|
| 1 | Material Part of S/Stn (TS No. 120/2025-26 WBS No. 32100319-001-BLP-S/S-005 |
| 2 | Muff with concerete filling |
| 3 | X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos] |
| 4 | M S Angle Iron.(50x50x6mm) Length 2800 mmx(1 No) For LA |
| 5 | X-arm [ Chhanel iron (75x40x6mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 6 | X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos] |
| 7 | X-arm [ Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of Transformer] |
| 8 | M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 9 | M S Angle Iron (35x35x6mm)Length 460mm x 2 Nos |
| 10 | M S Angle Iron (50x50x6mm) Length 950 mm x 2 Nos |
| 11 | M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 12 | M S Angle Iron (50x50x6mm) Length 450 mm x 1Nos |
| 13 | GO switch handle supporing M S Channel Iron (75x40x6mm) Length 460 mm x 1Nos |
| 14 | D.O fuse unit |
| 15 | Surge Arrester 9 KV Station class (Porcelain) |
| 16 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: (Porcelain, BS, 12 kV, 90kN) including Straight stapples & Bend Stapples etc.) |
| 17 | Stay set comp. |
| 18 | Pipe Earthing set . |
| 19 | Half clamp (M.S. Flat 50x6mm) |
| 20 | Full clamp (M.S. Flat 50x6mm) |
| 21 | M.S. Nuts & Bolts of various sizes (Galvanised/Coated) [Preferably 16 mm phase or more (with flat and spring washers)] |
| 22 | Prov. Aluminium Thimble 95 mm² |
| 23 | Prov. copper Thimble 200 Amp |
| 24 | Danger plate |
| 25 | Barbed Wire |
| 26 | L.T. Cable 3.5 Core70 mm2 (1.1 kV XLPE CableUnarmoured) |
| 27 | Energy meter (3-p 4-wire) DLMS Compliant 100A CT Type for 11/0.4 KV ,63 KVA Transformer. |
| 28 | Aluminium Paint |
| 29 | Red oxide |
| 30 | Material Part of HT Line (TS No. 121/2025-26 WBS No. 32100319-001-BLP-HT-003) |
| 31 | Prov. RCC Muff with concerete filling |
| 32 | Discs insulator sets on Dead & structures (comprising 1No. Disc: (Porcelain, BS, 2 kV, 90kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) |
| 33 | Prov. CI X arm (100x50x6mm) length 2400mm |
| 34 | Prov. CI X arm (100x50x6mm) length 1800mm |
| 35 | Prov. CI X arm (75x40x6mm) length 2400mm |
| 36 | Prov. AI knee bracing set 2(50x50x6mm) length 750mm |
| 37 | Prov. AI X-Bracing Set - MS Angle Iron: 65x65x6,(2125*2) |
| 38 | Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(1800*2) |
| 39 | Prov. AI knee bracing set (50x50x6mm) length 450mm for supproting the GO switch handle |
| 40 | Prov. Stay set H.T. comp. |
| 41 | Prov. Earthing set complete |
| 42 | Prov.Full Clamps |
| 43 | Prov. Half Clamps |
| 44 | Prov.Top Clamps |
| 45 | Earth hook bolt |
| 46 | Prov. Danger plate |
| 47 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 48 | Prov. Barbed wire |
| 49 | Red oxide |
| 50 | Prov. Aluminium paint |
| 51 | Material Part of LT Line (TS No. 122/2025-26 WBS No. 32100319-001-BLP-LT-003) |
| 52 | Prov. RCC Muff with concerete filling |
| 53 | Shackle insulator |
| 54 | D-iron |
| 55 | Prov. L.T. Stay set Complete |
| 56 | Prov. LT stay clamp |
| 57 | Earth hook |
| 58 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 59 | Prov. Red oxide |
| 60 | Prov. Aluminium Paint |
| 61 | Spiral PVC Spacer |
| 62 | L.T. Cable 3.5 Core70 mm2 (1.1 kV XLPE Cable Unarmoured) |
| 63 | Erection Part of S/Stn (TS No. 120/2025-26 WBS No. 32100319-001-BLP-S/S-005 |
| 64 | Erection of Sub-Station structure, muff with C.C. muffing 1:2:4 ratio, C.I. X-arms 4 Nos size 2800*100*50mm for top fitting and Trans base main channel, 2 Nos CI-X-arm 460*100*50mm for supporting and GO switch handle, 4 Nos AI-X-arm 2800*75*40mm for GO switch and DO Fuse unit, A.I.-X-arms 2800*50*50mm 2 Nos for Trans belting and 2 Nos for LT panel box etc, AI 460*35*35mm for bracing of Trans bed, Strain Insulators,Pin Insulator,bend stepple, ball cleave eye socket, D.O. fuse unit, full and half clamps, MS nuts and bolts off sizes, barbed wire Erection of 63 KVA, 11/0.4 KV transformer, Poles, MCCB for 100 KVA s/Stn, LT cable 3.5 core 70 mm, stay set ,stay wire, G.O Switch,discs Insulator,LA's, S/stn earthing, danger plate,energy meter and Allu paint to all metal parts, jumpering etc.complete in all respect. |
| 65 | Manual carriage for above material (Av. Lead 0.050 Km.) |
| 66 | Erection Part of HT Line (TS No. 121/2025-26 WBS No. 32100319-001-BLP-HT-003) |
| 67 | Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for Single pole structure , drilling of holes in pole , pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 68 | Erection of ST pole 11/9 mtr ,muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 2400*100*50mm /1500*100*50mm for Double pole structure , drilling of holes in pole and -X-arm etc, disc insulators with complete fitting, pin insulator with pin, AI -X- bracing set, barbed wire, danger plate, MS Full and half clamps, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 69 | Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 70 | Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect. |
| 71 | Erection ACSR 6/13.35 i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. |
| 72 | Erection Charges for G.O Switch |
| 73 | Fixing of jumpers |
| 74 | Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect. |
| 75 | Manual carriage for above material (Av. Lead 0.100 Km.) |
| 76 | Erection Part of LT Line (TS No. 122/2025-26 WBS No. 32100319-001-BLP-LT-003) |
| 77 | Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect |
| 78 | Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20*.80*.1.50 mtr, filling and ramming of pit complete in all respect |
| 79 | Erection AAAC 7/3.15 (50mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. (Single Conductor P/kM) |
| 80 | Erection of LT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 81 | Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect. |
| 82 | Manual carriage for above material (Av. Lead 0.100 Km.) Please Enable Macros to View BoQ information |