Tender For Overhauling Of Different Types Of Couplers (Front Automatic Coupler & Intermediate Automatic Coupler) Of Rs-10 Dmrc Trains For Kalindi Kunj Depot, Mukundpur Depot, Vinod Nagar Depot & Najafgarh Depot.
Tender Overview
Project Description
Tender for Overhauling Of Different Types Of Couplers (Front Automatic Coupler & Intermediate Automatic Coupler) Of Rs-10 Dmrc Trains For Kalindi Kunj Depot, Mukundpur Depot, Vinod Nagar Depot & Najafgarh Depot.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Jul-2026 | Addendum-01 | Date | 20-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Schedule A |
| 2 | Schedule B |
| 3 | Schedule C |
| 4 | Schedule D Please Enable Macros to View BoQ information DMRC/RS/KKD-14 Preamble |
| 5 | The bill Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to tenderers, General and Special Conditions of Contract, Employers Requirements and other relevant documents |
| 6 | Overhauling of Intermediate and Front automatic couplers fitted in RS10 Stock as per BOQ1 Scheduled A,B,C & D accordingly. |
| 7 | Tenderers shall quote their offer in Indian Rupees (₹) only. Tenderers are required to quote percentage (%) (Excess/Less) in figures in the appropriate highlighted cells in Excel sheet namely 'BoQ1' against given schedules. |
| 8 | Bill of Quantities comprises of items/works to be executed as per Employer’s Requirements. |
| 9 | If the tenderer fails to quote percentage against BOQ item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 10 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 11 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://eprocure.gov.in/eprocure/app. The rates/ percentages shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote percentage in figures against BOQ amount in the appropriate highlighted cells in Excel sheet namely \\"BoQ1\\". After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 12 | The work executed against all the BOQ as detailed in tender document would be paid as per clause 12 of Special Conditions of Contract (SCC). Contract No. DMRC/RS/KKD-14: Overhauling of different Types of Couplers (Front Automatic Coupler & Intermediate Automatic Coupler) of RS-10 DMRC Trains for Kalindi Kunj Depot, Mukundpur Depot, Vinod Nagar Depot & Najafgarh Depot. BOQ Summary Sheet S. No. Description of work Qty(in No.) Rate Qouted by M/s Voith(For Originally Proposed Work) Rate Qouted by M/s Dellner(For Originally Proposed Work) DMRC rates after revision of Work Unit Rates including GST Total Amount including GST Remarks (In Rs.) (In Rs.) (In Rs.) (In Rs.) (In Rs.) A LABOUR CHARGES (HSN/SAC Code 998714): i Labour charges for overhauling of Front Automatic Coupler towards Stripping, Cleaning, inspection and re-assembly 168.0 45750.0 90000.0 30904.0 68973.36 11587524.48 ii Labour charges for overhauling of Intermediate Automatic Coupler towards Stripping, Cleaning, inspection and re-assembly 168.0 50750.0 100000.0 53192.0 87307.02 14667579.36 Total Labour Cost with GST (In Rs.) 26255103.84 B COST OF MANDATORY COMPONENT KITS (HSN/SAC Code 86073090): i Cost of all mandatory components, consumables (i.e. grease, paint, primer, cable tie.) etc of Front Automatic Coupler. 168.0 131222.5 150000.0 47902.5 247162.0 41523216.0 Refer Annexure-A ii Cost of all mandatory components, consumables (i.e. grease, paint, primer, cable tie) etc of Intermediate Automatic Coupler. 168.0 208518.75 200000.0 188223.75 435459.15 73157137.2 Refer Annexure-B Total Mandatory Component kit Cost with GST (In Rs.) 114680353.2 C TRANSPORTATION COST (HSN/SAC Code 996519): i Transportation Charges from Respective Depot of DMRC to Contractor Service Centre & back to Respective Depot of DMRC 336.0 4000.0 5000.0 11800.0 3964800.0 Total Transportation cost with GST (In Rs.) 3964800.0 D Cost of Non Mandatory Spares inclusive of all taxes 25077700.0 Refer Annexure-C Total overhauling cost inclusive of Non mandatory Parts (1+2+3+4) (in INR) 169977957.04 Annexure-A Kit for Front Automatic Coupler Sl. No. System Description Part No. Qty./Kit Unit Rate (in Rs.) With GST Total Amount (With GST) In Rs. |
| 13 | Coupler Head |
| 14 | Coupling Link With Bushes |
| 15 | Coupler Head casing |
| 16 | Uncoupling Cylinder |
| 17 | Air Pipe Connection with Valve for BP |
| 18 | Air Pipe Connection for MRP |
| 19 | Coupler Shank |
| 20 | Bearing Bracket |
| 21 | Centring Device |
| 22 | Pneumatic Components |
| 23 | Muff Coupling |
| 24 | Earthing System |
| 25 | Electrical Unit of the Coupler Head |
| 26 | Total Cost (With GST) in Rs. 247162.0 Annexure- B Kit for Intermediate Automatic Coupler Sl. No. System Description Part No. Qty./Kit Unit Rate (in Rs.) With GST Total Amount (With GST) in Rs. |
| 27 | Coupler Head |
| 28 | Coupling Link With Bushes |
| 29 | Coupler Head casing |
| 30 | Uncoupling Cylinder |
| 31 | Air Pipe Connection with Valve for BP |
| 32 | Air Pipe Connection for MRP |
| 33 | Coupler Shank |
| 34 | Bearing Bracket |
| 35 | Centring Device |
| 36 | Pneumatic Components |
| 37 | Muff Coupling |
| 38 | Earthing System |
| 39 | Electrical head operating gear |
| 40 | Electric head |
| 41 | Cover |
| 42 | Electrical Unit of the Coupler Head |
| 43 | Total Cost (With GST) in Rs. 435459.15 Annexure-C Non Mandatory Spares of FAC AND IAC S No. System Description Part No. Qty./Kit Unit Rate (in Rs.) With GST Total Amount (With GST) In Rs. |
| 44 | Coupler Head |
| 45 | Uncoupling Cylinder |
| 46 | Air Pipe Connection with Valve for BP |
| 47 | Air Pipe Connection for MRP |
| 48 | Coupler Shank |
| 49 | Bearing Bracket |
| 50 | Centring Device |
| 51 | Pneumatic Components |
| 52 | Electrical unit of the coupler head |
| 53 | Earthing System |
| 54 | Electrical head operating gear |
| 55 | Electric head |
| 56 | Suspension |
| 57 | Total Cost of Non Mandatory Spares (With GST) in Rs. 25077700.0 DMRC/RS/KKD-14 APPENDIX-3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendixe, it will have no effect. Signature of authorized signatory On behalf of Tenderer |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 14 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender