| 1 | Installation of 150 mm dia size DTW by Rotary of 100 m Depth. |
| 2 | Supplying , Installation, testing and commissioning raw water- Pumpset 5 HP -submerssible pump set. |
| 3 | Supplying , fitting, fixing, testing and commissioning raw water pumping main 80mm dia GI pipe -15.00 RM Length |
| 4 | Construction of gravity type Rapid sand filter of size 4 sqm/6sqm |
| 5 | Supplying, fitting, fixing of internal connection between TP & UGR including labour charge and materials… |
| 6 | Supplying, fitting, fixing MS flat, bolt and nut including painting and red plant one coat complete as directed. |
| 7 | Raising low site around the treatment plant site with approved soil obtained from outside by truck carriage incl. breaking clods, dressing etc., |
| 8 | Construction, testing and commissioning of under ground service reservoir of capacity 30000 Ltr 8.00 ton/sqm |
| 9 | Construction of pump house of size 3.00 m x 4.00 m x 3.30 m at Head Works. |
| 10 | Supplying, installation, testing and commissioning of Centrifugal pump set of different capacity at various PWSS… 5 HP - Centrifugal type pumpset (1+1) stand by |
| 11 | Supplying fitting fixing, testing and commissioning of clear water - pumping main 80 MM dia GI pipe- 15 M Length. |
| 12 | Construction, testing and commissioning of RCC elevated service Reservoir 40000 Ltrs - 8 ton/sqm capacity. |
| 13 | Supplying fitting & fixing of Bulk Flow Meter conforming to ISO:4064/1 |
| 14 | Supplying, installation, testing of electrically operated chemical dosing pump. |
| 15 | Estimate for soil survey along with soil testing for construction of ESR at Pipe Water Supply Scheme. |
| 16 | Construction of full brick boundary wall including double leaf heavy duty iron gate of length 21.5 M & breadth of 20.0 M. |
| 17 | Distribution Network : Supplying fitting fixing, testing and commissioning of distribution system of length 3.16 KM. 63 mm dia HDPE |
| 18 | 75 mm dia HDPE |
| 19 | 90 mm dia HDPE |
| 20 | 110 mm dia HDPE |
| 21 | 125 mm dia HDPE |
| 22 | Construction of Brick masonry Sluice Valve Chamber 750mm(L) x 750mm(B) x 1250mm(H) inside, in 230mm brick work in cement mortar 1:5.. A) For 80mm dia Sluice Valve against 90mm/ 75mm dia distribution pipe line. |
| 23 | Construction of Brick masonry Sluice Valve Chamber 900mm(L) x 900mm(B) x 1250mm(H) inside, in 230mm brick work in cement mortar 1:5.. A) For 100mm dia Sluice Valve against 140mm dia distribution pipe line. |
| 24 | B) For 125mm dia Sluice Valve against 110mm dia distribution pipe line. |
| 25 | Construction of RCC Supporting pillar to be used as support of pipeline for crossing of culverts etc., |
| 26 | Labour charge for making bore hole horizontally across road or embankment for crossing distribution pipeline.. 1). 80 mm dia boring for 65 mm dia pipe. |
| 27 | 2). 100 mm dia boring for 80 mm dia pipe.. |
| 28 | 3). 125 mm dia boring for 100 mm dia pipe. |
| 29 | Supplying fitting fixing, testing and commissioning of 165 Nos Functional Household Tap connection and 0 Nos public sector connection for FHTC. |
| 30 | Construction of internal Electrification to pump house & campus lighting. |
| 31 | Construction of Approach road at TP site -10 M |
| 32 | Providing brick soling in foundation & under floor with stone/best quality picket jhama bricks, sand packed and laid to level with PCC. |
| 33 | Power connection for piped Water Supply Scheme. Please Enable Macros to View BoQ information |