| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 3 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 4 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 5 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 6 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 7 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 8 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 9 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 10 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 11 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 12 | Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 13 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 14 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 15 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials. |
| 16 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 17 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 18 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 19 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 20 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 21 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. |
| 22 | Custom Labour for transporting single pole by hired vehicle to a distance up to 5 km excluding loading & unloading charges. |
| 23 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 24 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 25 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 26 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 27 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 28 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 29 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 30 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 31 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 32 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 33 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 34 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 35 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 36 | Providing bridging at Cut points for 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors |
| 37 | Erection of suspension clamp for LT ABC of any size |
| 38 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 39 | Dismantling of Anchor clamp / dead end clamp for LT AB cable |
| 40 | Dismantling of suspension clamp suitable for LT AB cable |
| 41 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 42 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 43 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 44 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 45 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 46 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 47 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 48 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 49 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 50 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 51 | Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 52 | Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). |
| 53 | Loading HT A type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). |
| 54 | Loading HT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). |
| 55 | Transporting one HT PSC pole by Hand cart - normally limited to 4km (excluding loading and unloading). |
| 56 | Transporting A type pole of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading). |
| 57 | Transporting one HT TW/RSJ/Rail pole by Hand cart - normally limited to 4km (excluding loading and unloading) |
| 58 | Transporting one HT PSC pole by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). |
| 59 | Transporting A type pole of all sizes by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). Please Enable Macros to View BoQ information |