Tender For E-Tender Enquiry No. 01 /Se/Mhp/2026-27/P-428 Dated 08/06/2026 For Outsourcing The Work Of Routine & Preventive Maintenance, Breakdown Maintenance And Annual Overhauling Of Generating Units, Switchyards And Other Allied Equipment Through C, Talwara-Punjab
TDR : 55925486
Tender Notice
BOQ
31 Days Left
Talwara
Punjab
Tender For E-Tender Enquiry No. 01 /Se/Mhp/2026-27/P-428 Dated 08/06/2026 For Outsourcing The Work Of Routine & Preventive Maintenance, Breakdown Maintenance And Annual Overhauling Of Generating Units, Switchyards And Other Allied Equipment Through C
Name of Work:- E-TENDER ENQUIRY No. 01 /SE/MHP/2026-27/P-428 dated 08/06/2026 for outsourcing the work of Routine & Preventive Maintenance, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards and other allied equipment through contractor at Power House No.- 1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb).
Sl. No.
Item Description
1
Outsourcing the work of Routine & Preventive Maintenance, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards and other allied equipment through contractor at Power House No.- 1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara
2
Lump-sum rates for Routine, Preventive Maintenances, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards, Bays and other allied equipment at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. (Refer Note-1 below & DNIT Clause No.1.7 of section-I)
3
Lump-sum monthly rates for deployment of additional manpower by contractor for 60 Days during annual shutdown period (tentatively between March to May) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-4) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, Talwara. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-2 below & DNIT Clause No.1.7of section-I)
4
Lump-sum monthly rates for providing assistance for 90 Days during rainy season (tentatively between June to Sept) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-5) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-3&4 below & DNIT Clause No.1.7of section-I) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.