| 1 | Clearing Shrub jungles including uprooting stumps of trees below 1m gearth and small bushes including removing the debris clear of the worksite including taxes ,cess,all labour and T&P with all leads, lifts, delifts etc complete as per specification & direction of the Engineer-In-charge. |
| 2 | Earthwork in excavation of foundation in all kinds of soil with all leads ,lifts and delifts including rough dressing & leveling the bed and depositing the excavated materials away from the work site including breaking the clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.30m in depth with all labour, T&P & cess etc complete as per the specification & direction of Engineer-in-charge. |
| 3 | Filling in foundation and plinth with sand watered and rammed with all lead, lift and de-lifts etc including cost conveyance ,royalty & all taxes of materials etc. complete as per the direction of the Engineer-in-charge |
| 4 | Providing cement concrete of M-15 grade using 40mm & down graded with crushed granite coarse aggregate from approved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials with all leads, lifts, delifts including watering and curing , labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. |
| 5 | Supplying approved quality of laterite moorum & coarse sand, conveying to the work site, admixing the both in 50 (moorum) : 50 (sand) proportion for cohesive non-swelling soil (CNS) filling and laying the admixture in layers not exceeding 225 mm in thickness by motor grader & tractor-rotavator, watering and compacting to the required density in O.M.C. with vibratory roller including cost, conveyance & royalty of all materials, labour charges, cess, tools & plants, hire & runing charges of all machineries, taxes (Excluding GST), rehandling of materials, if required, with all lead, lifts & de-lifts, all costs incidental to the work etc; complete as per specfication and direction of Engineer-in-Charge. |
| 6 | Providing cement concrete of M-15 grade using 20mm & down graded with crushed granite coarse aggregate from approved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials with all leads, lifts, delifts including watering and curing , labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. |
| 7 | Providing PCC work of M-20 grade with 20mm and down graded with crushed granite coarse aggregate from approved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials with all leads, lifts, delifts including watering and curing , labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. |
| 8 | Supplying, laying & Fixing in position of RCC Spun pipes NP3 (100mm) with collar jointed with C.M (1:3) complete with all cost, conveyance, taxes of all materials, all labour , T&P, cess with all leads, lifts , delifts etc complete as per specification & as directed by the Engineer-In-charge. |
| 9 | Rigid & smooth centering & shuttering for R.C.C/P.C.C works including false work and dismantling them after specified period of casting including removing the debries clear & away from work site including cost of all materials, conveyance, all taxes with all leads, lifts & delifts, labour charges, labour cess, all T&P materials and all costs incidental to the work etc complete as per specification & direction of the Engineer -In- charge. |
| 10 | Filling in foundation and plinth with previous excavated earth in layers not exceeding 22.5 cm thick including watering and ramming with all lead, lift and de-lifts etc. complete as per the direction of the Engineer-in-charge Please Enable Macros to View BoQ information |