. | 043 Tanks/Manhole (a) Manhole of various tanks corroded/thinned. Manholes including coaming to be renewed as per survey carried in DL No. 0007 Size of manhole: 720x520x08mm thick. |
| 101 | 043 Tanks/Manhole (b) Rubber joints of 720mmx520mmx06mm perished/deteriorated to be renewed. | 043 Tanks/Manhole (b) Rubber joints of 720mmx520mmx06mm perished/deteriorated to be renewed. |
| 102 | 043 Tanks/Manhole (c) Nuts and bolts/ studs of manhole damaged, to be renewed. Size -16 mm Dia and 50 mm length -24 nos. on each manhole. mat-SS | 043 Tanks/Manhole (c) Nuts and bolts/ studs of manhole damaged, to be renewed. Size -16 mm Dia and 50 mm length -24 nos. on each manhole. mat-SS |
| 103 | 044 Nav Light Nav light foundation (Port & Stbd) corroded, to be renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS | 044 Nav Light Nav light foundation (Port & Stbd) corroded, to be renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS |
| 104 | 045 Drainage System (a) Deck Drain pipes corroded/ holed, to be renewed. Dia 2 1/2 inch. Mat: GI Note : Pipes / fittings should be secured with rubber packing's and clamps uniformly | 045 Drainage System (a) Deck Drain pipes corroded/ holed, to be renewed. Dia 2 1/2 inch. Mat: GI Note : Pipes / fittings should be secured with rubber packing's and clamps uniformly |
| 105 | 045 Drainage System (b) Scupper with coaming ( leading from 01 deck to No. 1 deck and bridge top to Boat deck) corroded/ thinned, to be renewed. Size: 100-150mm | 045 Drainage System (b) Scupper with coaming ( leading from 01 deck to No. 1 deck and bridge top to Boat deck) corroded/ thinned, to be renewed. Size: 100-150mm |
| 106 | 045 Drainage System (c ) Deck coaming on wheel house/weather deck/boat deck corroded, to be renewed. Mat - MS Size -8 mm plateNote- The job involves removal and fitment panelling/ lagging/ trunking in the way. | 045 Drainage System (c ) Deck coaming on wheel house/weather deck/boat deck corroded, to be renewed. Mat - MS Size -8 mm plateNote- The job involves removal and fitment panelling/ lagging/ trunking in the way. |
| 107 | 045 Drainage System (d) 4\\" Soil pipes of Crew, ED's and Master's bathrooms to be removed chemically cleaned and fit back. | 045 Drainage System (d) 4\\" Soil pipes of Crew, ED's and Master's bathrooms to be removed chemically cleaned and fit back. |
| 108 | 045 Drainage System (e) 4\\" Soil pipes of Crew, ED's and Master's bathrooms corroded/holed to be renewed | 045 Drainage System (e) 4\\" Soil pipes of Crew, ED's and Master's bathrooms corroded/holed to be renewed |
| 109 | 046 Extinguishers AFFF extinguisher service life expired. Replace with new extinguishers at various places. (a) 9 Ltr AFFF extinguisher | 046 Extinguishers AFFF extinguisher service life expired. Replace with new extinguishers at various places. (a) 9 Ltr AFFF extinguisher |
| 110 | 046 Extinguishers CO2 extinguisher service life expired. Replace with new extinguishers at various places. (b) 2 Kg CO2 Extinguisher | 046 Extinguishers CO2 extinguisher service life expired. Replace with new extinguishers at various places. (b) 2 Kg CO2 Extinguisher |
| 111 | 046 Extinguishers CO2 extinguisher service life expired. Replace with new extinguishers at various places. (c) 10 Kg DCP extinguisher | 046 Extinguishers CO2 extinguisher service life expired. Replace with new extinguishers at various places. (c) 10 Kg DCP extinguisher |
| 112 | 046 Extinguishers (d) Extinguishers securing bracket to be manufactured and fitted at various location as per sample. | 046 Extinguishers (d) Extinguishers securing bracket to be manufactured and fitted at various location as per sample. |
| 113 | 046 Fire Hose Replacement of following hoses with new at various places (e) Fire hoses damaged/perished to be renewed. Fire hoses length 15 mts Dia 63 mm with end coupling of SS. Colour- Red. | 046 Fire Hose Replacement of following hoses with new at various places (e) Fire hoses damaged/perished to be renewed. Fire hoses length 15 mts Dia 63 mm with end coupling of SS. Colour- Red. |
| 114 | 047 Foam solution Supply of Type 3% AFFF concentrate foam and filling in foam tank. | 047 Foam solution Supply of Type 3% AFFF concentrate foam and filling in foam tank. |
| 115 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. Deck covering to be removed and surface perapation to ST3 standard to be carried out. (a) Application of Primer - DFT 50 micron | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. Deck covering to be removed and surface perapation to ST3 standard to be carried out. (a) Application of Primer - DFT 50 micron |
| 116 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (a) Application of Primer - DFT 50 micron | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (a) Application of Primer - DFT 50 micron |
| 117 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (b) Application of Underlay as per NCD 3717 | 48 Deck underlay Deck Covering to be renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (b) Application of Underlay as per NCD 3717 |
| 118 | 048 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments (c) Application of sealer coat and top coat on entire area As Per NCD 3717. | 048 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments (c) Application of sealer coat and top coat on entire area As Per NCD 3717. |
| 119 | 049 Name board Following name board perished/damaged, to be renewed. a) Renewal of vessel name board including electroplating to be carried out on ship side as per sample . | 049 Name board Following name board perished/damaged, to be renewed. a) Renewal of vessel name board including electroplating to be carried out on ship side as per sample . |
| 120 | 049 Name board (b) Tug name board (Wooden) damaged, to be renewed including wooden pad. and letters (SS) are to be electroplated. damaged letter to be renewed. | 049 Name board (b) Tug name board (Wooden) damaged, to be renewed including wooden pad. and letters (SS) are to be electroplated. damaged letter to be renewed. |
| 121 | 049 Name board (c) Word letter of tug name (BALWAN) on bulwark perished at fwd and stern , to be renewed, tug name is to be painted with white paint. | 049 Name board (c) Word letter of tug name (BALWAN) on bulwark perished at fwd and stern , to be renewed, tug name is to be painted with white paint. |
| 122 | 050 Door locks Mortise lock of non WT door defective at various locations , All defective mortise locks to be renewed. | 050 Door locks Mortise lock of non WT door defective at various locations , All defective mortise locks to be renewed. |
| 123 | 050 Door locks Locking arrangement is to be provided in all the WT Hatches/ Door at various locations including hasp and staple arrangement | 050 Door locks Locking arrangement is to be provided in all the WT Hatches/ Door at various locations including hasp and staple arrangement |
| 124 | 051 Sunmica Deck head Sunmica damaged at various locations , to be renewed. | 051 Sunmica Deck head Sunmica damaged at various locations , to be renewed. |
| 125 | 052 MFMB lagging Degutting/regutting of MFMB lagging at accommodation area, wheel house to be carried out. quoted cost should including services and new material. | 052 MFMB lagging Degutting/regutting of MFMB lagging at accommodation area, wheel house to be carried out. quoted cost should including services and new material. |
| 126 | 053 Sanitary system Chemical cleaning of soil and fresh water pipe lines to be carried out at various places. | 053 Sanitary system Chemical cleaning of soil and fresh water pipe lines to be carried out at various places. |
| 127 | 053 Sanitary system WC of crew and master cabin corroded/thinned/holed to be renewed. (a) Ceremic WC commode along with suitable arrangement (Flush tank, piping, valves etc.) to be replaced with new. Make - CERA Note:- Quoted cost shall include cost all items. | 053 Sanitary system WC of crew and master cabin corroded/thinned/holed to be renewed. (a) Ceremic WC commode along with suitable arrangement (Flush tank, piping, valves etc.) to be replaced with new. Make - CERA Note:- Quoted cost shall include cost all items. |
| 128 | 053 Sanitary system Wash basin including drain pipes of crew and master cabin corroded/thinned/holed to be renewed (b) Ceremic Wash basin including drain pipes. Note:- Quoted cost shall include cost all items. | 053 Sanitary system Wash basin including drain pipes of crew and master cabin corroded/thinned/holed to be renewed (b) Ceremic Wash basin including drain pipes. Note:- Quoted cost shall include cost all items. |
| 129 | 053 Sanitary system (c) SS tap: 1/2 inch damaged to be renewed. Make - CERA Note:- Quoted repair cost shall include cost all items. | 053 Sanitary system (c) SS tap: 1/2 inch damaged to be renewed. Make - CERA Note:- Quoted repair cost shall include cost all items. |
| 130 | 053 Sanitary system (d) Supply pipes damaged/broken, to be renewed. Mat - Cu-Ni, Note:- Quoted repair cost shall include cost all items | 053 Sanitary system (d) Supply pipes damaged/broken, to be renewed. Mat - Cu-Ni, Note:- Quoted repair cost shall include cost all items |
| 131 | 053 Sanitary system (e) SS sink in galley damaged, to be renewed including drain pipe and stainer . Size- as per sample Note:- Quoted repair cost shall include cost all items | 053 Sanitary system (e) SS sink in galley damaged, to be renewed including drain pipe and stainer . Size- as per sample Note:- Quoted repair cost shall include cost all items |
| 132 | 053 Sanitary system (f) Water fauucet set in crew/master/ toilet damaged, to be replaced with new. Make - CERA | 053 Sanitary system (f) Water fauucet set in crew/master/ toilet damaged, to be replaced with new. Make - CERA |
| 133 | 053 Sanitary system (g) Mirror as per sample, to be renewed. Note:- Quoted repair cost shall include cost all items | 053 Sanitary system (g) Mirror as per sample, to be renewed. Note:- Quoted repair cost shall include cost all items |
| 134 | 053 Sanitary system (h) SS stop cock 1’’ damaged, to be renewed. Note:- Quoted repair cost shall include cost all items | 053 Sanitary system (h) SS stop cock 1’’ damaged, to be renewed. Note:- Quoted repair cost shall include cost all items |
| 135 | 053 Sanitary system (k) Shower head in bathrooms damaged to be renewed. Note:- Quoted repair cost shall include cost all items | 053 Sanitary system (k) Shower head in bathrooms damaged to be renewed. Note:- Quoted repair cost shall include cost all items |
| 136 | 054 Kit Lockers Kit lockers in crew cabin and master cabin damaged to be renewed,Size- 6ftx1.5ftx1.5ft (mat-CRCA) | 054 Kit Lockers Kit lockers in crew cabin and master cabin damaged to be renewed,Size- 6ftx1.5ftx1.5ft (mat-CRCA) |
| 137 | 055 Fisherman Plate Fisherman Plate Corroded/Thin/holed , to be renewed Mat-MS (a) Fish plate size: 20x20 inch, 10mm thickness | 055 Fisherman Plate Fisherman Plate Corroded/Thin/holed , to be renewed Mat-MS (a) Fish plate size: 20x20 inch, 10mm thickness |
| 138 | 056 Butterfly nut SS butterfly nuts and tumbler bolt of engine room sky light & exhaust flaps broken. To be renewed. Dia of bolt : 20 mm & 6 inch length (Mat-SS) including rubber beading . Rmt-4 rmt | 056 Butterfly nut SS butterfly nuts and tumbler bolt of engine room sky light & exhaust flaps broken. To be renewed. Dia of bolt : 20 mm & 6 inch length (Mat-SS) including rubber beading . Rmt-4 rmt |
| 139 | 057 Guard rail Guard rails on 01 & 02 deck (Port side) corroded/perished . To be renewed. (Mat-GI Pipe) Dia of guard rail pipe:1 ¾’’, | 057 Guard rail Guard rails on 01 & 02 deck (Port side) corroded/perished . To be renewed. (Mat-GI Pipe) Dia of guard rail pipe:1 ¾’’, |
| 140 | 058 Guard rail Securing chain Guard rails securing chain on 01 & 02 deck (Port side) corroded/perished . To be renewed. mat-GI | 058 Guard rail Securing chain Guard rails securing chain on 01 & 02 deck (Port side) corroded/perished . To be renewed. mat-GI |
| 141 | 059 Ventilation Breather pipes including head damaged/corroded at various location on upper deck same to be renewed. Breather pipe to be secured with SS nut bolt. | 059 Ventilation Breather pipes including head damaged/corroded at various location on upper deck same to be renewed. Breather pipe to be secured with SS nut bolt. |
| 142 | 059 Ventilation Ventilation flap corroded/thinned at varios location. Ventiulation flap to be renewed including Wire mesh and rubber beading. | 059 Ventilation Ventilation flap corroded/thinned at varios location. Ventiulation flap to be renewed including Wire mesh and rubber beading. |
| 143 | 060 Bulwark doors Bulwark doors on weather deck jammed /dented/damaged. To be renewed. MAT - MS. | 060 Bulwark doors Bulwark doors on weather deck jammed /dented/damaged. To be renewed. MAT - MS. |
| 144 | 061 Cleats MS cleats on (P & S) bulwark including doubler plates damaged. To be renewed. Size -28 MM | 061 Cleats MS cleats on (P & S) bulwark including doubler plates damaged. To be renewed. Size -28 MM |
| 145 | 062 Boxes (a) Fire hose securing boxes and its glass damaged at various locations. To be renewed as per sample. | 062 Boxes (a) Fire hose securing boxes and its glass damaged at various locations. To be renewed as per sample. |
| 146 | 062 Boxes (b) Boxes of various control panel corroded/thinned/holed at various locations. To be renewed as per sample. (Mat-MS/CRCA) | 062 Boxes (b) Boxes of various control panel corroded/thinned/holed at various locations. To be renewed as per sample. (Mat-MS/CRCA) |
| 147 | 063 Wooden cup board Wooden lockers damaged at various locations to be renewed. Job including renewal of locks and handles. | 063 Wooden cup board Wooden lockers damaged at various locations to be renewed. Job including renewal of locks and handles. |
| 148 | 064 Wooden table Wooden table damaged at dining hall and cabins. To be repaired/renewel. Job includes renewal of drawers, sliding channels, hinges, locks and handles. | 064 Wooden table Wooden table damaged at dining hall and cabins. To be repaired/renewel. Job includes renewal of drawers, sliding channels, hinges, locks and handles. |
| 149 | 065 Sofa/chairs Sofa cushion and cover torn in ED and Master's cabins. Sofa to be renewed. | 065 Sofa/chairs Sofa cushion and cover torn in ED and Master's cabins. Sofa to be renewed. |
| 150 | 065 Sofa/chairs Chairs in wheels house ,ED and Master's cabins damaged/broken. Chairs to be renewed with adjustable, rollers chairs. | 065 Sofa/chairs Chairs in wheels house ,ED and Master's cabins damaged/broken. Chairs to be renewed with adjustable, rollers chairs. |
| 151 | 066 Panelling SS/CRCA panelling at indicated locations damaged to be renewed. | 066 Panelling SS/CRCA panelling at indicated locations damaged to be renewed. |
| 152 | 067 STP (a) Serviceability check of low level and high level float switch to be carried out. | 067 STP (a) Serviceability check of low level and high level float switch to be carried out. |
| 153 | 067 STP (b) Overhauling of discharge pump to be carried out. Pump to be proved for satisfactory performance | 067 STP (b) Overhauling of discharge pump to be carried out. Pump to be proved for satisfactory performance |
| 154 | 067 STP (c) Overhauling of pressure blower to be carried out. Prove for satisfactory operation. | 067 STP (c) Overhauling of pressure blower to be carried out. Prove for satisfactory operation. |
| 155 | 067 STP (d) Overhauling and pressure testing of isolating valves to be carried out. | 067 STP (d) Overhauling and pressure testing of isolating valves to be carried out. |
| 156 | 067 STP (e) Overhauling of chlorination and chlorination pumps to be carried out. | 067 STP (e) Overhauling of chlorination and chlorination pumps to be carried out. |
| 157 | 067 STP (f) Serviceability/Overhauling of activated sludge airflow meter to be carried out. | 067 STP (f) Serviceability/Overhauling of activated sludge airflow meter to be carried out. |
| 158 | 067 STP (g) Serviceability checks/ Calibration of discharge flow meter to be carried out. | 067 STP (g) Serviceability checks/ Calibration of discharge flow meter to be carried out. |
| 159 | 067 STP (h) Firm to undertake Cleaning of sewage collection tanks including pipe lines of WCs which was connected WCs to STP tanks. (Length of pipe lines ). Chemical cleaning of all pipe line of STP to be carried out and fitted back | 067 STP (h) Firm to undertake Cleaning of sewage collection tanks including pipe lines of WCs which was connected WCs to STP tanks. (Length of pipe lines ). Chemical cleaning of all pipe line of STP to be carried out and fitted back |
| 160 | 067 STP (MAKE WARTSILA) (j) Chlorination and chlorination tank are to be cleaned and refilled.Note: On completion of overhauling of complete STP plant, satisfactory trials in presence of OEM rep and ship staff to be conducted. | 067 STP (MAKE WARTSILA) (j) Chlorination and chlorination tank are to be cleaned and refilled.Note: On completion of overhauling of complete STP plant, satisfactory trials in presence of OEM rep and ship staff to be conducted. |
| 161 | 067 STP Firm to undertake overhauluing of system valves . (Qty- 05, Dia-50mm) | 067 STP Firm to undertake overhauluing of system valves . (Qty- 05, Dia-50mm) |
| 162 | 067 STP PVC pipe line damaged/deformed. To be renewed. | 067 STP PVC pipe line damaged/deformed. To be renewed. |
| 163 | 067 STP Firm to undertake Painting of STP tanks including surface preparation of tanks as per i.a.w .NO- 53/16 and as per OEM manual. | 067 STP Firm to undertake Painting of STP tanks including surface preparation of tanks as per i.a.w .NO- 53/16 and as per OEM manual. |
| 164 | 068 Fixed H2s Sensor Firm to undertake Calibration of Fixed H2S sensors in the vicinity of STP compartment. (OEM - Hi-point) Note:- H2S sensors Firm to undertake Calibration certificate by OEM to be submitted. | 068 Fixed H2s Sensor Firm to undertake Calibration of Fixed H2S sensors in the vicinity of STP compartment. (OEM - Hi-point) Note:- H2S sensors Firm to undertake Calibration certificate by OEM to be submitted. |
| 165 | 068 Portable H2S Sensor Firm to undertake Calibration checks of portable H2S sensors. (OEM - Hi-Point Services Pvt. Ltd.). Note:- Firm to submit Calibration checks certificate. | 068 Portable H2S Sensor Firm to undertake Calibration checks of portable H2S sensors. (OEM - Hi-Point Services Pvt. Ltd.). Note:- Firm to submit Calibration checks certificate. |
| 166 | 068 Fixed H2s Sensor Firm to undertake serviciability checks of Fixed H2S sensors in the vicinity of STP compartment.Defect observed during serviciability checks to be rectified by the firm. (OEM - Hi-point) | 068 Fixed H2s Sensor Firm to undertake serviciability checks of Fixed H2S sensors in the vicinity of STP compartment.Defect observed during serviciability checks to be rectified by the firm. (OEM - Hi-point) |
| 167 | 068 Portable H2s Sensor Firm to undertake serviciability checks of portable H2S sensors. Defect observed during serviciability checks to be rectified by the firm. (OEM - Hi-point) | 068 Portable H2s Sensor Firm to undertake serviciability checks of portable H2S sensors. Defect observed during serviciability checks to be rectified by the firm. (OEM - Hi-point) |
| 168 | 069 Bunk Bunks in crew rest room / Master's cabin damaged to be repaired. MAT-CRCA | 069 Bunk Bunks in crew rest room / Master's cabin damaged to be repaired. MAT-CRCA |
| 169 | 070 Wooden Panelling Wooden Panelling in living spaces/wheel house and other areas damaged at various locations. To be renewed. Mat plywood/Sunmica | 070 Wooden Panelling Wooden Panelling in living spaces/wheel house and other areas damaged at various locations. To be renewed. Mat plywood/Sunmica |
| 170 | 071 Seating arrangement Metallic seating arrangement on foxle corroded, thinned and holed. Seating arrangement to be provisioned. Size: 1500x750x700MM. Mat: MS Plate: 06MM thickness, Stand made of Angles and welded on deck. | 071 Seating arrangement Metallic seating arrangement on foxle corroded, thinned and holed. Seating arrangement to be provisioned. Size: 1500x750x700MM. Mat: MS Plate: 06MM thickness, Stand made of Angles and welded on deck. |
| 171 | 072Mattress Mattresses in crew room/master/engineer cabin torn. To be replaced including cover and pillow as per sample. | 072Mattress Mattresses in crew room/master/engineer cabin torn. To be replaced including cover and pillow as per sample. |
| 172 | 073Misc (a) Firm to replace with new Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs | 073Misc (a) Firm to replace with new Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs |
| 173 | 073 Misc (b) Firm to replace with new Self Adhesive Photo luminescent stickers IMO Symbols & Safety Sign/Escape Route Sign. (150 mm x 50mm) . Firm to provide stickers as per sample. | 073 Misc (b) Firm to replace with new Self Adhesive Photo luminescent stickers IMO Symbols & Safety Sign/Escape Route Sign. (150 mm x 50mm) . Firm to provide stickers as per sample. |
| 174 | 074LaddersLadders hand rail and steps damaged/perished. Hand rail and ateps to be repaired/renewed. | 074LaddersLadders hand rail and steps damaged/perished. Hand rail and ateps to be repaired/renewed. |
| 175 | 075PaintingPainting of system pipeline (fireman , fuel , fresh water, soil pipe ) to be carried as per colour coading indicated by user department. | 075PaintingPainting of system pipeline (fireman , fuel , fresh water, soil pipe ) to be carried as per colour coading indicated by user department. |
| 176 | 076Flag pullyFlag hoist pully corroded/damaged. Pullies along with rope to be renewed. | 076Flag pullyFlag hoist pully corroded/damaged. Pullies along with rope to be renewed. |
| 177 | 077MastOverhauling of collasible mast to be carried out.Ease out all movable parts. Replace corroded nut bolt. | 077MastOverhauling of collasible mast to be carried out.Ease out all movable parts. Replace corroded nut bolt. |
| 178 | 078GUARDRAILGuardrail damaged/reformed at various location to be renewed. Mat - GI pipe. | 078GUARDRAILGuardrail damaged/reformed at various location to be renewed. Mat - GI pipe. |
| 179 | 079 Automatic Release Hook Provisioning and fitment of ARH in Boat Davit.Note: ARH to comply with IHQ Policy NC/ Policy/ H-136/ Equipment dated 25 Oct 18. | 079 Automatic Release Hook Provisioning and fitment of ARH in Boat Davit.Note: ARH to comply with IHQ Policy NC/ Policy/ H-136/ Equipment dated 25 Oct 18. |
| 180 | 080 Single arm davit (a) Overhauling of Single arm davit is to be carried out, prove for satisfactory opertaion. Note: overhauling includes removal, cleaning, greasing and refitment of wire rope, overhauling of gear box. | 080 Single arm davit (a) Overhauling of Single arm davit is to be carried out, prove for satisfactory opertaion. Note: overhauling includes removal, cleaning, greasing and refitment of wire rope, overhauling of gear box. |
| 181 | 080 Single arm davit (b)The Centrifugal Brake assembly (Two Brake Shoes lined with Friction lining & Restrained by Spring on Each shoe) to be Overhauled . Renew Brake Shoes,Friction lining. Prove for satisfactory Operation. | 080 Single arm davit (b)The Centrifugal Brake assembly (Two Brake Shoes lined with Friction lining & Restrained by Spring on Each shoe) to be Overhauled . Renew Brake Shoes,Friction lining. Prove for satisfactory Operation. |
| 182 | 080 Single arm davit (c) Single Arm Boat Davit Motor overhauling to carry out, Prove for satisfactory Operation | 080 Single arm davit (c) Single Arm Boat Davit Motor overhauling to carry out, Prove for satisfactory Operation |
| 183 | 080 Single arm davit (d) Gear Box to be inspected, Flush Through the system. Fresh Oil to be Charged . (Oil Grade SAE-90) (Oil Qty- 40 Ltrs) (Oil to be supplied by firm) | 080 Single arm davit (d) Gear Box to be inspected, Flush Through the system. Fresh Oil to be Charged . (Oil Grade SAE-90) (Oil Qty- 40 Ltrs) (Oil to be supplied by firm) |
| 184 | 080 Single arm davit (e) Dead Man Brake Assembly to be overhauled. Renew the brake shoes. Check brake drum and Clean drum surfaces. Prove Dead man brake assembly for satisfactory Operation. | 080 Single arm davit (e) Dead Man Brake Assembly to be overhauled. Renew the brake shoes. Check brake drum and Clean drum surfaces. Prove Dead man brake assembly for satisfactory Operation. |
| 185 | 080 Single arm davit (g) Check the functioning of all limit switches. Renew Defective limit switches Prove for satisfactory Operation. | 080 Single arm davit (g) Check the functioning of all limit switches. Renew Defective limit switches Prove for satisfactory Operation. |
| 186 | 080 Single arm davit (h) Load Test of Single Arm Boat Davit to be carried out. | 080 Single arm davit (h) Load Test of Single Arm Boat Davit to be carried out. |
| 187 | 081 Steel wire rope (a) Servicibilty checks of steel wire rope is to be carried out and renewed if unserviceable and load tested upto 1.5 times of SWL.as per INBR 1552 (SWL- 1250 kgs), Submit a copy of load test to this office. | 081 Steel wire rope (a) Servicibilty checks of steel wire rope is to be carried out and renewed if unserviceable and load tested upto 1.5 times of SWL.as per INBR 1552 (SWL- 1250 kgs), Submit a copy of load test to this office. |
| 188 | 081 Steel wire rope (d) Renewal of steel wire rope to be carried out and Initial load test certificate to be rendered | 081 Steel wire rope (d) Renewal of steel wire rope to be carried out and Initial load test certificate to be rendered |
| 189 | 082 Water purifier/ Water cooler (a) Provision Of Drinking Water Purifier of 09 Ltr Capacity . Work Also Involves Fitment, Piping Arrangement And Commissioning Of The System. –With 02 Set Of Spares Including Filter And Membrane. Work Includes Provisioning Of Following Spares Also :- (i) RO Membrane Welded -02 , (ii) RO Membrane High Flow-02 (iii) Inline Carbon filter-02 , (iv) Inline Sediment Filter- 02 , (v) Activated Carbon Filter (Excel Elite) , (vi) Post Carbon Filter-02 | 082 Water purifier/ Water cooler (a) Provision Of Drinking Water Purifier of 09 Ltr Capacity . Work Also Involves Fitment, Piping Arrangement And Commissioning Of The System. –With 02 Set Of Spares Including Filter And Membrane. Work Includes Provisioning Of Following Spares Also :- (i) RO Membrane Welded -02 , (ii) RO Membrane High Flow-02 (iii) Inline Carbon filter-02 , (iv) Inline Sediment Filter- 02 , (v) Activated Carbon Filter (Excel Elite) , (vi) Post Carbon Filter-02 |
| 190 | 082 Water purifier/ Water cooler (b) Water Cooler with inbult Purifier Firm to provision Water storage Cooler cum water purifier (RO/UV), Water Storage capacity 30 to 40 Ltrs. Job includes provision of Aquagaurd water purifier, water inlet pipe from fresh water tank to Aqua guard and from Aqua gaurd to water cooler. Size of GI pipe 1/2\\", Length 30 mtr.Firm to consider all cost w.r.t. to fitment of water cooler and prove for optimum performance. Details of Water Cooler:- Minimum three stage purification 1st stage of purification:- Sediment Filteration , 2nd Stage of Purification:- Carbon Filteration, 3rd Stage of Purification:- UV Filteration, Body Material :- Stainless Steel, Storage tank material:- SS 304,Thermal Insulation for storage tanks:- PUF , No of water Faucets:- 02, Make:- Aquaguard/Voltas/Blue Star. Firm to provide 02 Sets of all filters. | 082 Water purifier/ Water cooler (b) Water Cooler with inbult Purifier Firm to provision Water storage Cooler cum water purifier (RO/UV), Water Storage capacity 30 to 40 Ltrs. Job includes provision of Aquagaurd water purifier, water inlet pipe from fresh water tank to Aqua guard and from Aqua gaurd to water cooler. Size of GI pipe 1/2\\", Length 30 mtr.Firm to consider all cost w.r.t. to fitment of water cooler and prove for optimum performance. Details of Water Cooler:- Minimum three stage purification 1st stage of purification:- Sediment Filteration , 2nd Stage of Purification:- Carbon Filteration, 3rd Stage of Purification:- UV Filteration, Body Material :- Stainless Steel, Storage tank material:- SS 304,Thermal Insulation for storage tanks:- PUF , No of water Faucets:- 02, Make:- Aquaguard/Voltas/Blue Star. Firm to provide 02 Sets of all filters. |
| 191 | 083 Awning Repair of damaged awning shade frame (at Foxle ) of GI pipes and fitment of the same on fwd. Job includes necessary modification to facilitate fitment of fixed awning (a) Size: 2m x 5.5 m Approx. Mat: GI pipe (b) SIZE - 6 X 3 M Approx. | 083 Awning Repair of damaged awning shade frame (at Foxle ) of GI pipes and fitment of the same on fwd. Job includes necessary modification to facilitate fitment of fixed awning (a) Size: 2m x 5.5 m Approx. Mat: GI pipe (b) SIZE - 6 X 3 M Approx. |
| 192 | 083 Awning Renewal of damaged awning shade frame (at aft side) of GI pipes and fitment of the same on AFT. Job includes necessary modification to facilitate fitment of fixed awning (a) Size: 2m x 5.5 m Approx. Mat: GI pipe (b) SIZE - 6 X 3 M Approx. | 083 Awning Renewal of damaged awning shade frame (at aft side) of GI pipes and fitment of the same on AFT. Job includes necessary modification to facilitate fitment of fixed awning (a) Size: 2m x 5.5 m Approx. Mat: GI pipe (b) SIZE - 6 X 3 M Approx. |
| 193 | 083 Awning CPVC Awning at Foxle and at aft side (c) Renewal of CPVC awning/Roofing sheet over the frame using Nut Bolt. Mat -C PVC. Size - 3mm thickness | 083 Awning CPVC Awning at Foxle and at aft side (c) Renewal of CPVC awning/Roofing sheet over the frame using Nut Bolt. Mat -C PVC. Size - 3mm thickness |
| 194 | 084 CPVC roofing Sheet CPVC roofing Sheet at Foxle and at aft side (a) Renewal of CPVC roofing sheets over the frame using nut bolts. Sheet thickness- 3mm Mat - CPVCNote:- Quoted cost include all items. | 084 CPVC roofing Sheet CPVC roofing Sheet at Foxle and at aft side (a) Renewal of CPVC roofing sheets over the frame using nut bolts. Sheet thickness- 3mm Mat - CPVCNote:- Quoted cost include all items. |
| 195 | 085 Foot step Foot step on foxle near bollard corroded/thinned/holed, including foundations , to be repaired, as per survey report, mat- Al chequered plate And MS Angle bar. | 085 Foot step Foot step on foxle near bollard corroded/thinned/holed, including foundations , to be repaired, as per survey report, mat- Al chequered plate And MS Angle bar. |
| 196 | 086 Life Saving Appliance (a) Firm to supply new stretcher (Neil Robertson Stretcher). | 086 Life Saving Appliance (a) Firm to supply new stretcher (Neil Robertson Stretcher). |
| 197 | 086 Life Saving Appliance (b) Firm to supply automatic fire ball for fire extinguishing (Dry Chemical powder, 1.3 Kgs). Mounting for fire ball to be provisioned at indicated location at bridge/Engine/Steering room. (Qty- 05 Nos) | 086 Life Saving Appliance (b) Firm to supply automatic fire ball for fire extinguishing (Dry Chemical powder, 1.3 Kgs). Mounting for fire ball to be provisioned at indicated location at bridge/Engine/Steering room. (Qty- 05 Nos) |
| 198 | 086 Life Saving Appliance (c) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including Hydrostatic release Unit (HRU Hammer H20 R), eye on deck. | 086 Life Saving Appliance (c) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including Hydrostatic release Unit (HRU Hammer H20 R), eye on deck. |
| 199 | 086 Life Saving Appliance (d) Firm to replace with new life jacket made as per SOLAS/IRS/MMD standard (with ISO Certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lanyard reflective tape 04 nos | 086 Life Saving Appliance (d) Firm to replace with new life jacket made as per SOLAS/IRS/MMD standard (with ISO Certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lanyard reflective tape 04 nos |
| 200 | 086 Life Saving Appliance (c) Firm to supply new life buoy (Tug Name to be indicated) | 086 Life Saving Appliance (c) Firm to supply new life buoy (Tug Name to be indicated) |
| 201 | 086 Life Saving Appliance (d) Life buoy securing bracket corroded/thinned, to be renewed. | 086 Life Saving Appliance (d) Life buoy securing bracket corroded/thinned, to be renewed. |
| 202 | 086 Lifebuoy Lifebuoys to be painted as per sample including lettering and symbols. | 086 Lifebuoy Lifebuoys to be painted as per sample including lettering and symbols. |
| 203 | 087Misc (a) Firm to replace with new Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs | 087Misc (a) Firm to replace with new Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs |
| 204 | 087 Misc (b) Firm to replace with new Self Adhesive retro reflective IMO Symbols & Safety Sign. (150 mm x 150mm) . Firm to provide stickers as per sample | 087 Misc (b) Firm to replace with new Self Adhesive retro reflective IMO Symbols & Safety Sign. (150 mm x 150mm) . Firm to provide stickers as per sample |
| 205 | 087 Misc (c) Fire line adaptor and valve arrangement to be replaced with new. Firm to supply new material as per sample. (Dia 65 mm) | 087 Misc (c) Fire line adaptor and valve arrangement to be replaced with new. Firm to supply new material as per sample. (Dia 65 mm) |
| 206 | 087 Misc (d) Firm to supply a light weight gangway (5 Mtrs, Aluminium) for Safeway for worker/crew to board on tug. | 087 Misc (d) Firm to supply a light weight gangway (5 Mtrs, Aluminium) for Safeway for worker/crew to board on tug. |
| 207 | ENGINEERING WORK PACKAGE1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C Firm to undertake routines mentioned in the subsequent defect list serials through OEM/OEM authorised firm only. All special tools required for overhauling shall be provided by Firm. | ENGINEERING WORK PACKAGE1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C Firm to undertake routines mentioned in the subsequent defect list serials through OEM/OEM authorised firm only. All special tools required for overhauling shall be provided by Firm. |
| 208 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C a) Main Engine Coolant to be drained, Coolant system/circuit to be cleaned using OEM recommended solvent and flushed through. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C a) Main Engine Coolant to be drained, Coolant system/circuit to be cleaned using OEM recommended solvent and flushed through. |
| 209 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C b) Post cleaning and flushing fresh coolant to be charged into the system. Job involves cleaning, flushing of complete system and charging of coolant for main engine cooling system. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C b) Post cleaning and flushing fresh coolant to be charged into the system. Job involves cleaning, flushing of complete system and charging of coolant for main engine cooling system. |
| 210 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C c) Belt to be inspected and tightened to be adjusted . | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C c) Belt to be inspected and tightened to be adjusted . |
| 211 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C d) Coolant temperature regulator to be checked for proper functioning. Defective regulator to be replaced with new.. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C d) Coolant temperature regulator to be checked for proper functioning. Defective regulator to be replaced with new.. |
| 212 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C e) Main Engine Heat Exchangers (Plate type) to be chemically cleaned & pressure tested. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C e) Main Engine Heat Exchangers (Plate type) to be chemically cleaned & pressure tested. |
| 213 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C f) The liner and O-rings of heat exchanger to be renewed. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C f) The liner and O-rings of heat exchanger to be renewed. |
| 214 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C g) Zinc anodes along with brass plugs to be renewed. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C g) Zinc anodes along with brass plugs to be renewed. |
| 215 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C h) The plates of fresh water heat exchanger to be inspected. The damaged aluminium plates and end titanium plates to be reconditioned and machined. Cold repairs on Plates to be carried out and prove for satisfactory operation. Repair of cost to includes cost of material and services. Firm to consider Belzona cold repairs compound , Belzona-1111 super Metal Thickness : 1 MM | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C h) The plates of fresh water heat exchanger to be inspected. The damaged aluminium plates and end titanium plates to be reconditioned and machined. Cold repairs on Plates to be carried out and prove for satisfactory operation. Repair of cost to includes cost of material and services. Firm to consider Belzona cold repairs compound , Belzona-1111 super Metal Thickness : 1 MM |
| 216 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C j) Overhauling of pressure regulating valve to be carried out . PRV to be proved for satisfactory operation. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C j) Overhauling of pressure regulating valve to be carried out . PRV to be proved for satisfactory operation. |
| 217 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C k) Pressure gauges for upstream & downstream valves to be replaced with new . | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C k) Pressure gauges for upstream & downstream valves to be replaced with new . |
| 218 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C m) Main Engine Fresh Water pump to be overhauled. Dismantle pump completely. examine all parts for wear. renew defective parts. carry out performance trail on completion. Pump to prove for satisfactory performance. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material) | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C m) Main Engine Fresh Water pump to be overhauled. Dismantle pump completely. examine all parts for wear. renew defective parts. carry out performance trail on completion. Pump to prove for satisfactory performance. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material) |
| 219 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C n) Main Engine Sea Water pump to be fitted & Pump to prove for satisfactory performance | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C n) Main Engine Sea Water pump to be fitted & Pump to prove for satisfactory performance |
| 220 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, p) Provision of suction and discharge pressure gauges (0-5 Bar) for both main engine sea water pump. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, p) Provision of suction and discharge pressure gauges (0-5 Bar) for both main engine sea water pump. |
| 221 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, q) Sea Water Suction strainer to be replaced with new | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, q) Sea Water Suction strainer to be replaced with new |
| 222 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, r) Mud boxes to be cleaned internally/externally and Post cleaning anti corrosive paint to be coated. Stud/Nuts (Material : SS ) and air vent valve size 1/4\\" (Mat: Brass) to be replaced with new. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, r) Mud boxes to be cleaned internally/externally and Post cleaning anti corrosive paint to be coated. Stud/Nuts (Material : SS ) and air vent valve size 1/4\\" (Mat: Brass) to be replaced with new. |
| 223 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C s) Main engine Lub oil Filters to be replaced. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C s) Main engine Lub oil Filters to be replaced. |
| 224 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C t) Main engine Sump to be drained, sump to be cleaned and system to be flushed through. Post cleaning and flushing main engine sump to be charged with fresh Lub oil. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C t) Main engine Sump to be drained, sump to be cleaned and system to be flushed through. Post cleaning and flushing main engine sump to be charged with fresh Lub oil. |
| 225 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C u) SOS Lub Oil analysis to be carried out | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C u) SOS Lub Oil analysis to be carried out |
| 226 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C v) Chemical Cleaning & pressure testing of the Lub oil cooler to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C v) Chemical Cleaning & pressure testing of the Lub oil cooler to be carried out. |
| 227 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, w) Both main Engines Tappets setting to be checked and adjusted. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, w) Both main Engines Tappets setting to be checked and adjusted. |
| 228 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, x) Defective gaskets for Cyl. head cover to be replaced with new. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, x) Defective gaskets for Cyl. head cover to be replaced with new. |
| 229 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C y) After Coolers for both Main engines to be clean & pressure tested. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C y) After Coolers for both Main engines to be clean & pressure tested. |
| 230 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C z) Defective Gaskets,Oring/Seal Rings to be replaced with new. Firm to provide all spares and consumables and prove for satisfactory operation. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C z) Defective Gaskets,Oring/Seal Rings to be replaced with new. Firm to provide all spares and consumables and prove for satisfactory operation. |
| 231 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, aa) Calibration of Fuel injectors to be carried out. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, aa) Calibration of Fuel injectors to be carried out. |
| 232 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ab) Main engine Fuel oil Primary Filters to be replaced. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ab) Main engine Fuel oil Primary Filters to be replaced. |
| 233 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, ac) Main Engine Fuel Oil Secondary Filters to be replaced | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, ac) Main Engine Fuel Oil Secondary Filters to be replaced |
| 234 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ad) Overhauling of Air starting motors to be carried out and prove for satisfactory performance. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ad) Overhauling of Air starting motors to be carried out and prove for satisfactory performance. |
| 235 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ae) Firm to supply new Air Starting motor. Fitment of motors to be carried out and prove for satisfactory performance. Model T50P T510-60048-01R | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ae) Firm to supply new Air Starting motor. Fitment of motors to be carried out and prove for satisfactory performance. Model T50P T510-60048-01R |
| 236 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C af) Firm to supply and fitment of Air Starter Solenoid Valve to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C af) Firm to supply and fitment of Air Starter Solenoid Valve to be carried out. |
| 237 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ag) Firm to supply and fitment of Integrated relay valve on Starter Motor to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ag) Firm to supply and fitment of Integrated relay valve on Starter Motor to be carried out. |
| 238 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ah) Firm to supply and fitment of Air supply hoses connected with starter motor to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ah) Firm to supply and fitment of Air supply hoses connected with starter motor to be carried out. |
| 239 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLARaj) The moisture separator to be provisioned before air starter. The separator to be provided by firm. Details of moisture separator are as follows:- Make: Hydint/Ceson , Design Press/Working press : 16 Bar, Test Press: 24 Bar, Size 1 1/2\\", Element : S/ Steel , Line Size: 40 mm.. Fitment of moisture separator to be carried out and prove for satisfactory trials. Job includes fabrication/renewal of system pipe line, joints, connection , flanges etc. Firm to quote for required spares and material to undertake job | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLARaj) The moisture separator to be provisioned before air starter. The separator to be provided by firm. Details of moisture separator are as follows:- Make: Hydint/Ceson , Design Press/Working press : 16 Bar, Test Press: 24 Bar, Size 1 1/2\\", Element : S/ Steel , Line Size: 40 mm.. Fitment of moisture separator to be carried out and prove for satisfactory trials. Job includes fabrication/renewal of system pipe line, joints, connection , flanges etc. Firm to quote for required spares and material to undertake job |
| 240 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ak) Main engine air cleaner element to be replaced. Item Patt no. 290-1935. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ak) Main engine air cleaner element to be replaced. Item Patt no. 290-1935. |
| 241 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, am) Chemical cleaning and painting ( heat resistant ) of exhaust Pipe of both MEs. Size 200 mm | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, am) Chemical cleaning and painting ( heat resistant ) of exhaust Pipe of both MEs. Size 200 mm |
| 242 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, an) Mechanical cleaning of exhaust drain line of both MEs, Size 20 mm. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, an) Mechanical cleaning of exhaust drain line of both MEs, Size 20 mm. |
| 243 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ap) Main Engine Exhaust System- Inspection and cleaning of exhaust manifold to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ap) Main Engine Exhaust System- Inspection and cleaning of exhaust manifold to be carried out. |
| 244 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C aq) Main Engine Exhaust System- Pressure testing of exhaust manifold to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C aq) Main Engine Exhaust System- Pressure testing of exhaust manifold to be carried out. |
| 245 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ar) Overhauling of Turbocharger to be carried out. Seal rings, O-rings to be replaced with new. Turbocharger to be prove for satisfactory operation. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ar) Overhauling of Turbocharger to be carried out. Seal rings, O-rings to be replaced with new. Turbocharger to be prove for satisfactory operation. |
| 246 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C as) Turbo Charger cartridge/ repair kit to be replaced with new. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C as) Turbo Charger cartridge/ repair kit to be replaced with new. |
| 247 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C at) Hoses & Clamps fitted on both main engine to be replaced with new. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C at) Hoses & Clamps fitted on both main engine to be replaced with new. |
| 248 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C au) All Instrumentation gauges for main engines to be renewed. (As per sample) | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C au) All Instrumentation gauges for main engines to be renewed. (As per sample) |
| 249 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, av) Inspect crankshaft vibration damper | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, av) Inspect crankshaft vibration damper |
| 250 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, aw) Replace corrosion protection zinc rods | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, aw) Replace corrosion protection zinc rods |
| 251 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, ax) Replace fumes disposal filter. | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, ax) Replace fumes disposal filter. |
| 252 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ay) Replacement of Engine crank case breather to be carried out. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C ay) Replacement of Engine crank case breather to be carried out. |
| 253 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C az) Main Engines complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply anti rust coating to engine body. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C az) Main Engines complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply anti rust coating to engine body. |
| 254 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C aaa) Post completion of cleaning, Heat resistance paint to be applied on both engine body. Note:- Cautions to be taken while cleaning of engine. Sensors and controls not to be damaged during job. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C aaa) Post completion of cleaning, Heat resistance paint to be applied on both engine body. Note:- Cautions to be taken while cleaning of engine. Sensors and controls not to be damaged during job. |
| 255 | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C aab) Check and correct tightening of engine fastening bolts, engine mounts. | 1001EQPT: MAIN ENGINE (PORT & STBD), MAKE : M/S CATERPILLAR, MODEL- 3512C aab) Check and correct tightening of engine fastening bolts, engine mounts. |
| 256 | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aac) Both main Engines to be provided with sea water emergency cooling pipe lines. | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aac) Both main Engines to be provided with sea water emergency cooling pipe lines. |
| 257 | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aad) Main Engines thermostat valves (for cooling system) to be replaced with new and prove for satisfactory performance | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aad) Main Engines thermostat valves (for cooling system) to be replaced with new and prove for satisfactory performance |
| 258 | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aae) Stbd Main Enigne sea water pump discharge line flange & bolts are to be renewed. Mat: SS | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aae) Stbd Main Enigne sea water pump discharge line flange & bolts are to be renewed. Mat: SS |
| 259 | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aaf) Pressure gauges to be provided for Sea water pump discharge line. 0-5 bar | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aaf) Pressure gauges to be provided for Sea water pump discharge line. 0-5 bar |
| 260 | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aag) NRVs to be provided for Main Engine Sea water pumps discharge linnes. | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aag) NRVs to be provided for Main Engine Sea water pumps discharge linnes. |
| 261 | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aah) Provisioning of FRL (Filter Regulator Lubricator) to air starting system | 1001EQPT : MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C aah) Provisioning of FRL (Filter Regulator Lubricator) to air starting system |
| 262 | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, aaj) Cold and Hot SDC to be proved, followed by Basin trials and Harbour trials to be carried out proved for satisfactory performance | 1001, EQPT : MAIN ENGINES, MAKE : CATERPILLER, MODEL-3512C, aaj) Cold and Hot SDC to be proved, followed by Basin trials and Harbour trials to be carried out proved for satisfactory performance |
| 263 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TA, Firm to undertake routines mentioned in the subsequent defect list serials through OEM/OEM authorised firm only. All special tools required for overhauling shall be provided by Firm. | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TA, Firm to undertake routines mentioned in the subsequent defect list serials through OEM/OEM authorised firm only. All special tools required for overhauling shall be provided by Firm. |
| 264 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAa) Carry out cleaning and pressure testing of charge air coolers | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAa) Carry out cleaning and pressure testing of charge air coolers |
| 265 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAb) Pressure testing of Fuel injectors to be carried out. Calibration certificates to be submitted | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAb) Pressure testing of Fuel injectors to be carried out. Calibration certificates to be submitted |
| 266 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAc) Fuel Injection pump to be calibrated | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAc) Fuel Injection pump to be calibrated |
| 267 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAd) Fuel feed pump to be calibrated | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAd) Fuel feed pump to be calibrated |
| 268 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAe) Overhauling of Sea water pumps. Firm required to replace impeller, shaft, shaft keys, mechanical seals, end bearings, O rings, Gaskets, washers | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAe) Overhauling of Sea water pumps. Firm required to replace impeller, shaft, shaft keys, mechanical seals, end bearings, O rings, Gaskets, washers |
| 269 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAf) Fuel water seperator to be provided | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAf) Fuel water seperator to be provided |
| 270 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAg) Vibration mounts to be renewed | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAg) Vibration mounts to be renewed |
| 271 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAh) Provisioning of Strainer casing along with strainer to Sea water pump suction line. 50mm pipe line. | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAh) Provisioning of Strainer casing along with strainer to Sea water pump suction line. 50mm pipe line. |
| 272 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAj) Tappet cover gaskets to be renewed | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAj) Tappet cover gaskets to be renewed |
| 273 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAk) Overhauling of Fresh water pump to be carried out. | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAk) Overhauling of Fresh water pump to be carried out. |
| 274 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAm) Cleanig and Pressure testing of Heat Exchangers to carried out | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAm) Cleanig and Pressure testing of Heat Exchangers to carried out |
| 275 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAn) Heat Exchanger zinc plugs to be renewed | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAn) Heat Exchanger zinc plugs to be renewed |
| 276 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAp) DA System to be fushed and charged with Fresh Oil (15W40, firm to supply) | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAp) DA System to be fushed and charged with Fresh Oil (15W40, firm to supply) |
| 277 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAq) Lub oil filter cartridges to be renewed. | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAq) Lub oil filter cartridges to be renewed. |
| 278 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAr) Turbo charger air filter to be renewed | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAr) Turbo charger air filter to be renewed |
| 279 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAs) Renewal of V Belts to be carried out | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAs) Renewal of V Belts to be carried out |
| 280 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAt) Renewal of Fuel oil filters to be carried out | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAt) Renewal of Fuel oil filters to be carried out |
| 281 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAu) Engine Coolant to be drained coolant circuit to be cleaned and system to be flushed thriugh. Fresh coolant to be charged into system (Coolant to be supplied by the firm) | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAu) Engine Coolant to be drained coolant circuit to be cleaned and system to be flushed thriugh. Fresh coolant to be charged into system (Coolant to be supplied by the firm) |
| 282 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAv) Replacement of all fuel hoses to be carried out | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAv) Replacement of all fuel hoses to be carried out |
| 283 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAw) Thermostat valve to be renewed | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAw) Thermostat valve to be renewed |
| 284 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAx) Replacement of drain plug copper washers to be carried out | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAx) Replacement of drain plug copper washers to be carried out |
| 285 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAy) Replacement of Rubber hoses of charge air cooler inlet and out lets pipes to be carried out | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TAy) Replacement of Rubber hoses of charge air cooler inlet and out lets pipes to be carried out |
| 286 | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TA, 100 KVA (z) 10K routines for DG to be carried out. Firm to quote for services and material required for underatking routines. Firm to obtain quote from OEM/Authorised Dealership for spares and services. Required Spares/Material to be provided by Firm for underatking Each DL serials | 1002EQPT:DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 6R1080TA, 100 KVA (z) 10K routines for DG to be carried out. Firm to quote for services and material required for underatking routines. Firm to obtain quote from OEM/Authorised Dealership for spares and services. Required Spares/Material to be provided by Firm for underatking Each DL serials |
| 287 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSION, MODEL:VSP 21R5/150-2 The routines includes supplying of required materials/spares and services. The firm to obtain quote from OEM/Authorised Dealership for spares and services and quote for each serial under services and material/spares columns. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSION, MODEL:VSP 21R5/150-2 The routines includes supplying of required materials/spares and services. The firm to obtain quote from OEM/Authorised Dealership for spares and services and quote for each serial under services and material/spares columns. |
| 288 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSION, MODEL:VSP 21R5/150-2a) System Health Checks to be carried out on both Voith Turbo system. VSP System to be proved for satisfactory performance post complition of routines. Firm to quote for Services,spares, consumables required to undertake routines on Voith propulsion system. Routines should involves follwoing inspection and checks :- i) Visual assessment of Both VSP System ii) Checks propeller in standstill condition iii) Oil level of VSP systemiv) Oil condition v) Condition of system pipe lines. Repair of defective connection and jointsvi) Filter checks and cleaning of filters. vii) Checks of shaft line viii) Inspection of Turbo coupling ix) Inspection of Shafting bearings x) Inspection of Tooth bow coupling xi) Inspection of of main gear & flange gearxii) Measuring of clearances Checks with vessel in dry dock xiii) Inspection of all Anodes. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSION, MODEL:VSP 21R5/150-2a) System Health Checks to be carried out on both Voith Turbo system. VSP System to be proved for satisfactory performance post complition of routines. Firm to quote for Services,spares, consumables required to undertake routines on Voith propulsion system. Routines should involves follwoing inspection and checks :- i) Visual assessment of Both VSP System ii) Checks propeller in standstill condition iii) Oil level of VSP systemiv) Oil condition v) Condition of system pipe lines. Repair of defective connection and jointsvi) Filter checks and cleaning of filters. vii) Checks of shaft line viii) Inspection of Turbo coupling ix) Inspection of Shafting bearings x) Inspection of Tooth bow coupling xi) Inspection of of main gear & flange gearxii) Measuring of clearances Checks with vessel in dry dock xiii) Inspection of all Anodes. |
| 289 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONb) Oil removal & fushing out from VSP system and top up with ISO VG 150 oil. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONb) Oil removal & fushing out from VSP system and top up with ISO VG 150 oil. |
| 290 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONc) Removal & flushing out of Gear coupling oil to be carried out and both system to be charged with ISO VG 460. Oil to be provided by firm. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONc) Removal & flushing out of Gear coupling oil to be carried out and both system to be charged with ISO VG 460. Oil to be provided by firm. |
| 291 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONd) Pedestal bearing oil to be drained & system to be flushed out. Post flushing/cleaning oil to be topped up with ISO VG 100 Oil to be provided by firm. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONd) Pedestal bearing oil to be drained & system to be flushed out. Post flushing/cleaning oil to be topped up with ISO VG 100 Oil to be provided by firm. |
| 292 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONe) Check and Record axial and torsional readings and zero position of blades. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONe) Check and Record axial and torsional readings and zero position of blades. |
| 293 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONf) Seal leak test to be carried out. Necessary/Suitable repair of mating surfaces to be undertaken and defect to be rectified. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONf) Seal leak test to be carried out. Necessary/Suitable repair of mating surfaces to be undertaken and defect to be rectified. |
| 294 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONg) All lub oil filters to be replaced with new filters.(Filter to be supplied by firm) | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONg) All lub oil filters to be replaced with new filters.(Filter to be supplied by firm) |
| 295 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONh) Sacrificial anodes to be replaced with new anodes. Firm to supply new anodes. | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONh) Sacrificial anodes to be replaced with new anodes. Firm to supply new anodes. |
| 296 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSION j) Condition of the propeller blades to be checked.Cleaning of blades to be carried out. Post cleaning Dye penetration test of blades to be undertaken. Clearances of blades to be measured. Condition of Blade seals to be inspected.Constraint test of blade seals to be carried out | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSION j) Condition of the propeller blades to be checked.Cleaning of blades to be carried out. Post cleaning Dye penetration test of blades to be undertaken. Clearances of blades to be measured. Condition of Blade seals to be inspected.Constraint test of blade seals to be carried out |
| 297 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONk) VSP System Turbo coupling oil to be drained. System to be flushed with fresh oil & Renewal of System oil to be undertaken. Turbo coupling oil to be renewed. ISO VG 32 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONk) VSP System Turbo coupling oil to be drained. System to be flushed with fresh oil & Renewal of System oil to be undertaken. Turbo coupling oil to be renewed. ISO VG 32 |
| 298 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONm) Health checks in floating and running condition to be carried out Adjustment of linkages from bridges to voith system to be undertaken | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONm) Health checks in floating and running condition to be carried out Adjustment of linkages from bridges to voith system to be undertaken |
| 299 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONn) Chemical cleaning and pressure testing of Voith Lub oil coolers to be carried out | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONn) Chemical cleaning and pressure testing of Voith Lub oil coolers to be carried out |
| 300 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONp) Cleaning of Voith overhead tanks and renewal of gaskets, sight glasses and spring loaded valves to be carried out | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONp) Cleaning of Voith overhead tanks and renewal of gaskets, sight glasses and spring loaded valves to be carried out |
| 301 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONq) Overhauling of Hand pumps to be carried out | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONq) Overhauling of Hand pumps to be carried out |
| 302 | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONr) Inspection, cleaning and paint to be applied at following areas:i. Bottom of rotor casingii. Rotor Casingiii. Well areaiv. Propeller casingv. Driving sleeve | 1003EQPT :VOITH PROPULSION ,MAKE:VOITH TURBO SCHNEIDER PROPULSIONr) Inspection, cleaning and paint to be applied at following areas:i. Bottom of rotor casingii. Rotor Casingiii. Well areaiv. Propeller casingv. Driving sleeve |
| 303 | 1004EQPT:FIRE/BILGE PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6, CAP: 30 CMH | 1004EQPT:FIRE/BILGE PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6, CAP: 30 CMH |
| 304 | 1004EQPT:FIRE/BILGE PUMPMAKE : BE PUMPS,a) Carry out overhauling of Pumps. Dismantle pump completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be carried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material | 1004EQPT:FIRE/BILGE PUMPMAKE : BE PUMPS,a) Carry out overhauling of Pumps. Dismantle pump completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be carried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material |
| 305 | 1004EQPT:FIRE/BILGE PUMPb) Firm to supply and renew Suction and discharge pressure gauges (Glecerin filled) range -30 to 30 psi and 0 to120 psi . | 1004EQPT:FIRE/BILGE PUMPb) Firm to supply and renew Suction and discharge pressure gauges (Glecerin filled) range -30 to 30 psi and 0 to120 psi . |
| 306 | 1004EQPT:FIRE/BILGE PUMP c) Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. | 1004EQPT:FIRE/BILGE PUMP c) Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. |
| 307 | 1004EQPT:FIRE/BILGE PUMPd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. | 1004EQPT:FIRE/BILGE PUMPd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. |
| 308 | 1004EQPT:FIRE/BILGE PUMPe) Coupling Guards to be repaired & suitable primer & paint to be applied. | 1004EQPT:FIRE/BILGE PUMPe) Coupling Guards to be repaired & suitable primer & paint to be applied. |
| 309 | 1004EQPT:FIRE/BILGE PUMPf) Carry out alignment of pump with motor and prove for satisfactory performance with general Fire & bilge system. | 1004EQPT:FIRE/BILGE PUMPf) Carry out alignment of pump with motor and prove for satisfactory performance with general Fire & bilge system. |
| 310 | 1005EQPT: GS PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6, CAP: 35CMH | 1005EQPT: GS PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6, CAP: 35CMH |
| 311 | 1005EQPT: GS PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6, CAP: 35CMHa) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be varried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material) | 1005EQPT: GS PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6, CAP: 35CMHa) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be varried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material) |
| 312 | 1005EQPT: GS PUMPMAKE : BE PUMPSb) Firm to supply and renew Suction and discharge pressure gauges (Glecerin filled) range -30 to 30 psi and 0 to120 psi . | 1005EQPT: GS PUMPMAKE : BE PUMPSb) Firm to supply and renew Suction and discharge pressure gauges (Glecerin filled) range -30 to 30 psi and 0 to120 psi . |
| 313 | 1005EQPT: GS PUMPMAKE : BE PUMPSc) Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. | 1005EQPT: GS PUMPMAKE : BE PUMPSc) Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. |
| 314 | 1005EQPT: GS PUMPMAKE : BE PUMPSd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. | 1005EQPT: GS PUMPMAKE : BE PUMPSd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. |
| 315 | 1005EQPT: GS PUMPMAKE : BE PUMPSe) Coupling Guards to be fabricated & suitable primer & paint to be applied. | 1005EQPT: GS PUMPMAKE : BE PUMPSe) Coupling Guards to be fabricated & suitable primer & paint to be applied. |
| 316 | 1005EQPT: GS PUMPMAKE : BE PUMPSf) Foundation to be repaired. Fabrication of new channels to be done ( Thickness 6mm, length 3mtrs). Suitable Primer and paint to be applied. | 1005EQPT: GS PUMPMAKE : BE PUMPSf) Foundation to be repaired. Fabrication of new channels to be done ( Thickness 6mm, length 3mtrs). Suitable Primer and paint to be applied. |
| 317 | 1005EQPT: GS PUMPMAKE : BE PUMPSg) Carry out alignment of pump with motor and prove for satisfactory performance | 1005EQPT: GS PUMPMAKE : BE PUMPSg) Carry out alignment of pump with motor and prove for satisfactory performance |
| 318 | 1005EQPT: GS PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6h) Firm to supply and renew pump | 1005EQPT: GS PUMPMAKE : BE PUMPS,TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN, MODEL- MA843KKS-6h) Firm to supply and renew pump |
| 319 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST & CROMPTON PUMPS, TYPE-CETRIFUGAL MOTOR DRIVEN,MODEL-CNW 100-200 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST & CROMPTON PUMPS, TYPE-CETRIFUGAL MOTOR DRIVEN,MODEL-CNW 100-200 |
| 320 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS, TYPE-CETRIFUGAL MOTOR DRIVEN,MODEL-CNW 100-200a) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be varried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material) | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS, TYPE-CETRIFUGAL MOTOR DRIVEN,MODEL-CNW 100-200a) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be varried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material) |
| 321 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,b) Firm to supply and renewSuction and discharge pressure gauges (Glecerin filled) range -30 to 30 psi and 0 to120 psi . | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,b) Firm to supply and renewSuction and discharge pressure gauges (Glecerin filled) range -30 to 30 psi and 0 to120 psi . |
| 322 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,c)Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,c)Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. |
| 323 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,d) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,d) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. |
| 324 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,e) Coupling Guards to be fabricated & suitable primer & paint to be applied. | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,e) Coupling Guards to be fabricated & suitable primer & paint to be applied. |
| 325 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,f) Carry out alignment of pump with motor and prove for satisfactory performance | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,f) Carry out alignment of pump with motor and prove for satisfactory performance |
| 326 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,g) Firm to supply and renew impeller | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,g) Firm to supply and renew impeller |
| 327 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,h) Firm to supply and renew pump shaft | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST&CROMPTON PUMPS,h) Firm to supply and renew pump shaft |
| 328 | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST & CROMPTON PUMPS, TYPE-CETRIFUGAL MOTOR DRIVEN,MODEL-CNW 100-200j) Replacement of pump to be carried out.Shipyard to procure and replace the existing pump along with coupling, mounts. The work to include procurment, fitment and performace trials of the new pump | 1006EQPT: VOITH COOLING WATER PUMPS MAKE: BEST & CROMPTON PUMPS, TYPE-CETRIFUGAL MOTOR DRIVEN,MODEL-CNW 100-200j) Replacement of pump to be carried out.Shipyard to procure and replace the existing pump along with coupling, mounts. The work to include procurment, fitment and performace trials of the new pump |
| 329 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPS, TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN,MODEL- A01210K-1B-304, Cap: 1 CMH | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPS, TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN,MODEL- A01210K-1B-304, Cap: 1 CMH |
| 330 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPS, TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN,MODEL- A01210K-1B-304, Cap: 1 CMHa) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be carried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPS, TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN,MODEL- A01210K-1B-304, Cap: 1 CMHa) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be carried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done. (The cost of spares/material required for the overhauling & reconditioning to be included in cost of spares/material |
| 331 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSb) Firm to supply and renewSuction and discharge pressure gauges(Glecerin filled) range -30 to 30 psi and 0 to120 psi . | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSb) Firm to supply and renewSuction and discharge pressure gauges(Glecerin filled) range -30 to 30 psi and 0 to120 psi . |
| 332 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSc) Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSc) Firm to supply and renew Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. |
| 333 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. |
| 334 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSe) Coupling Guards to be fabricated & suitable primer & paint to be applied. | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSe) Coupling Guards to be fabricated & suitable primer & paint to be applied. |
| 335 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSf) Carry out alignment of pump with motor and prove for satisfactory performance . | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSf) Carry out alignment of pump with motor and prove for satisfactory performance . |
| 336 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSg) Firm to supply and renew impeller | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPSg) Firm to supply and renew impeller |
| 337 | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPS, TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN,MODEL- A01210K-1B-304, Cap: 1 CMHh) Firm to supply and renew pump | 1007EQPT: DOMESTIC FRESH WATER PUMPS MAKE: BE PUMPS, TYPE-CETRIFUGAL SELF PRIMING MOTOR DRIVEN,MODEL- A01210K-1B-304, Cap: 1 CMHh) Firm to supply and renew pump |
| 338 | 1008EQPT: SALVAGE PUMP MAKE: BEST & CROMPTON, MODEL- BWL 1525,TYPE: CENTIFUGAL, SELF PRIMING ENGINE DRIVEN,Cap: 200 CMH | 1008EQPT: SALVAGE PUMP MAKE: BEST & CROMPTON, MODEL- BWL 1525,TYPE: CENTIFUGAL, SELF PRIMING ENGINE DRIVEN,Cap: 200 CMH |
| 339 | 1008EQPT: SALVAGE PUMP MAKE: BEST & CROMPTON, MODEL- BWL 1525,TYPE: CENTIFUGAL, SELF PRIMING ENGINE DRIVEN,Cap: 200 CMHa) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be carried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done (The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1008EQPT: SALVAGE PUMP MAKE: BEST & CROMPTON, MODEL- BWL 1525,TYPE: CENTIFUGAL, SELF PRIMING ENGINE DRIVEN,Cap: 200 CMHa) Carry out overhauling of Pumps. Dismantle pumps completely. Examine all parts for any damage/wear . Replacement of mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys, O-rings and gaskets to be carried out. Reconditioning of damaged parts including Shaft & impleller, pump housing to be done (The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 340 | 1008EQPT: SALVAGE PUMP b)Suction and discharge pressure gauges to be replaced with new guages (Glecerin filled) range -30 to 30 psi and 0 to120 psi . | 1008EQPT: SALVAGE PUMP b)Suction and discharge pressure gauges to be replaced with new guages (Glecerin filled) range -30 to 30 psi and 0 to120 psi . |
| 341 | 1008EQPT: SALVAGE PUMP c)Replacement of Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. | 1008EQPT: SALVAGE PUMP c)Replacement of Instrumentation gauge pipes with suitable end fittings . mat: CuNi dia:1/4”. |
| 342 | 1008EQPT: SALVAGE PUMP d) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. | 1008EQPT: SALVAGE PUMP d) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. |
| 343 | 1008EQPT: SALVAGE PUMP e) Coupling Guards to be fabricated & suitable primer & paint to be applied. | 1008EQPT: SALVAGE PUMP e) Coupling Guards to be fabricated & suitable primer & paint to be applied. |
| 344 | 1008EQPT: SALVAGE PUMP f) Carry out alignment of pump & prove for satisfactory performance | 1008EQPT: SALVAGE PUMP f) Carry out alignment of pump & prove for satisfactory performance |
| 345 | 1008EQPT: SALVAGE PUMP g) Firm to supply and renew impeller | 1008EQPT: SALVAGE PUMP g) Firm to supply and renew impeller |
| 346 | 1008h)Carry out overhauling of Liquid ring priming pump. Pump to be prove for satisfactory performance. Double row deep groove ball bearings, mechanical seal,gaskets to be replaced with new, 1/4'' BSP non return valves, and 1/4'' copper tubes to be replaced. | 1008h)Carry out overhauling of Liquid ring priming pump. Pump to be prove for satisfactory performance. Double row deep groove ball bearings, mechanical seal,gaskets to be replaced with new, 1/4'' BSP non return valves, and 1/4'' copper tubes to be replaced. |
| 347 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1,TYPE: 3 CYCLES,INLINE DIESEL ENGINE, POWER: 42 HPQTY : 1 no.(The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1,TYPE: 3 CYCLES,INLINE DIESEL ENGINE, POWER: 42 HPQTY : 1 no.(The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 348 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 a) Engine lub oil to be drained,sump to be cleaned & fresh lub oil to be charged in sump. Lub oil 15W40, Qty-100 Ltrs (Lub Oil to be provided by Firm) | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 a) Engine lub oil to be drained,sump to be cleaned & fresh lub oil to be charged in sump. Lub oil 15W40, Qty-100 Ltrs (Lub Oil to be provided by Firm) |
| 349 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1, b) Replacement of air filter to be carried out . (Filters to be provided by Firm | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1, b) Replacement of air filter to be carried out . (Filters to be provided by Firm |
| 350 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 d) Firm to supply and renew coolant inhibitor with zinc plugs | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 d) Firm to supply and renew coolant inhibitor with zinc plugs |
| 351 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 e) Replacement of Engine Oil filters, & fuel oil filters to be carried out. (Filters to be provided by Firm) | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 e) Replacement of Engine Oil filters, & fuel oil filters to be carried out. (Filters to be provided by Firm) |
| 352 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 f) Valve clearance to be checked and adjusted | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 f) Valve clearance to be checked and adjusted |
| 353 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 g) Tightening of all external fasteners to be checked & Tightned if necessary. | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 g) Tightening of all external fasteners to be checked & Tightned if necessary. |
| 354 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 h) Overhauling of the Injectors to be carried out | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 h) Overhauling of the Injectors to be carried out |
| 355 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 j) Firm to supply and renew Injectors | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 j) Firm to supply and renew Injectors |
| 356 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 k) Engine cooling water with additives to be replaced. Qty-100 Ltrs, Coolant to be provided by Firm) | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 k) Engine cooling water with additives to be replaced. Qty-100 Ltrs, Coolant to be provided by Firm) |
| 357 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 l) Firm to supply and renew belts to be carried out. | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 l) Firm to supply and renew belts to be carried out. |
| 358 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 m) Engine starting motor to be overhauled and prove for satidfactory operation. | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 m) Engine starting motor to be overhauled and prove for satidfactory operation. |
| 359 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 n) Cooling Fresh water Pump to be overhauled and prove for satidfactory operation. | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 n) Cooling Fresh water Pump to be overhauled and prove for satidfactory operation. |
| 360 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (p) Firm to supply and renew all rubber hoses & rubber clips. (Qty-06) | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (p) Firm to supply and renew all rubber hoses & rubber clips. (Qty-06) |
| 361 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (q) Remove & chemical cleaning of lub oil cooler to be carried out.Replacement of gasket,seals/ 'o' rings t be undertaken. Cooler to be pressure tested & prove for satisfactory Performance. | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (q) Remove & chemical cleaning of lub oil cooler to be carried out.Replacement of gasket,seals/ 'o' rings t be undertaken. Cooler to be pressure tested & prove for satisfactory Performance. |
| 362 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (s) Fuel shut off solenoid valve to be overhauled. | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (s) Fuel shut off solenoid valve to be overhauled. |
| 363 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (t) Coolant replinish tank to be repaired/fabricated | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (t) Coolant replinish tank to be repaired/fabricated |
| 364 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (u) Post completion of routine, engine to be proved for satisfactory perfomance | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 (u) Post completion of routine, engine to be proved for satisfactory perfomance |
| 365 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 Following gauges of DG control panel to be renewed (v) Firm to supply and renew Lub oil pressure gauge.(Range - 0 to 4 kg/cm2) | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 Following gauges of DG control panel to be renewed (v) Firm to supply and renew Lub oil pressure gauge.(Range - 0 to 4 kg/cm2) |
| 366 | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 Following gauges of DG control panel to be renewed (w) Firm to supply and renew Fresh water pressure gauge.(Range - 0 to 4 kg/cm2) | 1008(a)EQPT: SALVAGE PUMP ENGINEMAKE: M/S GREAVES COTTON, MODEL- 3G11NAG1 Following gauges of DG control panel to be renewed (w) Firm to supply and renew Fresh water pressure gauge.(Range - 0 to 4 kg/cm2) |
| 367 | 1009EQPT : FUEL OIL TRANSFER PUMP, MAKE : RAYSONS, MODEL-RGP 2 MT ,TYPE: ROTARY GEAR PUMP, CAP: 02 CMH | 1009EQPT : FUEL OIL TRANSFER PUMP, MAKE : RAYSONS, MODEL-RGP 2 MT ,TYPE: ROTARY GEAR PUMP, CAP: 02 CMH |
| 368 | 1009EQPT : FUEL OIL TRANSFER PUMP, MAKE : RAYSONS, MODEL-RGP 2 MT ,TYPE: ROTARY GEAR PUMP, CAP: 02 CMHa) Carry out overhauling of Pump and Dismantle pump completely. Examine all parts for wear. mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys and gaskets. (The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1009EQPT : FUEL OIL TRANSFER PUMP, MAKE : RAYSONS, MODEL-RGP 2 MT ,TYPE: ROTARY GEAR PUMP, CAP: 02 CMHa) Carry out overhauling of Pump and Dismantle pump completely. Examine all parts for wear. mechanical seal, bearings, bearing brackets, bearing bushes, shaft sleeve, keys and gaskets. (The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 369 | 1009EQPT : FUEL OIL TRANSFER PUMPb) Firm to supply and renew Suction and discharge pressure gauges(Glecerin filled) . Range -30 to 30 psi and 0 to120 psi . | 1009EQPT : FUEL OIL TRANSFER PUMPb) Firm to supply and renew Suction and discharge pressure gauges(Glecerin filled) . Range -30 to 30 psi and 0 to120 psi . |
| 370 | 1009EQPT : FUEL OIL TRANSFER PUMPc) Overhauling of Relief valve to be carried out & reset relief valve after overhaul .(set pr.-5Kg/cm2) | 1009EQPT : FUEL OIL TRANSFER PUMPc) Overhauling of Relief valve to be carried out & reset relief valve after overhaul .(set pr.-5Kg/cm2) |
| 371 | 1009EQPT : FUEL OIL TRANSFER PUMPd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. | 1009EQPT : FUEL OIL TRANSFER PUMPd) Coupling assembly between pump & motor to be renewed. Pump coupling consist of two metal hubs and hard rubber/neoprene insert. |
| 372 | 1009EQPT : FUEL OIL TRANSFER PUMPe) Firm to supply and renew Instrumentation gauges pipes with suitable end fittings. mat: CuNi dia:1/4” | 1009EQPT : FUEL OIL TRANSFER PUMPe) Firm to supply and renew Instrumentation gauges pipes with suitable end fittings. mat: CuNi dia:1/4” |
| 373 | 1009EQPT : FUEL OIL TRANSFER PUMPf)Carry out alignment of pump with motor and Pump to be proved for satisfactory performance post work completion. | 1009EQPT : FUEL OIL TRANSFER PUMPf)Carry out alignment of pump with motor and Pump to be proved for satisfactory performance post work completion. |
| 374 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM |
| 375 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM (a) Carry out overhauling of Pump and renew following parts :-Dismantle pump completely. Examine all parts for wear.Shaft and impeller to be cleaned and polished, Renew wear ring,bushes, mechanical seals, bearings,sealing rings, keys ,gland packing and gaskets. (The cost of spares/material required for the overhauling to be included in cost of spares/material). PUMP MAKE : JASON ENGINEERING AS,MODEL: 250 X 350 OGF, POWER CONSUMPTION: 772 KW, CAP: 1500 CMH. | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM (a) Carry out overhauling of Pump and renew following parts :-Dismantle pump completely. Examine all parts for wear.Shaft and impeller to be cleaned and polished, Renew wear ring,bushes, mechanical seals, bearings,sealing rings, keys ,gland packing and gaskets. (The cost of spares/material required for the overhauling to be included in cost of spares/material). PUMP MAKE : JASON ENGINEERING AS,MODEL: 250 X 350 OGF, POWER CONSUMPTION: 772 KW, CAP: 1500 CMH. |
| 376 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM b) Carry out alignment of pump with gear box and Pump to be proved for satisfactory performance post work completion.. | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM b) Carry out alignment of pump with gear box and Pump to be proved for satisfactory performance post work completion.. |
| 377 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM (c) Carry out overhauling of fire fighting pump suction line flap valves . Valves to be prove for satisfactory operation. FI-FI PUMP SUCTION LINE VALVES, 300 Dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM (c) Carry out overhauling of fire fighting pump suction line flap valves . Valves to be prove for satisfactory operation. FI-FI PUMP SUCTION LINE VALVES, 300 Dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. |
| 378 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM (d) Firm to supply new valves and same to be fitted in FiFi system pump suction line. Valves to be prove for satisfactory operation. FI-FI PUMP SUCTION LINE VALVES, 300 Dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM (d) Firm to supply new valves and same to be fitted in FiFi system pump suction line. Valves to be prove for satisfactory operation. FI-FI PUMP SUCTION LINE VALVES, 300 Dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. |
| 379 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM FI-FI PUMP SUCTION LINE VALVES,300 Dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. e) Firm to supply and renew solenoid valve. 1/4-5/2 24V DC Solenoid valve , Make: JANATICS Solenoid valves 5/2 way with 2 coils, . | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM FI-FI PUMP SUCTION LINE VALVES,300 Dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. e) Firm to supply and renew solenoid valve. 1/4-5/2 24V DC Solenoid valve , Make: JANATICS Solenoid valves 5/2 way with 2 coils, . |
| 380 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM EQPT : FI-FI PUMP SUCTION LINE VALVES,f) Suction Valves to be overhauled and same to be pressure tested, up to 1.5 times of working pressure. Valves to be proved for opening and closing through manual and auto mode operations from control pannel. | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM EQPT : FI-FI PUMP SUCTION LINE VALVES,f) Suction Valves to be overhauled and same to be pressure tested, up to 1.5 times of working pressure. Valves to be proved for opening and closing through manual and auto mode operations from control pannel. |
| 381 | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM EQPT : FI-FI PUMP DISCHARGE LINE VALVES,250 dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. g) Carry out overhauling of discharge line valves. Job includes renewal of following parts : Solenoid valves 5/2 way with 2 coils, gaskets, and hand wheel lock pins. Firm to provision required materials.(The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1010EQPT : EXTERNAL FIRE FIGHTING SYSTEM EQPT : FI-FI PUMP DISCHARGE LINE VALVES,250 dia, TYPE: BVKX Water butter fly valve, MODEL : Gibson BVK1-BVKA WAFER. g) Carry out overhauling of discharge line valves. Job includes renewal of following parts : Solenoid valves 5/2 way with 2 coils, gaskets, and hand wheel lock pins. Firm to provision required materials.(The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 382 | 1010EQPT : FI-FI PUMP DISCHARGE LINE VALVESh) valves to be pressure tested, up to 1.5 times of working pressure and proved opening and closing through manual and auto mode operations with control pannel. | 1010EQPT : FI-FI PUMP DISCHARGE LINE VALVESh) valves to be pressure tested, up to 1.5 times of working pressure and proved opening and closing through manual and auto mode operations with control pannel. |
| 383 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11a) Gear Box overhauling to be carried out. Job includes dismantling of gear box components, cleaning and inspection of all internal parts. Firm to supply Following parts and replacement to be carry out for Gear Box Drive Shaft Components (i) Radial Seal Ring (Qty-01 No) replace with new. (ii) Spherical Roller bearings (Qty-02 Nos) to be replace with new (iii) Ball Bearings (Qty-02 Nos) to be replace with new (iv) Shaft Keys (Qty-02 Nos) replace with new(v) Hydraulic Clutch (Qty-01 Nos) to be replace with new (vi) Retaining Ring (Qty-01 No) replace with new. (vii) Ritzel (Qty-01 Nos) to be replace with new (viii) Oil Supply Swivel (Qty-01 Nos) to be replace with new (ix) Shaft Sleeve (Qty-01 Nos) replace with new(x) Hydraulic Clutch (Qty-01 Nos) to be replace with new | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11a) Gear Box overhauling to be carried out. Job includes dismantling of gear box components, cleaning and inspection of all internal parts. Firm to supply Following parts and replacement to be carry out for Gear Box Drive Shaft Components (i) Radial Seal Ring (Qty-01 No) replace with new. (ii) Spherical Roller bearings (Qty-02 Nos) to be replace with new (iii) Ball Bearings (Qty-02 Nos) to be replace with new (iv) Shaft Keys (Qty-02 Nos) replace with new(v) Hydraulic Clutch (Qty-01 Nos) to be replace with new (vi) Retaining Ring (Qty-01 No) replace with new. (vii) Ritzel (Qty-01 Nos) to be replace with new (viii) Oil Supply Swivel (Qty-01 Nos) to be replace with new (ix) Shaft Sleeve (Qty-01 Nos) replace with new(x) Hydraulic Clutch (Qty-01 Nos) to be replace with new |
| 384 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11b) Firm to supply Following parts and replacement to be carry out for Gear Box to pump drive shaft Components (i) Taper Roller Bearing (Qty-02 No) replace with new. (ii) Ball bearing Disc Spring (Qty-03 Nos) to be replace with new (iii) Radial Shaft Seal (Qty-01 Nos) to be replace with new | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11b) Firm to supply Following parts and replacement to be carry out for Gear Box to pump drive shaft Components (i) Taper Roller Bearing (Qty-02 No) replace with new. (ii) Ball bearing Disc Spring (Qty-03 Nos) to be replace with new (iii) Radial Shaft Seal (Qty-01 Nos) to be replace with new |
| 385 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11c) Firm to supply Following parts and replacement to be carry out for Gear Box to Lub Oil Pump Drive Components (i) Taper Roller Bearing (Qty-02 No) replace with new. (ii) Ritzel for SMP (Qty-01 Nos) to be replace with new (iii) Distance Sleeve (Qty-01 Nos) to be replace with new | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11c) Firm to supply Following parts and replacement to be carry out for Gear Box to Lub Oil Pump Drive Components (i) Taper Roller Bearing (Qty-02 No) replace with new. (ii) Ritzel for SMP (Qty-01 Nos) to be replace with new (iii) Distance Sleeve (Qty-01 Nos) to be replace with new |
| 386 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11d) Firm to supply Following parts and replacement to be carry out for Gear Box (i) Pressure hoses for Lub oil Pump to manifold (Qty-02 No) replace with new. (ii) Lub oil Line Suction Hoses (Qty-02 Nos) to be replace with new | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11d) Firm to supply Following parts and replacement to be carry out for Gear Box (i) Pressure hoses for Lub oil Pump to manifold (Qty-02 No) replace with new. (ii) Lub oil Line Suction Hoses (Qty-02 Nos) to be replace with new |
| 387 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11e) Firm to supply and renew Oil Filters and Oil pump . Prove for satisfactory performance | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11e) Firm to supply and renew Oil Filters and Oil pump . Prove for satisfactory performance |
| 388 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11f) Overhauling of Fire Fighting System heat exchanger (Shell & Tube type) to be carried out. Job includes isolation of system pipe lines and related accessories before degutting. HE's to be removed from position, taken to firm's workshop, cleaning and pressure testing to be carried out.Leakage to arrested and necessary repair of shell and tube heat exchanger to be carried out. Renew gaskets and O-rings. Zinc anodes with brass plugs for cooling system to be renewed. Heat Exchanger to be fitted back and prove for optimum performance. FiFi System Oil Cooler Make & Model:- BOWMAN (E.J. BOWMAN) CC Cooler/ EC 16 AL-4097 5 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11f) Overhauling of Fire Fighting System heat exchanger (Shell & Tube type) to be carried out. Job includes isolation of system pipe lines and related accessories before degutting. HE's to be removed from position, taken to firm's workshop, cleaning and pressure testing to be carried out.Leakage to arrested and necessary repair of shell and tube heat exchanger to be carried out. Renew gaskets and O-rings. Zinc anodes with brass plugs for cooling system to be renewed. Heat Exchanger to be fitted back and prove for optimum performance. FiFi System Oil Cooler Make & Model:- BOWMAN (E.J. BOWMAN) CC Cooler/ EC 16 AL-4097 5 |
| 389 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11f1) Oil Cooler to be replaced with new. Firm to supply new cooler. Heat Exchanger to be fitted in position and prove for optimum performance. FiFi System Oil Cooler Make & Model:- BOWMAN (E.J. BOWMAN) CC Cooler/ EC 16 AL-4097 5 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11f1) Oil Cooler to be replaced with new. Firm to supply new cooler. Heat Exchanger to be fitted in position and prove for optimum performance. FiFi System Oil Cooler Make & Model:- BOWMAN (E.J. BOWMAN) CC Cooler/ EC 16 AL-4097 5 |
| 390 | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11g)Servicing of hydraulic system manifold and renew suitable orifaces placed in out put manifold lines. | 1010(a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPS : EUREKA PUMPS 250X350 DGF, MODEL DF A6468-000, 182.02, 45TMB1480958 REDUCTION GEAR BOX: MAKE - JASON ENGG, MODEL - 255VK-1.12-CCW-02, SL NO-1881-56-11g)Servicing of hydraulic system manifold and renew suitable orifaces placed in out put manifold lines. |
| 391 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSh) Firm to supply and renew 24v dc 2 way solenoid valve. | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSh) Firm to supply and renew 24v dc 2 way solenoid valve. |
| 392 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSj) Firm to supply and renew external hydraulic pipe lines Size 1/4'' Mat: SS with suitable end fittings. | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSj) Firm to supply and renew external hydraulic pipe lines Size 1/4'' Mat: SS with suitable end fittings. |
| 393 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSk) Renew lub oil, clutch in and temperature gauges Range: 0-10 bar, 0-50 bar, 0-100 Degree C | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSk) Renew lub oil, clutch in and temperature gauges Range: 0-10 bar, 0-50 bar, 0-100 Degree C |
| 394 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSm) Flexible coupling between FiFi pump and main engine to be renewed. Suitable new flexible coupling to be supplied by firm. Ref.: VULSTIK-L VULKAN (2X3412) 0018 RUBBER COUPLING | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSm) Flexible coupling between FiFi pump and main engine to be renewed. Suitable new flexible coupling to be supplied by firm. Ref.: VULSTIK-L VULKAN (2X3412) 0018 RUBBER COUPLING |
| 395 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSn) Renew gear box oil with fresh oil. (Oil Grade Servo System 68, Oil to be supplied by Firm) | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSn) Renew gear box oil with fresh oil. (Oil Grade Servo System 68, Oil to be supplied by Firm) |
| 396 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSp) Carry out alignment of Transmission gear box with engine. | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSp) Carry out alignment of Transmission gear box with engine. |
| 397 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSq)Adjust prsssure relief valve & pressure restrictor valves and Transmission gear box to be proved for satisfactory perfomance post work completion. | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSq)Adjust prsssure relief valve & pressure restrictor valves and Transmission gear box to be proved for satisfactory perfomance post work completion. |
| 398 | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSr) Firm to supply High pressure filter Patt no. HP0372A10AN. | 1010 (a)EQPT : FIFI PUMP POWER TAKE OFF ASSEMBLY PUMPSr) Firm to supply High pressure filter Patt no. HP0372A10AN. |
| 399 | 1010(b)FIRE MONITORS SERIES FM200HJF-V , AND HYDRAULIC MONITOR CONTROL . Qty:-2nos.a) Fire monitors and hydraulic monitor control to be overhauled, and renew following parts :Solenoid valves, high pressure hoses,limit switches, O-rings, adapters, and gaskets.(The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1010(b)FIRE MONITORS SERIES FM200HJF-V , AND HYDRAULIC MONITOR CONTROL . Qty:-2nos.a) Fire monitors and hydraulic monitor control to be overhauled, and renew following parts :Solenoid valves, high pressure hoses,limit switches, O-rings, adapters, and gaskets.(The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 400 | 1010(b)FIRE MONITORS SERIES FM200HJF-Vb) Drain hydraullic oil from power pack oil holding tank, Tank to be cleaned,flushed and renew with fresh hydr oil. ISO VG 32. ( supplied by Firm), Qty-210Ltrs | 1010(b)FIRE MONITORS SERIES FM200HJF-Vb) Drain hydraullic oil from power pack oil holding tank, Tank to be cleaned,flushed and renew with fresh hydr oil. ISO VG 32. ( supplied by Firm), Qty-210Ltrs |
| 401 | 1010(b)FIRE MONITORS SERIES FM200HJF-Vc) Carry out alignment of power pack assembly and fire monitors to be proved for satisfactory performance post work completion. | 1010(b)FIRE MONITORS SERIES FM200HJF-Vc) Carry out alignment of power pack assembly and fire monitors to be proved for satisfactory performance post work completion. |
| 402 | 1011EQPT: SEMI ROTOR HAND PUMPS, MAKE: M/S WESTINDIA TRADERS . | 1011EQPT: SEMI ROTOR HAND PUMPS, MAKE: M/S WESTINDIA TRADERS . |
| 403 | 1011EQPT: SEMI ROTOR HAND PUMPS, MAKE: M/S WESTINDIA TRADERS .a) Pumps to be overhauled and proved for satisfactory operation. (The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1011EQPT: SEMI ROTOR HAND PUMPS, MAKE: M/S WESTINDIA TRADERS .a) Pumps to be overhauled and proved for satisfactory operation. (The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 404 | 1011EQPT: SEMI ROTOR HAND PUMPSb) Dismantle and Clean pumps internally, renew wear down parts . (firm to supply the items) | 1011EQPT: SEMI ROTOR HAND PUMPSb) Dismantle and Clean pumps internally, renew wear down parts . (firm to supply the items) |
| 405 | 1011EQPT: SEMI ROTOR HAND PUMPSc) Firm to supply and renew Pump Handles | 1011EQPT: SEMI ROTOR HAND PUMPSc) Firm to supply and renew Pump Handles |
| 406 | 1012EQPT: DD COMPRESSOR ENGINEMAKE: HATZ DIESEL, MODEL- IB20-6. | 1012EQPT: DD COMPRESSOR ENGINEMAKE: HATZ DIESEL, MODEL- IB20-6. |
| 407 | 1012EQPT: DD COMPRESSOR ENGINEMAKE: HATZ DIESEL, MODEL- IB20-6. a) Overhauling of engine to be carried out. Injector to be renewed (The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1012EQPT: DD COMPRESSOR ENGINEMAKE: HATZ DIESEL, MODEL- IB20-6. a) Overhauling of engine to be carried out. Injector to be renewed (The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 408 | 1012EQPT: DD COMPRESSOR ENGINEb) Calibration of FIP assembly to be carried out. FIP assembly to be prove for satidfactory performance . | 1012EQPT: DD COMPRESSOR ENGINEb) Calibration of FIP assembly to be carried out. FIP assembly to be prove for satidfactory performance . |
| 409 | 1012EQPT: DD COMPRESSOR ENGINEc) Drain Lub oil sump, Clean and charge with new oil. ( supplied by Firm) Qty-20 Ltrs | 1012EQPT: DD COMPRESSOR ENGINEc) Drain Lub oil sump, Clean and charge with new oil. ( supplied by Firm) Qty-20 Ltrs |
| 410 | 1012EQPT: DD COMPRESSOR ENGINEd)Replacement of air intake element, fuel filter element, and lub oil filter element to be carried out. (Firm to supply filters) | 1012EQPT: DD COMPRESSOR ENGINEd)Replacement of air intake element, fuel filter element, and lub oil filter element to be carried out. (Firm to supply filters) |
| 411 | 1012EQPT: DD COMPRESSOR ENGINEe) Replacement of V Belts to be carried out. A50 | 1012EQPT: DD COMPRESSOR ENGINEe) Replacement of V Belts to be carried out. A50 |
| 412 | 1012EQPT: DD COMPRESSOR ENGINEf) Engine to be proved for satisfactory performance along with compressor post work completion. | 1012EQPT: DD COMPRESSOR ENGINEf) Engine to be proved for satisfactory performance along with compressor post work completion. |
| 413 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCO, MODEL-LT5-60KE (Qty-02 Nos), MODEL-LT3-30KE (Qty-01 Nos), TYPE: 2 STAGE RECIPROCATING ,CAPACITY:- 12.4 CMH at 30 Bar. | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCO, MODEL-LT5-60KE (Qty-02 Nos), MODEL-LT3-30KE (Qty-01 Nos), TYPE: 2 STAGE RECIPROCATING ,CAPACITY:- 12.4 CMH at 30 Bar. |
| 414 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCO,MODEL-LT5-60KE, TYPE: 2 STAGE RECIPROCATING ,CAPACITY:- 12.4 CMH at 30 Bar.(a) Complete overhauling of compressors to be carried out. Renew filters and water seperators. Renew compressor belts. Renew of Couplings along with two metal hubs and hard rubber(The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCO,MODEL-LT5-60KE, TYPE: 2 STAGE RECIPROCATING ,CAPACITY:- 12.4 CMH at 30 Bar.(a) Complete overhauling of compressors to be carried out. Renew filters and water seperators. Renew compressor belts. Renew of Couplings along with two metal hubs and hard rubber(The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 415 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOb) Renew both big end and small end bearings of connecting rod . | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOb) Renew both big end and small end bearings of connecting rod . |
| 416 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCO, c) Air compressor lub oil sump to be drained, cleaned, and new oil to be charged in sump.(Oil to be supplied by Firm, Lub Oil- Atlas Copco Piston Fluid, Lubricant for LE/LT piston compressors), Qty-40 Ltrs | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCO, c) Air compressor lub oil sump to be drained, cleaned, and new oil to be charged in sump.(Oil to be supplied by Firm, Lub Oil- Atlas Copco Piston Fluid, Lubricant for LE/LT piston compressors), Qty-40 Ltrs |
| 417 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOd) Firm to supply and renew Piston rings | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOd) Firm to supply and renew Piston rings |
| 418 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOe) Firm to supply and renew Air inlet filter element and head gaskets | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOe) Firm to supply and renew Air inlet filter element and head gaskets |
| 419 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOf) Firm to supply and renew Pressure switches and set required pressures (cut in 20 and cut out at 30 bar). | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOf) Firm to supply and renew Pressure switches and set required pressures (cut in 20 and cut out at 30 bar). |
| 420 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOg)Chemical Cleaning and pressure testing of air bottles to be carried out capacity: 500ltrs TP: 45 bar, Air bottles to be removed and taken to designated place at firm workshop. Post cleaning and testing Air bottles to be fitted in original position onboard | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOg)Chemical Cleaning and pressure testing of air bottles to be carried out capacity: 500ltrs TP: 45 bar, Air bottles to be removed and taken to designated place at firm workshop. Post cleaning and testing Air bottles to be fitted in original position onboard |
| 421 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOh)Calibrate Relief valves on air bottles set presure is 45 bar. | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOh)Calibrate Relief valves on air bottles set presure is 45 bar. |
| 422 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOj) Firm to supply and renew air system drain line ball valves (dia 20 mm) | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOj) Firm to supply and renew air system drain line ball valves (dia 20 mm) |
| 423 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOk) Firm to supply and renew air system inlet/outlet ball valves (dia 50mm) | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOk) Firm to supply and renew air system inlet/outlet ball valves (dia 50mm) |
| 424 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOm) Fabrication of the foundation frame and painting to be done. | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOm) Fabrication of the foundation frame and painting to be done. |
| 425 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOn) Replace shock and vibration mounts. | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOn) Replace shock and vibration mounts. |
| 426 | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOp) Carry out alignment of compressor with motor and to be proved for satisfactory performance of capacity trails. | 1013EQPT: AIR COMPRESSOR ,MAKE: ATLAS COPCOp) Carry out alignment of compressor with motor and to be proved for satisfactory performance of capacity trails. |
| 427 | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVAL,MODEL: P605,SL.NO: 4215658, Qty-01 Nos(The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVAL,MODEL: P605,SL.NO: 4215658, Qty-01 Nos(The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 428 | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVAL,a) Overhauling of purifier to be carried out. Inspection of separator bowl,inlet/outlet and operating water system to be done. Defective parts to be renewed. | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVAL,a) Overhauling of purifier to be carried out. Inspection of separator bowl,inlet/outlet and operating water system to be done. Defective parts to be renewed. |
| 429 | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVAL,b) Lub oil sump to be drained, Cleaned, and new oil to be charged in sump.(supplied by Firm). | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVAL,b) Lub oil sump to be drained, Cleaned, and new oil to be charged in sump.(supplied by Firm). |
| 430 | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVALc) Replace flexible hoses of water and fuel lines. | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVALc) Replace flexible hoses of water and fuel lines. |
| 431 | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVALd) Replacement of bearings, seals,buffers and gaskets in drive system. | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVALd) Replacement of bearings, seals,buffers and gaskets in drive system. |
| 432 | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVALe) Purifier to be proved for satisfactory performance | 1014EQPT: FUEL OIL PURIFIER, MAKE: ALFA LAVALe) Purifier to be proved for satisfactory performance |
| 433 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWO,MODEL: SKIT-S-DEV 0.25,SL.NO: 13443, CAPACITY: 0.25m3/hr | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWO,MODEL: SKIT-S-DEV 0.25,SL.NO: 13443, CAPACITY: 0.25m3/hr |
| 434 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOa) Repalcement PPM monitor to be carried out. | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOa) Repalcement PPM monitor to be carried out. |
| 435 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOb) Replacement of measuring shell to be carried out. | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOb) Replacement of measuring shell to be carried out. |
| 436 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOc) Cleaning of primary and secondary tanks to be carried out & internal painting to be undertaken | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOc) Cleaning of primary and secondary tanks to be carried out & internal painting to be undertaken |
| 437 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOd) Firm to supply and renew filters in primary and secondary tanks | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOd) Firm to supply and renew filters in primary and secondary tanks |
| 438 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOe) Overhauling of discharge pump to be carried out. Dismantle pump completely. Examine parts for wear.Shaft and impeller to be cleaned and polished, Renew wear ring,bushes, mechanical seals, bearings,sealing rings, keys ,gland packing and gaskets. Pump to be proved for satisfactory performance.(The cost of spares/material required for the overhauling to be included in cost of spares/material). | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOe) Overhauling of discharge pump to be carried out. Dismantle pump completely. Examine parts for wear.Shaft and impeller to be cleaned and polished, Renew wear ring,bushes, mechanical seals, bearings,sealing rings, keys ,gland packing and gaskets. Pump to be proved for satisfactory performance.(The cost of spares/material required for the overhauling to be included in cost of spares/material). |
| 439 | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOf) Oily Water Seperator to be proved for satisfactory performance post work completion. | 1015EQPT: OIL WATER SEPERATOR, MAKE: RWOf) Oily Water Seperator to be proved for satisfactory performance post work completion. |
| 440 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T |
| 441 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(a) Fuel oil injection pump to be calibrated. | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(a) Fuel oil injection pump to be calibrated. |
| 442 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(b) Fresh water pump to be renewed | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(b) Fresh water pump to be renewed |
| 443 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(c) Fuel injection pump HP lines to be renewed.(As per Sample, Length 01 Mtr) | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(c) Fuel injection pump HP lines to be renewed.(As per Sample, Length 01 Mtr) |
| 444 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(d) Servicing of Radiator to be carried out. Firm to provide cap with O Ring | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(d) Servicing of Radiator to be carried out. Firm to provide cap with O Ring |
| 445 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(e) Fuel hoses (wire braded) to be renewed | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(e) Fuel hoses (wire braded) to be renewed |
| 446 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(f) Valve tappet setting to be checked and adjusted | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(f) Valve tappet setting to be checked and adjusted |
| 447 | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(g) Injectors to be Callibrated and adjusted. | 1016EQPT: HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 T(g) Injectors to be Callibrated and adjusted. |
| 448 | 1016EQPT: HARBOUR DIESEL GENERATORh) Engine lub oil sump to be drained and system to be flushed. Fresh lub oil to be charged into sump. ISO VG 15 W 40 Lub oil( qty- 60 Ltrs) to be provided by Firm) | 1016EQPT: HARBOUR DIESEL GENERATORh) Engine lub oil sump to be drained and system to be flushed. Fresh lub oil to be charged into sump. ISO VG 15 W 40 Lub oil( qty- 60 Ltrs) to be provided by Firm) |
| 449 | 1016EQPT: HARBOUR DIESEL GENERATORj) Firm to supply and renew Lub Oil Filter Catridges | 1016EQPT: HARBOUR DIESEL GENERATORj) Firm to supply and renew Lub Oil Filter Catridges |
| 450 | 1016EQPT: HARBOUR DIESEL GENERATORk) Engine Coolant Circuit to be flush through and Firm to supply and renew coolant | 1016EQPT: HARBOUR DIESEL GENERATORk) Engine Coolant Circuit to be flush through and Firm to supply and renew coolant |
| 451 | 1016EQPT: HARBOUR DIESEL GENERATORm) Firm to supply and renew Fuel oil Filter Catridges | 1016EQPT: HARBOUR DIESEL GENERATORm) Firm to supply and renew Fuel oil Filter Catridges |
| 452 | 1016EQPT: HARBOUR DIESEL GENERATORn) Main Element of dry type air cleaner , rubber hose and clip of dry type air cleaner to be replaced. (Filters to be provided by Firm, Qty-10) | 1016EQPT: HARBOUR DIESEL GENERATORn) Main Element of dry type air cleaner , rubber hose and clip of dry type air cleaner to be replaced. (Filters to be provided by Firm, Qty-10) |
| 453 | 1016EQPT: HARBOUR DIESEL GENERATORp) Firm to supply and renew joint of rocker cover | 1016EQPT: HARBOUR DIESEL GENERATORp) Firm to supply and renew joint of rocker cover |
| 454 | 1016EQPT: HARBOUR DIESEL GENERATORq) Firm to supply and renew Rubber hoses and clip | 1016EQPT: HARBOUR DIESEL GENERATORq) Firm to supply and renew Rubber hoses and clip |
| 455 | 1016EQPT: HARBOUR DIESEL GENERATORr) Firm to supply & replace all engine V Belts & Flexible hoses. Firm to supply as per sample | 1016EQPT: HARBOUR DIESEL GENERATORr) Firm to supply & replace all engine V Belts & Flexible hoses. Firm to supply as per sample |
| 456 | 1016EQPT:HARBOUR DIESEL GENERATORs) DA Fresh water cooler & Expansion Tank to be chemically cleaned & pressure test by Firm. | 1016EQPT:HARBOUR DIESEL GENERATORs) DA Fresh water cooler & Expansion Tank to be chemically cleaned & pressure test by Firm. |
| 457 | 1016EQPT:HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 Tt) DA Starter 12V, 2 wire system Patt no. 4H.466.09.0.00 new one provide by Firm. | 1016EQPT:HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 Tt) DA Starter 12V, 2 wire system Patt no. 4H.466.09.0.00 new one provide by Firm. |
| 458 | 1016EQPT:HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 Tu) Vibration mountings to be renewed | 1016EQPT:HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 Tu) Vibration mountings to be renewed |
| 459 | 1017, EQPT/SYSTEM: VALVES ( Firm Not To Quote ) Following valves to be overhauled and pressure tested. Testing pressure:-S/W System-9 kg/cm2,Air System-45 kg/cm2,F/W System-5 kg/cm2. NOTE :-Overhauling of valves includes renewal of valve spindle, valve disc, gland. | 1017, EQPT/SYSTEM: VALVES ( Firm Not To Quote ) Following valves to be overhauled and pressure tested. Testing pressure:-S/W System-9 kg/cm2,Air System-45 kg/cm2,F/W System-5 kg/cm2. NOTE :-Overhauling of valves includes renewal of valve spindle, valve disc, gland. |
| 460 | 1017, EQPT/SYSTEM: VALVES a) Overhauling and pressure testing of Gate valve dia 200mm | 1017, EQPT/SYSTEM: VALVES a) Overhauling and pressure testing of Gate valve dia 200mm |
| 461 | 1017, EQPT/SYSTEM: VALVES b) Overhauling and pressure testing of Gate valve dia 100mm | 1017, EQPT/SYSTEM: VALVES b) Overhauling and pressure testing of Gate valve dia 100mm |
| 462 | 1017, EQPT/SYSTEM: VALVES c) Overhauling and pressure testing of Gate valve dia 50mm | 1017, EQPT/SYSTEM: VALVES c) Overhauling and pressure testing of Gate valve dia 50mm |
| 463 | 1017, EQPT/SYSTEM: VALVES d) Overhauling and pressure testing of Ball valve dia 50mm | 1017, EQPT/SYSTEM: VALVES d) Overhauling and pressure testing of Ball valve dia 50mm |
| 464 | 1017, EQPT/SYSTEM: VALVES e) Overhauling and pressure testing of Ball valve dia 32mm | 1017, EQPT/SYSTEM: VALVES e) Overhauling and pressure testing of Ball valve dia 32mm |
| 465 | 1017, EQPT/SYSTEM: VALVES f) Overhauling and pressure testing of Ball valve dia 30mm | 1017, EQPT/SYSTEM: VALVES f) Overhauling and pressure testing of Ball valve dia 30mm |
| 466 | 1017, EQPT/SYSTEM: VALVES g) Overhauling and pressure testing of Ball valve dia 25mm | 1017, EQPT/SYSTEM: VALVES g) Overhauling and pressure testing of Ball valve dia 25mm |
| 467 | 1017, EQPT/SYSTEM: VALVES h) Overhauling and pressure testing of Ball valve dia 20mm | 1017, EQPT/SYSTEM: VALVES h) Overhauling and pressure testing of Ball valve dia 20mm |
| 468 | 1017, EQPT/SYSTEM: VALVES j) Overhauling and pressure testing of Ball valve dia 15mm | 1017, EQPT/SYSTEM: VALVES j) Overhauling and pressure testing of Ball valve dia 15mm |
| 469 | 1017, EQPT/SYSTEM: VALVES k) Overhauling and pressure testing of SDNR valve dia 100mm | 1017, EQPT/SYSTEM: VALVES k) Overhauling and pressure testing of SDNR valve dia 100mm |
| 470 | 1017, EQPT/SYSTEM: VALVES l) Overhauling and pressure testing of SDNR valve dia 65mm | 1017, EQPT/SYSTEM: VALVES l) Overhauling and pressure testing of SDNR valve dia 65mm |
| 471 | 1017, EQPT/SYSTEM: VALVES m) Overhauling and pressure testing of SDNR valve dia 60mm | 1017, EQPT/SYSTEM: VALVES m) Overhauling and pressure testing of SDNR valve dia 60mm |
| 472 | 1017, EQPT/SYSTEM: VALVES n) Overhauling and pressure testing of SDNR valve dia 50mm | 1017, EQPT/SYSTEM: VALVES n) Overhauling and pressure testing of SDNR valve dia 50mm |
| 473 | 1017, EQPT/SYSTEM: VALVES o) Overhauling and pressure testing of SDNR valve dia 40mm | 1017, EQPT/SYSTEM: VALVES o) Overhauling and pressure testing of SDNR valve dia 40mm |
| 474 | 1017, EQPT/SYSTEM: VALVES p) Overhauling and pressure testing of SDNR valve dia 32mm | 1017, EQPT/SYSTEM: VALVES p) Overhauling and pressure testing of SDNR valve dia 32mm |
| 475 | 1017, EQPT/SYSTEM: VALVES q) Overhauling and pressure testing of SDNR valve dia 30mm | 1017, EQPT/SYSTEM: VALVES q) Overhauling and pressure testing of SDNR valve dia 30mm |
| 476 | 1017, EQPT/SYSTEM: VALVES r) Overhauling and pressure testing of SDNR valve dia 25mm | 1017, EQPT/SYSTEM: VALVES r) Overhauling and pressure testing of SDNR valve dia 25mm |
| 477 | 1017, EQPT/SYSTEM: VALVES s) Overhauling and pressure testing of SDNR valve dia 20mm | 1017, EQPT/SYSTEM: VALVES s) Overhauling and pressure testing of SDNR valve dia 20mm |
| 478 | 1017, EQPT/SYSTEM: VALVES t) Overhauling and pressure testing of SDNR valve dia 15mm | 1017, EQPT/SYSTEM: VALVES t) Overhauling and pressure testing of SDNR valve dia 15mm |
| 479 | 1017, EQPT/SYSTEM: VALVES u) Overhauling and pressure testing of Anlge valve dia 100mm | 1017, EQPT/SYSTEM: VALVES u) Overhauling and pressure testing of Anlge valve dia 100mm |
| 480 | 1017, EQPT/SYSTEM: VALVES v) Overhauling and pressure testing of Anlge valve dia 65mm | 1017, EQPT/SYSTEM: VALVES v) Overhauling and pressure testing of Anlge valve dia 65mm |
| 481 | 1017, EQPT/SYSTEM: VALVES w) Overhauling and pressure testing of Anlge valve dia 50mm | 1017, EQPT/SYSTEM: VALVES w) Overhauling and pressure testing of Anlge valve dia 50mm |
| 482 | 1017, EQPT/SYSTEM: VALVES x) Overhauling and pressure testing of Anlge valve dia 40mm | 1017, EQPT/SYSTEM: VALVES x) Overhauling and pressure testing of Anlge valve dia 40mm |
| 483 | 1017, EQPT/SYSTEM: VALVES y) Overhauling and pressure testing of Fire hydrant valve dia 65mm | 1017, EQPT/SYSTEM: VALVES y) Overhauling and pressure testing of Fire hydrant valve dia 65mm |
| 484 | 1017, EQPT/SYSTEM: VALVES z) Overhauling and pressure testing of Pressure releif valve dia 65mm | 1017, EQPT/SYSTEM: VALVES z) Overhauling and pressure testing of Pressure releif valve dia 65mm |
| 485 | 1017, EQPT/SYSTEM: VALVES aa) Overhauling and pressure testing of Pressure releif valve dia 50mm | 1017, EQPT/SYSTEM: VALVES aa) Overhauling and pressure testing of Pressure releif valve dia 50mm |
| 486 | 1017, EQPT/SYSTEM: VALVES ab) Overhauling and pressure testing of Quick shut off valve dia 50mm | 1017, EQPT/SYSTEM: VALVES ab) Overhauling and pressure testing of Quick shut off valve dia 50mm |
| 487 | 1017, EQPT/SYSTEM: VALVES ac) Overhauling and pressure testing of Quick shut off valve dia 40mm | 1017, EQPT/SYSTEM: VALVES ac) Overhauling and pressure testing of Quick shut off valve dia 40mm |
| 488 | 1017, EQPT/SYSTEM: VALVES ad) Overhauling and pressure testing of Quick shut off valve dia 32mm | 1017, EQPT/SYSTEM: VALVES ad) Overhauling and pressure testing of Quick shut off valve dia 32mm |
| 489 | 1017, EQPT/SYSTEM: VALVES ae) Overhauling and pressure testing of reducer valve dia 20 mm | 1017, EQPT/SYSTEM: VALVES ae) Overhauling and pressure testing of reducer valve dia 20 mm |
| 490 | 1017, EQPT/SYSTEM: VALVES af) Overhauling and pressure testing of Globe valve dia 50 mm | 1017, EQPT/SYSTEM: VALVES af) Overhauling and pressure testing of Globe valve dia 50 mm |
| 491 | 1017, EQPT/SYSTEM: VALVES ag) Fire line sprinklers to be renewed as per sample | 1017, EQPT/SYSTEM: VALVES ag) Fire line sprinklers to be renewed as per sample |
| 492 | 1017, EQPT/SYSTEM:BUTTERFLY VALVE ah) Renewal of fuel oil Quick shut off valve wire rope, 6mm dia, mat SS | 1017, EQPT/SYSTEM:BUTTERFLY VALVE ah) Renewal of fuel oil Quick shut off valve wire rope, 6mm dia, mat SS |
| 493 | 1017, EQPT/SYSTEM: VALVES ai) Firm to supply new Sea chest Butterfly/Gate valves . Firm to supply suitable valve for sea chest (250 mm v/v with SS lids). Valve (Material: Nickel aluminium bronze) | 1017, EQPT/SYSTEM: VALVES ai) Firm to supply new Sea chest Butterfly/Gate valves . Firm to supply suitable valve for sea chest (250 mm v/v with SS lids). Valve (Material: Nickel aluminium bronze) |
| 494 | 1017, EQPT/SYSTEM: VALVESaj) Renewal of Sea chest valves with new (250 mm dia v/v ). Job includes degutting of existing piping and valve arrangement and modification of system pipe line as per requirement onboard. Firm is required to undertake proper assessment and quote accordingly. Prove for satisfactory operation | 1017, EQPT/SYSTEM: VALVESaj) Renewal of Sea chest valves with new (250 mm dia v/v ). Job includes degutting of existing piping and valve arrangement and modification of system pipe line as per requirement onboard. Firm is required to undertake proper assessment and quote accordingly. Prove for satisfactory operation |
| 495 | 1017, EQPT/SYSTEM: VALVESak) Firm to supply new gate valves for main engine sea water line. Firm to supply suitable valve (100 mm Dia v/v). (Material: Nickel aluminium bronze) | 1017, EQPT/SYSTEM: VALVESak) Firm to supply new gate valves for main engine sea water line. Firm to supply suitable valve (100 mm Dia v/v). (Material: Nickel aluminium bronze) |
| 496 | 1017, EQPT/SYSTEM: VALVESal) Renewal of valves with new (100 mm dia v/v ). Job includes degutting of existing piping and valve arrangement and modification of system pipe line as per requirement onboard. Firm is required to undertake proper assessment and quote accordingly. Prove for satisfactory operation | 1017, EQPT/SYSTEM: VALVESal) Renewal of valves with new (100 mm dia v/v ). Job includes degutting of existing piping and valve arrangement and modification of system pipe line as per requirement onboard. Firm is required to undertake proper assessment and quote accordingly. Prove for satisfactory operation |
| 497 | 1017, EQPT/SYSTEM: VALVESam) Firm to supply new gate valves for DG engine sea water line. Firm to supply suitable valve (80 mm Dia v/v). (Material: Nickel aluminium bronze) | 1017, EQPT/SYSTEM: VALVESam) Firm to supply new gate valves for DG engine sea water line. Firm to supply suitable valve (80 mm Dia v/v). (Material: Nickel aluminium bronze) |
| 498 | 1017, EQPT/SYSTEM: VALVESan) Renewal of valves with new (80 mm dia v/v ). Job includes degutting of existing piping and valve arrangement and modification of system pipe line as per requirement onboard. Firm is required to undertake proper assessment and quote accordingly. Post fitment of valve prove for satisfactory operation | 1017, EQPT/SYSTEM: VALVESan) Renewal of valves with new (80 mm dia v/v ). Job includes degutting of existing piping and valve arrangement and modification of system pipe line as per requirement onboard. Firm is required to undertake proper assessment and quote accordingly. Post fitment of valve prove for satisfactory operation |
| 499 | 1017, EQPT/SYSTEM: VALVESao) Firm to supply new ball valves for compressed air system. Air bottle outlet valves are not operational. Firm to supply suitable valve (40 mm Dia v/v). Post fitment of valve prove for satisfactory operation (Material: Brass) | 1017, EQPT/SYSTEM: VALVESao) Firm to supply new ball valves for compressed air system. Air bottle outlet valves are not operational. Firm to supply suitable valve (40 mm Dia v/v). Post fitment of valve prove for satisfactory operation (Material: Brass) |
| 500 | 1017, EQPT/SYSTEM: VALVESap) Firm to supply new ball valves for compressed air system. Air bottle drain valves are not operational. Firm to supply suitable valve (15 mm Dia v/v). (Material: Brass) Post fitment of valve prove for satisfactory operation | 1017, EQPT/SYSTEM: VALVESap) Firm to supply new ball valves for compressed air system. Air bottle drain valves are not operational. Firm to supply suitable valve (15 mm Dia v/v). (Material: Brass) Post fitment of valve prove for satisfactory operation |
| 501 | 1017, EQPT/SYSTEM: VALVESaq) Firm to supply new ball valves for compressed air system. Air bottle inlet valves are not operational. Firm to supply suitable gate valve (20 mm Dia v/v). (Material: Nickel aluminium bronze) Post fitment of valve prove for satisfactory operation | 1017, EQPT/SYSTEM: VALVESaq) Firm to supply new ball valves for compressed air system. Air bottle inlet valves are not operational. Firm to supply suitable gate valve (20 mm Dia v/v). (Material: Nickel aluminium bronze) Post fitment of valve prove for satisfactory operation |
| 502 | 1017, EQPT/SYSTEM: VALVESar) Overhauling and pressure testing of 80mm valves, Type - SDNR, | 1017, EQPT/SYSTEM: VALVESar) Overhauling and pressure testing of 80mm valves, Type - SDNR, |
| 503 | 1017, EQPT/SYSTEM: VALVESas) Overhauling and pressure testing of 65mm Valves, Type - SDNR, | 1017, EQPT/SYSTEM: VALVESas) Overhauling and pressure testing of 65mm Valves, Type - SDNR, |
| 504 | 1017, EQPT/SYSTEM: VALVESat) Overhauling and pressure testing of 50mm Valves, Type - SD, Material- Bronze | 1017, EQPT/SYSTEM: VALVESat) Overhauling and pressure testing of 50mm Valves, Type - SD, Material- Bronze |
| 505 | 1017, EQPT/SYSTEM: VALVESau) Overhauling and pressure testing of 40mm Valves, Type - Gate, Material- Bronze | 1017, EQPT/SYSTEM: VALVESau) Overhauling and pressure testing of 40mm Valves, Type - Gate, Material- Bronze |
| 506 | 1017, EQPT/SYSTEM: VALVESav) Overhauling and pressure testing of 40mm Valves, Type - SDNR, Material- Bronze | 1017, EQPT/SYSTEM: VALVESav) Overhauling and pressure testing of 40mm Valves, Type - SDNR, Material- Bronze |
| 507 | 1017, EQPT/SYSTEM: VALVESaw) Overhauling and pressure testing of 32mm valve, Type-Niddle, Material-Bronze, Make-Harshad engg | 1017, EQPT/SYSTEM: VALVESaw) Overhauling and pressure testing of 32mm valve, Type-Niddle, Material-Bronze, Make-Harshad engg |
| 508 | 1017, EQPT/SYSTEM: VALVESax) Overhauling and pressure testing of 32mm Valves, Type - Gate, Material- Bronze | 1017, EQPT/SYSTEM: VALVESax) Overhauling and pressure testing of 32mm Valves, Type - Gate, Material- Bronze |
| 509 | 1017, EQPT/SYSTEM: VALVESay) Overhauling and pressure testing of 20 mm Valves, Type-Gate, Material-Gun Metal | 1017, EQPT/SYSTEM: VALVESay) Overhauling and pressure testing of 20 mm Valves, Type-Gate, Material-Gun Metal |
| 510 | 1017, EQPT/SYSTEM: VALVESaz) Overhauling and pressure testing of 20mm Valves, Type-SD,Matrial-Gun Metal | 1017, EQPT/SYSTEM: VALVESaz) Overhauling and pressure testing of 20mm Valves, Type-SD,Matrial-Gun Metal |
| 511 | 1017, EQPT/SYSTEM: VALVESaaa) Overhauling and pressure testing of 20mm valve, Type-Needle, Material-Bronze, Make-Harshad engg | 1017, EQPT/SYSTEM: VALVESaaa) Overhauling and pressure testing of 20mm valve, Type-Needle, Material-Bronze, Make-Harshad engg |
| 512 | 1017, EQPT/SYSTEM: VALVESaab) Overhauling and pressure testing of 12mm , Type - Gate, Material- Gun Metal | 1017, EQPT/SYSTEM: VALVESaab) Overhauling and pressure testing of 12mm , Type - Gate, Material- Gun Metal |
| 513 | 1017, EQPT/SYSTEM: VALVESaac) Overhauling and pressure testing of 15mm Valves, Type-Globe ,Material-Gun Metal | 1017, EQPT/SYSTEM: VALVESaac) Overhauling and pressure testing of 15mm Valves, Type-Globe ,Material-Gun Metal |
| 514 | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aad) Overhauling and pressure testing of Butterfly valve,Dia-250mm to be carried out | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aad) Overhauling and pressure testing of Butterfly valve,Dia-250mm to be carried out |
| 515 | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aae) Overhauling and pressure testing of Butterfly valve, Dia- 125mm to be carried out | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aae) Overhauling and pressure testing of Butterfly valve, Dia- 125mm to be carried out |
| 516 | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aaf) Overhauling and pressure testing of Butterfly valve, Dia- 100mm to be carried out | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aaf) Overhauling and pressure testing of Butterfly valve, Dia- 100mm to be carried out |
| 517 | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aag) Overhauling and pressure testing of Butterfly valve,Dia-80mm to be carried out | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aag) Overhauling and pressure testing of Butterfly valve,Dia-80mm to be carried out |
| 518 | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aah) Overhauling and pressure testing of Butterfly valve,Dia-60mm to be carried out | 1017, EQPT/SYSTEM:BUTTERFLY VALVE aah) Overhauling and pressure testing of Butterfly valve,Dia-60mm to be carried out |
| 519 | 1018EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Following system pipes to be removed, chemically cleaned , pressure tested ( 1.5 times of working pressure ). Firm to undertake necessary repair of defective system pipe line Post fitment of pipelines, Firm to paint all system pipe line as per colour code. All pipes clamp to be secure properly using new rubber pads. | 1018EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Following system pipes to be removed, chemically cleaned , pressure tested ( 1.5 times of working pressure ). Firm to undertake necessary repair of defective system pipe line Post fitment of pipelines, Firm to paint all system pipe line as per colour code. All pipes clamp to be secure properly using new rubber pads. |
| 520 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGa) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 300 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGa) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 300 mm) |
| 521 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGb) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 200 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGb) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 200 mm) |
| 522 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGc) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 100 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGc) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 100 mm) |
| 523 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGd) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 65 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGd) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 65 mm) |
| 524 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGe) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 50 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGe) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 50 mm) |
| 525 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGf) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 40 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGf) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 40 mm) |
| 526 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGg) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 32 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGg) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 32 mm) |
| 527 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGh) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 25 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGh) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 25 mm) |
| 528 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGj) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 20 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGj) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.- 20 mm) |
| 529 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGk) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.-15 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGk) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.-15 mm) |
| 530 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGm) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.-150 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGm) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.-150 mm) |
| 531 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGn) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.-80 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGn) Chemical cleaning and pressure testing of pipe line to be carried out. (Mat:-CuNi/MS Dia.-80 mm) |
| 532 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGp) Chemical cleaning and pressure testing of tanks Air vent pipe line to be carried out. (Mat:-MS Dia.-65 mm), Main Deck | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGp) Chemical cleaning and pressure testing of tanks Air vent pipe line to be carried out. (Mat:-MS Dia.-65 mm), Main Deck |
| 533 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGq) Chemical cleaning and pressure testing of tanks Air vent pipe line to be carried out. (Mat:-MS Dia.-50 mm), Main Deck | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGq) Chemical cleaning and pressure testing of tanks Air vent pipe line to be carried out. (Mat:-MS Dia.-50 mm), Main Deck |
| 534 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGr) Firm to supply and replace all studs/nut and bolt (Mat :- MS) for all pipe lines. Size as per sample | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGr) Firm to supply and replace all studs/nut and bolt (Mat :- MS) for all pipe lines. Size as per sample |
| 535 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGs) Firm to supply and replace all studs/nut and bolt (Mat :- SS) for all pipe lines. Size as per sample | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGs) Firm to supply and replace all studs/nut and bolt (Mat :- SS) for all pipe lines. Size as per sample |
| 536 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGt) Firm to supply and replace all rubber joints/ oil joints/ steam joints for all pipe lines. Size as per sample | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGt) Firm to supply and replace all rubber joints/ oil joints/ steam joints for all pipe lines. Size as per sample |
| 537 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGu) Firm to paint all system pipe line as per colour code | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGu) Firm to paint all system pipe line as per colour code |
| 538 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGv) All pipes clamp to be secure properly using new rubber pads. | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGv) All pipes clamp to be secure properly using new rubber pads. |
| 539 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGw) Cleaning and pressure testing of Bilge system manifold to be carried out. | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGw) Cleaning and pressure testing of Bilge system manifold to be carried out. |
| 540 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGx) Provisioning of Bilge system suction lines foot valves to be carried out. As per requirement | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGx) Provisioning of Bilge system suction lines foot valves to be carried out. As per requirement |
| 541 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGy) Chemical cleaning and pressure testing of external FF line to be carried out. (Mat:-CuNi Dia.- 81 to 110 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGy) Chemical cleaning and pressure testing of external FF line to be carried out. (Mat:-CuNi Dia.- 81 to 110 mm) |
| 542 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGz) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- 101 to 200mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGz) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- 101 to 200mm) |
| 543 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGaa) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- 51 to 100mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGaa) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- 51 to 100mm) |
| 544 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGab) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- 26 to 50mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGab) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- 26 to 50mm) |
| 545 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGac) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- up to 25 mm) | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGac) Chemical cleaning and pressure testing of main sea chest pipe to be carried out. Sea water system pipe Mat: CuNi, (Dia.- up to 25 mm) |
| 546 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGad) Chemical cleaning and pressure testing of 35mm system pipes Mat: Seamless Copper to be carried out | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGad) Chemical cleaning and pressure testing of 35mm system pipes Mat: Seamless Copper to be carried out |
| 547 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGae) Chemical cleaning and pressure testing of 40 mm fuel system pipe Mat: Stainless Steel to be carried out | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGae) Chemical cleaning and pressure testing of 40 mm fuel system pipe Mat: Stainless Steel to be carried out |
| 548 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGaf) Chemical cleaning and pressure testing of 25 mm system pipe Mat: Stainless Steel to be carried out | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGaf) Chemical cleaning and pressure testing of 25 mm system pipe Mat: Stainless Steel to be carried out |
| 549 | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGag) Chemical cleaning and pressure testing of 20mm system pipe, Mat:-Stainless Steel to be carried out | 1018, EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANINGag) Chemical cleaning and pressure testing of 20mm system pipe, Mat:-Stainless Steel to be carried out |
| 550 | 1018(a)Renewal of System pipe linesFirm to renewal system pipes lines as indicated below mentioned serial. Job includes manufacturing of new pipes as per sample, Further templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. Prove system pipe lines for satisfactory operation | 1018(a)Renewal of System pipe linesFirm to renewal system pipes lines as indicated below mentioned serial. Job includes manufacturing of new pipes as per sample, Further templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. Prove system pipe lines for satisfactory operation |
| 551 | 1018(a)Renewal of System pipe lines(a) System Pipes Lines (Mild Steel) up to 25 mm | 1018(a)Renewal of System pipe lines(a) System Pipes Lines (Mild Steel) up to 25 mm |
| 552 | 1018(a)Renewal of System pipe lines(b) System Pipes Lines (Mild Steel) 26 mm to 50 mm | 1018(a)Renewal of System pipe lines(b) System Pipes Lines (Mild Steel) 26 mm to 50 mm |
| 553 | 1018(a)Renewal of System pipe lines(c) System Pipes Lines (Mild Steel) 51 mm to 75 mm | 1018(a)Renewal of System pipe lines(c) System Pipes Lines (Mild Steel) 51 mm to 75 mm |
| 554 | 1018(a)Renewal of System pipe lines(d) System Pipes Lines (Mild Steel) 76 mm to 100 mm | 1018(a)Renewal of System pipe lines(d) System Pipes Lines (Mild Steel) 76 mm to 100 mm |
| 555 | 1018(a)Renewal of System pipe lines(e) System Pipes Lines (Copper/Cuero Nickel/Cu Ni/SS 316 Ti ) up to 25 mm | 1018(a)Renewal of System pipe lines(e) System Pipes Lines (Copper/Cuero Nickel/Cu Ni/SS 316 Ti ) up to 25 mm |
| 556 | 1018(a)Renewal of System pipe lines(f) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 26 mm to 50 mm | 1018(a)Renewal of System pipe lines(f) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 26 mm to 50 mm |
| 557 | 1018(a)Renewal of System pipe lines(g) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 51 mm to 75 mm | 1018(a)Renewal of System pipe lines(g) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 51 mm to 75 mm |
| 558 | 1018(a)Renewal of System pipe lines(h) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 6mm to 10 mm | 1018(a)Renewal of System pipe lines(h) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 6mm to 10 mm |
| 559 | 1018(a)Renewal of System pipe lines(j) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 11 mm to 20 mm | 1018(a)Renewal of System pipe lines(j) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 11 mm to 20 mm |
| 560 | 1018(a)Renewal of System pipe lines(k) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Mild Steel Dia up to 25 mm | 1018(a)Renewal of System pipe lines(k) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Mild Steel Dia up to 25 mm |
| 561 | 1018(a)Renewal of System pipe lines(m) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: Mild Steel | 1018(a)Renewal of System pipe lines(m) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: Mild Steel |
| 562 | 1018(a)Renewal of System pipe lines(n) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) | 1018(a)Renewal of System pipe lines(n) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) |
| 563 | 1018(a)Renewal of System pipe lines(p) Old rubber rings inside the clamps are damaged. Firm to supply and replace the old rubber rings with rings. New rubber rings of various sizes as follows (40mm,65mm,80mm,100mm,125mm,150mm,160mm) (10 Nos each) | 1018(a)Renewal of System pipe lines(p) Old rubber rings inside the clamps are damaged. Firm to supply and replace the old rubber rings with rings. New rubber rings of various sizes as follows (40mm,65mm,80mm,100mm,125mm,150mm,160mm) (10 Nos each) |
| 564 | 1019EQPT/SYSTEM: STRAINERS Following system strainers to be manufactured as per sample, Strainer, 3 mm hole Dia, spaced 5 mm apart, with zig zag position of holes | 1019EQPT/SYSTEM: STRAINERS Following system strainers to be manufactured as per sample, Strainer, 3 mm hole Dia, spaced 5 mm apart, with zig zag position of holes |
| 565 | 1019EQPT/SYSTEM: STRAINERS (a) Cleaning of Main sea chest strainers and mud boxes and painting to be carried out | 1019EQPT/SYSTEM: STRAINERS (a) Cleaning of Main sea chest strainers and mud boxes and painting to be carried out |
| 566 | 1019EQPT/SYSTEM: STRAINERS (b) Firm to supply and replace all studs/nut and bolt (Mat :- SS) for sea water strainers for main sea chest, FiFi system. Size as per sample | 1019EQPT/SYSTEM: STRAINERS (b) Firm to supply and replace all studs/nut and bolt (Mat :- SS) for sea water strainers for main sea chest, FiFi system. Size as per sample |
| 567 | 1019EQPT/SYSTEM: STRAINERS (c) Manufacturing of Main supply manifold strainers as per sample ( Dia 251 to 300mm) Material:- Brass, thickness- 3 mm to be carried out | 1019EQPT/SYSTEM: STRAINERS (c) Manufacturing of Main supply manifold strainers as per sample ( Dia 251 to 300mm) Material:- Brass, thickness- 3 mm to be carried out |
| 568 | 1019EQPT/SYSTEM: STRAINERS (d) Manufacturing of Main engine cooling water strainers Dia 80mm, Mat: Brass, thick- 3 mm to be carried out | 1019EQPT/SYSTEM: STRAINERS (d) Manufacturing of Main engine cooling water strainers Dia 80mm, Mat: Brass, thick- 3 mm to be carried out |
| 569 | 1019EQPT/SYSTEM: STRAINERS (e) Manufacturing of E/D sea water pump main suction strainers Dia 200mm,Material:- Brass, thickness- 3 mm to be carried out | 1019EQPT/SYSTEM: STRAINERS (e) Manufacturing of E/D sea water pump main suction strainers Dia 200mm,Material:- Brass, thickness- 3 mm to be carried out |
| 570 | 1019EQPT/SYSTEM: STRAINERS (f) Manufacturing of Foam system inline strainer Dia 30 mm, Material:- Brass, thickness- 3 mm to be carried out | 1019EQPT/SYSTEM: STRAINERS (f) Manufacturing of Foam system inline strainer Dia 30 mm, Material:- Brass, thickness- 3 mm to be carried out |
| 571 | 1019EQPT/SYSTEM: STRAINERS (g) Manufacturing of Fresh water pump suction foot valve 32 mm, Material:- Brass, thickness- 2 mm to be carried out | 1019EQPT/SYSTEM: STRAINERS (g) Manufacturing of Fresh water pump suction foot valve 32 mm, Material:- Brass, thickness- 2 mm to be carried out |
| 572 | 1019EQPT/SYSTEM: STRAINERS (h) Manufacturing of oil cooler sea water system inlet side strainer body to be replaced, including strainer, Body- Material -SS, Strainer material -Brass, Body dimension 12 cm Dia, ht- 16 cm, Strainer dimension - Dia 10 cm and ht 15 cm to be carried out | 1019EQPT/SYSTEM: STRAINERS (h) Manufacturing of oil cooler sea water system inlet side strainer body to be replaced, including strainer, Body- Material -SS, Strainer material -Brass, Body dimension 12 cm Dia, ht- 16 cm, Strainer dimension - Dia 10 cm and ht 15 cm to be carried out |
| 573 | 1019EQPT/SYSTEM: STRAINERS (j) Firm to replace with new purging cocks for sea water strainers. Job includes removal of damaged purging cock and new Purging cocks to be fitted on top cover of sea chest strainer. Firm to provide suitable drain pipe from purging cock to engine room bilges. Prove for satisfactory operation. | 1019EQPT/SYSTEM: STRAINERS (j) Firm to replace with new purging cocks for sea water strainers. Job includes removal of damaged purging cock and new Purging cocks to be fitted on top cover of sea chest strainer. Firm to provide suitable drain pipe from purging cock to engine room bilges. Prove for satisfactory operation. |
| 574 | 1019EQPT/SYSTEM: STRAINERS (k) Manufacturing of 80 mm Line suction strainer to be carried out | 1019EQPT/SYSTEM: STRAINERS (k) Manufacturing of 80 mm Line suction strainer to be carried out |
| 575 | 1019EQPT/SYSTEM: STRAINERS (m) Manufacturing of 100mm Line suction strainer to be carried out | 1019EQPT/SYSTEM: STRAINERS (m) Manufacturing of 100mm Line suction strainer to be carried out |
| 576 | 1019EQPT/SYSTEM: STRAINERS (n) Firm to supply and replace all nut and bolt (Mat :- SS) for sea water strainers for main engine and DGs . Size as per sample | 1019EQPT/SYSTEM: STRAINERS (n) Firm to supply and replace all nut and bolt (Mat :- SS) for sea water strainers for main engine and DGs . Size as per sample |
| 577 | 1020 MISCELLANEOUS (a) DG cooling water pump suction & discharge pipe line to be renewed.( Pipe Dia 40 mm, Mat: CuNi, 10 Mtrs) New valves (Qty-02) to be fitted in Cooling water line to regulate the flow. | 1020 MISCELLANEOUS (a) DG cooling water pump suction & discharge pipe line to be renewed.( Pipe Dia 40 mm, Mat: CuNi, 10 Mtrs) New valves (Qty-02) to be fitted in Cooling water line to regulate the flow. |
| 578 | 1020 MISCELLANEOUS (b) Foundation frame ( Size 1.5 mts* 0.5 Mtrs) to be replace with new one. Primer to be applied post fitment of foundation frame. Set of Nut & bolt ( Material : SS ) to be provided by firm | 1020 MISCELLANEOUS (b) Foundation frame ( Size 1.5 mts* 0.5 Mtrs) to be replace with new one. Primer to be applied post fitment of foundation frame. Set of Nut & bolt ( Material : SS ) to be provided by firm |
| 579 | 1020 MISCELLANEOUS c) Main Engine & DA Engine complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Cautions to be taken while cleaning of engine. Sensors and controls not be damaged. | 1020 MISCELLANEOUS c) Main Engine & DA Engine complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Cautions to be taken while cleaning of engine. Sensors and controls not be damaged. |
| 580 | 1020 MISCELLANEOUS d) Shafting System:- Intermediate/Propeller shaft to be cleaned. Spray down the entire shaft (from main engine to propulsion system) with degreaser. Scrub down the deposited oil,grease,rust and dirt. Grease to be applied to shaft for rust prevention. | 1020 MISCELLANEOUS d) Shafting System:- Intermediate/Propeller shaft to be cleaned. Spray down the entire shaft (from main engine to propulsion system) with degreaser. Scrub down the deposited oil,grease,rust and dirt. Grease to be applied to shaft for rust prevention. |
| 581 | 1020 MISCELLANEOUS e) Main Engine Exhaust trunking to be cleaned internally. Compensator to be replaced with new. | 1020 MISCELLANEOUS e) Main Engine Exhaust trunking to be cleaned internally. Compensator to be replaced with new. |
| 582 | 1020 MISCELLANEOUS f) DA Exhaust trunking to be cleaned internally. Compensator to be replaced with new. | 1020 MISCELLANEOUS f) DA Exhaust trunking to be cleaned internally. Compensator to be replaced with new. |
| 583 | 1020 MISCELLANEOUS g) Zinc Plugs for main engine along with adapters to be replaced. Location of Zinc Plug is elbow of the auxiliary water pump and elbow of the after cooler. (Zinc Plugs be provided by Firm) | 1020 MISCELLANEOUS g) Zinc Plugs for main engine along with adapters to be replaced. Location of Zinc Plug is elbow of the auxiliary water pump and elbow of the after cooler. (Zinc Plugs be provided by Firm) |
| 584 | 1020EQPT: MISCh) Sea water/ FW suction/ discharge line flanges are corroded. New suitable flanges to be fabricated as per sample. | 1020EQPT: MISCh) Sea water/ FW suction/ discharge line flanges are corroded. New suitable flanges to be fabricated as per sample. |
| 585 | 1020EQPT: MISCj) Chequered plate Chequered plate of engine room are to be painted with Anticorrosive intershield 300. DFT 150 microns | 1020EQPT: MISCj) Chequered plate Chequered plate of engine room are to be painted with Anticorrosive intershield 300. DFT 150 microns |
| 586 | 1020 MISCELLANEOUS k) Firm to supply new Wet and dry dust vacuum cleaner (Industrial type) Make Dewalt, power- 1400 watts,Capacity-36 Ltrs. | 1020 MISCELLANEOUS k) Firm to supply new Wet and dry dust vacuum cleaner (Industrial type) Make Dewalt, power- 1400 watts,Capacity-36 Ltrs. |
| 587 | 1020 MISCELLANEOUS m) Firm to supply and fitment of name tallies for All system valves and filling lines . | 1020 MISCELLANEOUS m) Firm to supply and fitment of name tallies for All system valves and filling lines . |
| 588 | 1020 MISCELLANEOUS n) AC Outdoor unit deteriorated view exposure & weather conditions. Suitable protection cover/box to be fabricated for AC outdoor units. AC outdoor unit supporting stand to be renewed. | 1020 MISCELLANEOUS n) AC Outdoor unit deteriorated view exposure & weather conditions. Suitable protection cover/box to be fabricated for AC outdoor units. AC outdoor unit supporting stand to be renewed. |
| 589 | 1020 MISCELLANEOUS p) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm | 1020 MISCELLANEOUS p) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm |
| 590 | 1020 MISCELLANEOUS q) Coupling Guards for FiFi System gear box pumps to be fabricated fitment to be carried out. Guards to be painted.(Mat : SS ) | 1020 MISCELLANEOUS q) Coupling Guards for FiFi System gear box pumps to be fabricated fitment to be carried out. Guards to be painted.(Mat : SS ) |
| 591 | 1020 MISCELLANEOUS r) Cleaning and painting of Air Intake and exhaust trunking for engine room and SRP compartment to be carried out. Filter/Strainer mesh to be replaced with new. | 1020 MISCELLANEOUS r) Cleaning and painting of Air Intake and exhaust trunking for engine room and SRP compartment to be carried out. Filter/Strainer mesh to be replaced with new. |
| 592 | 1020EQPT: MISCs) Both Main Engines sea water suction line pressure measuring points and pressure gaugesto be provided | 1020EQPT: MISCs) Both Main Engines sea water suction line pressure measuring points and pressure gaugesto be provided |
| 593 | 1020EQPT: MISCt) Complete Cleaning of exhaust system of diesel engines (Main Engine) :- Soot deposited inside and outside exhaust trunking and funnel top area to be cleaned. Engine Exhaust trunking and funnel/funnel area to be completely cleaned internally and externally. Job includes removal of complete lagging , manual internal and external cleaning of exhaust trunking, exhaust drain pipelines, removal of deposited Soot, Exhaust system to be cleaned internally using suitable chemical. Post cleaning of complete exhaust system , survey of exhaust system including silencers , compensators to be carried out | 1020EQPT: MISCt) Complete Cleaning of exhaust system of diesel engines (Main Engine) :- Soot deposited inside and outside exhaust trunking and funnel top area to be cleaned. Engine Exhaust trunking and funnel/funnel area to be completely cleaned internally and externally. Job includes removal of complete lagging , manual internal and external cleaning of exhaust trunking, exhaust drain pipelines, removal of deposited Soot, Exhaust system to be cleaned internally using suitable chemical. Post cleaning of complete exhaust system , survey of exhaust system including silencers , compensators to be carried out |
| 594 | 1020EQPT: MISCu) Renew Exhaust system drain piping. Job includes fitment of suitable connections and ball valve | 1020EQPT: MISCu) Renew Exhaust system drain piping. Job includes fitment of suitable connections and ball valve |
| 595 | 1020EQPT: MISCv) Complete Cleaning of exhaust system of diesel engines (Diesel Generator) :- Soot deposited in exhaust trunking and funnel top area to be cleaned. Engine Exhaust trunking and funnel/funnel area to be completely cleaned internally and externally. Job includes manual internal and external cleaning of exhaust trunking, removal of deposited Soot, Exhaust system to be cleaned internally using suitable chemical. | 1020EQPT: MISCv) Complete Cleaning of exhaust system of diesel engines (Diesel Generator) :- Soot deposited in exhaust trunking and funnel top area to be cleaned. Engine Exhaust trunking and funnel/funnel area to be completely cleaned internally and externally. Job includes manual internal and external cleaning of exhaust trunking, removal of deposited Soot, Exhaust system to be cleaned internally using suitable chemical. |
| 596 | 1020EQPT: MISCw) Damaged/corroded Exhaust system trunking to be replaced with new | 1020EQPT: MISCw) Damaged/corroded Exhaust system trunking to be replaced with new |
| 597 | 1020EQPT: MISCx) Firm to supply new drain valves for exhaust drain pipe line | 1020EQPT: MISCx) Firm to supply new drain valves for exhaust drain pipe line |
| 598 | 1020EQPT: MISCy) DA Exhaust system Compensator to be replaced with new. Firm to supply new compensator | 1020EQPT: MISCy) DA Exhaust system Compensator to be replaced with new. Firm to supply new compensator |
| 599 | 1020EQPT: MISCz) Firm to supply and renew DA Exhaust lagging | 1020EQPT: MISCz) Firm to supply and renew DA Exhaust lagging |
| 600 | 1020EQPT: MISCaa) Firm to supply and renew Main engine Exhaust lagging | 1020EQPT: MISCaa) Firm to supply and renew Main engine Exhaust lagging |
| 601 | 1020EQPT: MISCab) Rack at spare room perished , New racks to be fabricated in spare/ store room as per sample. Sufficient strength to be provided to racks to store heavy spare parts. Three side to be covered and five partitions be provided in each rack. Primer and paint to be applied to racks. Dimensions:- Height: 8feet,Breadth: 3Feet,Width:4 feet, Angle bar : 5mm, Plate Thickness: 2mm | 1020EQPT: MISCab) Rack at spare room perished , New racks to be fabricated in spare/ store room as per sample. Sufficient strength to be provided to racks to store heavy spare parts. Three side to be covered and five partitions be provided in each rack. Primer and paint to be applied to racks. Dimensions:- Height: 8feet,Breadth: 3Feet,Width:4 feet, Angle bar : 5mm, Plate Thickness: 2mm |
| 602 | 1020EQPT: MISCac) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical/Box), ( Strainer thickness up to 4mm, Diameter : 10 inch, height: 20 inch), Mat : Brass | 1020EQPT: MISCac) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical/Box), ( Strainer thickness up to 4mm, Diameter : 10 inch, height: 20 inch), Mat : Brass |
| 603 | 1020EQPT: MISCad) Zinc plug fitting/connection along with adapter on main engine( MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C) cooling pipe system to be replaced. | 1020EQPT: MISCad) Zinc plug fitting/connection along with adapter on main engine( MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C) cooling pipe system to be replaced. |
| 604 | 1020EQPT: MISCae) Zinc Plugs for main engine along with adapters ( MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C)) to be replaced. Location of Zinc Plug is elbow of the auxilary water pump and elbow of the after cooler. | 1020EQPT: MISCae) Zinc Plugs for main engine along with adapters ( MAIN ENGINE,MAKE: CATERPILLAR, MODEL:3512C)) to be replaced. Location of Zinc Plug is elbow of the auxilary water pump and elbow of the after cooler. |
| 605 | 1020EQPT: MISCaf) New Zinc plugs to be provisioned in Voith sea water cooling system. | 1020EQPT: MISCaf) New Zinc plugs to be provisioned in Voith sea water cooling system. |
| 606 | 1020EQPT: MISCag) ) New Zinc plugs to be provisioned in FiFi sea water system. | 1020EQPT: MISCag) ) New Zinc plugs to be provisioned in FiFi sea water system. |
| 607 | 1020EQPT: MISCah) ) New Zinc plugs to be provisioned in Sea water system including pumps and piping.. | 1020EQPT: MISCah) ) New Zinc plugs to be provisioned in Sea water system including pumps and piping.. |
| 608 | 1020 MISCELLANEOUS ak) DA Exhaust lagging to be renewed | 1020 MISCELLANEOUS ak) DA Exhaust lagging to be renewed |
| 609 | 1020 MISCELLANEOUS am) Main engine Exhaust lagging to be renewed | 1020 MISCELLANEOUS am) Main engine Exhaust lagging to be renewed |
| 610 | 1020 MISCELLANEOUS an) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical/Box), Mat : Brass ( thickness up to 4mm, height up to 20 mm) | 1020 MISCELLANEOUS an) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical/Box), Mat : Brass ( thickness up to 4mm, height up to 20 mm) |
| 611 | 1020 MISCELLANEOUS ap) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical), Mat : Brass ( thickness up to 4mm, Diameter up to 10 inch, height up to 18 inch.) | 1020 MISCELLANEOUS ap) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical), Mat : Brass ( thickness up to 4mm, Diameter up to 10 inch, height up to 18 inch.) |
| 612 | 1020 MISCELLANEOUS aq) FIFI system inlet sea water line pressure measuring point and pressure gauge to be provided. (range 0-10bar) | 1020 MISCELLANEOUS aq) FIFI system inlet sea water line pressure measuring point and pressure gauge to be provided. (range 0-10bar) |
| 613 | 1020 MISCELLANEOUS ar) FIFI system outlet sea water line pressure measuring point and pressure gauges to be provided. (range 0-10bar) | 1020 MISCELLANEOUS ar) FIFI system outlet sea water line pressure measuring point and pressure gauges to be provided. (range 0-10bar) |
| 614 | 1020 MISCELLANEOUS as) Both Main Engines sea water suction line pressure measuring points and pressure gauge to be provided | 1020 MISCELLANEOUS as) Both Main Engines sea water suction line pressure measuring points and pressure gauge to be provided |
| 615 | 1020 MISCELLANEOUS at) RU tanks level sight glass tubes to be renewed. Quick closing valve and drain valves for sight glass to be renewed. | 1020 MISCELLANEOUS at) RU tanks level sight glass tubes to be renewed. Quick closing valve and drain valves for sight glass to be renewed. |
| 616 | 1020 MISCELLANEOUS au) Portable pump along with motor ( capacity: 1-2 HP) to be overhauled. and prove for satisfactory operation. Pump end flange connections to be renewed | 1020 MISCELLANEOUS au) Portable pump along with motor ( capacity: 1-2 HP) to be overhauled. and prove for satisfactory operation. Pump end flange connections to be renewed |
| 617 | 1020 MISCELLANEOUS av) Sea water pump housing is perished . Reconditioning of sea water pump housing to be carried out. | 1020 MISCELLANEOUS av) Sea water pump housing is perished . Reconditioning of sea water pump housing to be carried out. |
| 618 | 1020 MISCELLANEOUS aw) Sea water pump shaft is damaged . Reconditioning of sea water pump shaft to be carried out. | 1020 MISCELLANEOUS aw) Sea water pump shaft is damaged . Reconditioning of sea water pump shaft to be carried out. |
| 619 | 1020 MISCELLANEOUS ax) Sea water pump impeller is damaged . Reconditioning of sea water pump impeller to be carried out. | 1020 MISCELLANEOUS ax) Sea water pump impeller is damaged . Reconditioning of sea water pump impeller to be carried out. |
| 620 | 1020 MISCELLANEOUS ay) Reconditioning of pump damaged parts including Shaft & impeller, pump housing to be done. | 1020 MISCELLANEOUS ay) Reconditioning of pump damaged parts including Shaft & impeller, pump housing to be done. |
| 621 | 1020 MISCELLANEOUS az) Firm to supply new valve (Gear operated butterfly valve: Dia 80~100 mm) | 1020 MISCELLANEOUS az) Firm to supply new valve (Gear operated butterfly valve: Dia 80~100 mm) |
| 622 | 1020 MISCELLANEOUS (aaa) Firm to supply and fitment of Air line pressure hoses, Dia -40mm, Length-2 Mtrs | 1020 MISCELLANEOUS (aaa) Firm to supply and fitment of Air line pressure hoses, Dia -40mm, Length-2 Mtrs |
| 623 | 1020 MISCELLANEOUS (aab) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm | 1020 MISCELLANEOUS (aab) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm |
| 624 | 1020 MISCELLANEOUS (aac) Firm to supply O ring for sea water pump (as per sample) | 1020 MISCELLANEOUS (aac) Firm to supply O ring for sea water pump (as per sample) |
| 625 | 1020 MISCELLANEOUS (aad) Firm to supply Mechnical seal for sea water pump (as per sample) | 1020 MISCELLANEOUS (aad) Firm to supply Mechnical seal for sea water pump (as per sample) |
| 626 | 1020 MISCELLANEOUS (aae) Firm to supply durrets as per sample. Dia- 40mm | 1020 MISCELLANEOUS (aae) Firm to supply durrets as per sample. Dia- 40mm |
| 627 | 1030 MISCELLANEOUS (aaf) Quick Shut off valves are not operational. Overhauling of QSV to be undertaken. Wire ropes from engine room to deck to be replaced with new. Repair of defective parts to be undertaken. Cleaning and greasing of all moving parts to be undertaken. Prove the equipment for satisfactory operation | 1030 MISCELLANEOUS (aaf) Quick Shut off valves are not operational. Overhauling of QSV to be undertaken. Wire ropes from engine room to deck to be replaced with new. Repair of defective parts to be undertaken. Cleaning and greasing of all moving parts to be undertaken. Prove the equipment for satisfactory operation |
| 628 | 1030 MISCELLANEOUS (aag) Shaft coupling Guard (Both Main engines to Steering system ) to be replaced with new | 1030 MISCELLANEOUS (aag) Shaft coupling Guard (Both Main engines to Steering system ) to be replaced with new |
| 629 | 1020EQPT: MISCaah) FIFI system gear box oil cooler inlet sea water line pressure measuring point and pressure gauge to be provided. (range 0-10bar) | 1020EQPT: MISCaah) FIFI system gear box oil cooler inlet sea water line pressure measuring point and pressure gauge to be provided. (range 0-10bar) |
| 630 | 1020EQPT: MISCaaj) Voith Lube oil cooler sea water line pressure measuring point and pressure gauges to be provided. (range 0-10bar) | 1020EQPT: MISCaaj) Voith Lube oil cooler sea water line pressure measuring point and pressure gauges to be provided. (range 0-10bar) |
| 631 | 1020EQPT: MISCaak) Main Engines complete body to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Cautions to be taken while cleaning of engine. Sensors and controls not be damaged. | 1020EQPT: MISCaak) Main Engines complete body to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Cautions to be taken while cleaning of engine. Sensors and controls not be damaged. |
| 632 | 1020EQPT: MISCaam) DA Engines complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body.Cautions to be taken while cleaning of engine. Sensors and controls not be damaged. | 1020EQPT: MISCaam) DA Engines complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body.Cautions to be taken while cleaning of engine. Sensors and controls not be damaged. |
| 633 | 1020EQPT: MISCaan) Shafting of turbocoupling to be cleaned. Spray down the entire shaft (from main engine to voith system) with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Grease to be applied to shaft for rust prevention. | 1020EQPT: MISCaan) Shafting of turbocoupling to be cleaned. Spray down the entire shaft (from main engine to voith system) with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Grease to be applied to shaft for rust prevention. |
| 634 | 1020EQPT: MISCaap) Firm to supply SS nut and nolts (as per sample) | 1020EQPT: MISCaap) Firm to supply SS nut and nolts (as per sample) |
| 635 | 1020EQPT: MISCaaq) New Zinc plugs to be provisioned in DG sea water system. | 1020EQPT: MISCaaq) New Zinc plugs to be provisioned in DG sea water system. |
| 636 | 1020EQPT: MISCaar) Firm to provide Sacrificial zinc anode along with brass plug as per sample . Size: ( diameter up to 3 cm, length 5 to 8 cm) | 1020EQPT: MISCaar) Firm to provide Sacrificial zinc anode along with brass plug as per sample . Size: ( diameter up to 3 cm, length 5 to 8 cm) |
| 637 | 1020EQPT: MISCaas) Firm to supply and Main/Aux Sea chest strainers studs/nut and bolts to be replaced with new. Size per sample, Mat : SS | 1020EQPT: MISCaas) Firm to supply and Main/Aux Sea chest strainers studs/nut and bolts to be replaced with new. Size per sample, Mat : SS |
| 638 | 1020EQPT: MISCaat) RU tanks level sight glass tubes to be renewed. Quick closing valve and drain valves for sight glass to be renewed. | 1020EQPT: MISCaat) RU tanks level sight glass tubes to be renewed. Quick closing valve and drain valves for sight glass to be renewed. |
| 639 | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (a) Air Compressor to be overhauled and Prove for Satisfactory Operation | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (a) Air Compressor to be overhauled and Prove for Satisfactory Operation |
| 640 | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (b) Discharge Pump to be overhauled and Prove for Satisfactory Operation. | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (b) Discharge Pump to be overhauled and Prove for Satisfactory Operation. |
| 641 | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (c) Flexible hoses/ Wire breaded hoses to be renewed. | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (c) Flexible hoses/ Wire breaded hoses to be renewed. |
| 642 | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (d) Complete assembly and system pipe to be painted post work completion as per code. | 1021 EQPT/SYSTEM: SEWAGE TREATMENT PLANT MAKE/MODEL: M/S WARTSILA /HAMWORTHY System Ltd.Model: STC 02 (d) Complete assembly and system pipe to be painted post work completion as per code. |
| 643 | 1022 EQPT: CO2 FIRE EXTINGUISHING SYSTEMMAKE: ZEAL Marketing Pvt Ltd, mumbai - 400104. | 1022 EQPT: CO2 FIRE EXTINGUISHING SYSTEMMAKE: ZEAL Marketing Pvt Ltd, mumbai - 400104. |
| 644 | 1022 Eqpt/System: CO2 Existinguishing system (a) All Co2 cylinders to be weighed if wt falls below the 10 % of initial wt, recharge the cylinders wt of the co2 is 45 Kg in each cylinder | 1022 Eqpt/System: CO2 Existinguishing system (a) All Co2 cylinders to be weighed if wt falls below the 10 % of initial wt, recharge the cylinders wt of the co2 is 45 Kg in each cylinder |
| 645 | 1022 Eqpt/System: CO2 Existinguishing system (b) All Co2 discharges multi jet nozzles in engine room to be opened, checked for chokages & cleaned and fitted back. 2.5mm-11 Nos, 2mm-04Nos | 1022 Eqpt/System: CO2 Existinguishing system (b) All Co2 discharges multi jet nozzles in engine room to be opened, checked for chokages & cleaned and fitted back. 2.5mm-11 Nos, 2mm-04Nos |
| 646 | ELECTRICAL WORK PACKAGE The definition of overhaul of motors/alternators includes the following:- (a) Dismantle the motor. The motors/alternators has to be dismantled and landed by Firm for overhauling. (b) Undertake trueness checks of rotors/alternators on the lathe. Repair observed Defects (c) Check for ovality in bearing housing. Repair observed Defects. (d) Clean the rotor and stator thoroughly with alcohol, air, varnish and bake. There should be no dust particles or other foreign particles observed after cleaning(e) Measure the insulation of windings of rotor and stator. In case insulation is below one mega ohm rewind the rotor / stator (f) Replace heater and thermistor units.(g) Assemble the motor with new bearings(h) In case of repairs to shaft trueness or replaced of winding,undertake dynamic balancing of the rotor (j) Check and rectify phase imbalance in insulation of windings(k) Undertake test bed Trials and confirm no load starting and running currents, speed, SPM readings apart from other standard checks. SPM reading are to be in green zone post overhaul. (l) All motors/alternators and machinery body/ cabinets to be painted as per the original colour.(m) Brass Marking talleys to be provided for all equipment( 8x2 cms).(n) Wiring/ cabling which are removed during gutting/ degutting to be re wired whereever applicable. (p) All motors/alternators with monoblock pumps are to be proved in situ. (q) All terminal boxes rubber beading to be replaced to achieve water tight integrity. | ELECTRICAL WORK PACKAGE The definition of overhaul of motors/alternators includes the following:- (a) Dismantle the motor. The motors/alternators has to be dismantled and landed by Firm for overhauling. (b) Undertake trueness checks of rotors/alternators on the lathe. Repair observed Defects (c) Check for ovality in bearing housing. Repair observed Defects. (d) Clean the rotor and stator thoroughly with alcohol, air, varnish and bake. There should be no dust particles or other foreign particles observed after cleaning(e) Measure the insulation of windings of rotor and stator. In case insulation is below one mega ohm rewind the rotor / stator (f) Replace heater and thermistor units.(g) Assemble the motor with new bearings(h) In case of repairs to shaft trueness or replaced of winding,undertake dynamic balancing of the rotor (j) Check and rectify phase imbalance in insulation of windings(k) Undertake test bed Trials and confirm no load starting and running currents, speed, SPM readings apart from other standard checks. SPM reading are to be in green zone post overhaul. (l) All motors/alternators and machinery body/ cabinets to be painted as per the original colour.(m) Brass Marking talleys to be provided for all equipment( 8x2 cms).(n) Wiring/ cabling which are removed during gutting/ degutting to be re wired whereever applicable. (p) All motors/alternators with monoblock pumps are to be proved in situ. (q) All terminal boxes rubber beading to be replaced to achieve water tight integrity. |
| 647 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai | 2001EQUP/SYSTEM: MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai |
| 648 | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(a) De-energise switchboard. Clean and decarbonise the all busbars, insulators, CTs, PTs, junction boxes, switch contact surfaces, fuse bases/carriers and other components. using soft brush/calico cloth dipped in alcohol. | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(a) De-energise switchboard. Clean and decarbonise the all busbars, insulators, CTs, PTs, junction boxes, switch contact surfaces, fuse bases/carriers and other components. using soft brush/calico cloth dipped in alcohol. |
| 649 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(b) Calibration of digital protection display unit SYMAP make: stucke electrical | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(b) Calibration of digital protection display unit SYMAP make: stucke electrical |
| 650 | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(c) Firm to supply & install new digital protection display unit Model SYMAP. Make: Stuckle Germany. Unit to be prove for satisfactory operation | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(c) Firm to supply & install new digital protection display unit Model SYMAP. Make: Stuckle Germany. Unit to be prove for satisfactory operation |
| 651 | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(d) Calibration of meters (fitted in MSB) to be carried out. Callibration certificates to be rendered. | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(d) Calibration of meters (fitted in MSB) to be carried out. Callibration certificates to be rendered. |
| 652 | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(e) Firm to supply and install meter . Prove for satisfactory operation. Digital KW Meters 0 to 200KW | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(e) Firm to supply and install meter . Prove for satisfactory operation. Digital KW Meters 0 to 200KW |
| 653 | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(f) Firm to supply and renew LED bulbs 230V,20W pin type (BC Type) | 2001MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai(f) Firm to supply and renew LED bulbs 230V,20W pin type (BC Type) |
| 654 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(g) Firm to supply and renew of indication lamps | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(g) Firm to supply and renew of indication lamps |
| 655 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(h) Firm to supply and install meter . Prove for satisfactory operation. Voltmeters (0-500V) | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(h) Firm to supply and install meter . Prove for satisfactory operation. Voltmeters (0-500V) |
| 656 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(j) Firm to supply and install meter . Prove for satisfactory operation. Ampere meters (0-100A) | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(j) Firm to supply and install meter . Prove for satisfactory operation. Ampere meters (0-100A) |
| 657 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(k) Firm to supply and renew panel door locks along with keys | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(k) Firm to supply and renew panel door locks along with keys |
| 658 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(m) Firm to supply and install meter . Prove for satisfactory operation. Insulation monitoring meter | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(m) Firm to supply and install meter . Prove for satisfactory operation. Insulation monitoring meter |
| 659 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(n) Firm to supply and install Power Factor meter . Prove for satisfactory operation. | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(n) Firm to supply and install Power Factor meter . Prove for satisfactory operation. |
| 660 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(p) Callibration of MCCB's to be carried out. | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(p) Callibration of MCCB's to be carried out. |
| 661 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(q) Firm to supply and install MCCB with full assembly . Prove for satisfactory operation. MCCB 160 Amps | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(q) Firm to supply and install MCCB with full assembly . Prove for satisfactory operation. MCCB 160 Amps |
| 662 | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(r) Firm to supply and install Cam Rotor Switches . Prove for satisfactory operation. Switch ratings 6 amps | 2001EQUP/SYSTEM: MAIN SWITCH BOARD(r) Firm to supply and install Cam Rotor Switches . Prove for satisfactory operation. Switch ratings 6 amps |
| 663 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) |
| 664 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (a) Carry out overhauling of DA control panel along with calibration of all sensors fitted to DA's,Gauges,converting modules,check circuit functionality. Renewal of indication lamps to be carried out. Equipments Callibration reports to be rendered. | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (a) Carry out overhauling of DA control panel along with calibration of all sensors fitted to DA's,Gauges,converting modules,check circuit functionality. Renewal of indication lamps to be carried out. Equipments Callibration reports to be rendered. |
| 665 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (b) Firm to supply and renew Lube oil pressure sensor | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (b) Firm to supply and renew Lube oil pressure sensor |
| 666 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (c) Firm to supply and renew Fresh water/coolant temperature sensors | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (c) Firm to supply and renew Fresh water/coolant temperature sensors |
| 667 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (d) Firm to supply and renew Lube oil temperature sensors | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (d) Firm to supply and renew Lube oil temperature sensors |
| 668 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (e) Firm to supply and renew Coolant level sensor | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (e) Firm to supply and renew Coolant level sensor |
| 669 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (f) Firm to supply and renew Engine Speed / RPM Sensor | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (f) Firm to supply and renew Engine Speed / RPM Sensor |
| 670 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (g) Firm to supply and renew Sea water pressure sensor | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (g) Firm to supply and renew Sea water pressure sensor |
| 671 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (h) Firm to supply and renew Exaust gas temperature sensor | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (h) Firm to supply and renew Exaust gas temperature sensor |
| 672 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (j) Firm to supply and renew Engine Speed/RPM meter 0-2000RPM | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (j) Firm to supply and renew Engine Speed/RPM meter 0-2000RPM |
| 673 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (k) Safety device checks for DG set to be proved for satisfactory performance. | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (k) Safety device checks for DG set to be proved for satisfactory performance. |
| 674 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (l) Firm to supply and renew magnetic switches 24V DC for self starter circuit | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (l) Firm to supply and renew magnetic switches 24V DC for self starter circuit |
| 675 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (m) Overhauling of the self starters 24V DC to be carried out | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (m) Overhauling of the self starters 24V DC to be carried out |
| 676 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (n) Overhauling of the self starters 12V DC to be carried out | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (n) Overhauling of the self starters 12V DC to be carried out |
| 677 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) DA Starting control pannel(p) Clean & Tighten the all connections with proper lugs, ferrules & connectors | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) DA Starting control pannel(p) Clean & Tighten the all connections with proper lugs, ferrules & connectors |
| 678 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(q) Firm to supply and renew speed control unit for ESD5200 series | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(q) Firm to supply and renew speed control unit for ESD5200 series |
| 679 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(r) Firm to supply and renew generator engine protection display unit | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(r) Firm to supply and renew generator engine protection display unit |
| 680 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(s) Firm to supply and renew self starters 24V DC for DA | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(s) Firm to supply and renew self starters 24V DC for DA |
| 681 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(t) Firm to supply and renew dynamos 24V DC for DA | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(t) Firm to supply and renew dynamos 24V DC for DA |
| 682 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(u) Firm to supply and renew self starters 12V DC for KOEL engine | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(u) Firm to supply and renew self starters 12V DC for KOEL engine |
| 683 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(v) Firm to supply and renew dynamos 12V DC for KOEL engine | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(v) Firm to supply and renew dynamos 12V DC for KOEL engine |
| 684 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (w) Overhauling of the Dynamo 24V DC to be carried out | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (w) Overhauling of the Dynamo 24V DC to be carried out |
| 685 | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (x) Overhauling of the Dynamo 12V DC to be carried out | 2002 Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) (x) Overhauling of the Dynamo 12V DC to be carried out |
| 686 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(y) Firm to supply and renew 12V 7AH Batteries for KOEL engine | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(y) Firm to supply and renew 12V 7AH Batteries for KOEL engine |
| 687 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(z) Firm to supply and renew battery charger of DA control panel for KOEL engine | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(z) Firm to supply and renew battery charger of DA control panel for KOEL engine |
| 688 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(aa) Firm to supply and install DC Voltmeter . Prove for satisfactory operation. Voltmeter 0-50V | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(aa) Firm to supply and install DC Voltmeter . Prove for satisfactory operation. Voltmeter 0-50V |
| 689 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(ab) Callibration of DC Voltmeter to be carried out. | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(ab) Callibration of DC Voltmeter to be carried out. |
| 690 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(ac) Callibration of DC Ammeter to be carried out. | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(ac) Callibration of DC Ammeter to be carried out. |
| 691 | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(ad) Firm to supply and install DC Ammeter . Prove for satisfactory operation. Voltmeter 0-25 A | 2002Eqpt/System:DG Engine (Make:KOEL;MODEL:6R1080T) starting control pannel(ad) Firm to supply and install DC Ammeter . Prove for satisfactory operation. Voltmeter 0-25 A |
| 692 | 2002EQPT:HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 Tae) Firm to Supply Starter and fitment to be carried out . DA Starter 12V, 2 wire system Patt no. 4H.466.09.0.00 | 2002EQPT:HARBOUR DIESEL GENERATOR,MAKE: M/s KOEL ,MODEL: 4R1040 Tae) Firm to Supply Starter and fitment to be carried out . DA Starter 12V, 2 wire system Patt no. 4H.466.09.0.00 |
| 693 | 2003 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,50Hz,1500RPM, Qty- 02 Nos (100KVA) and 01 No (50 KVA) | 2003 Eqpt/System: Generators/Alternator Make:Stamford,415V,3Ph,50Hz,1500RPM, Qty- 02 Nos (100KVA) and 01 No (50 KVA) |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail