| 1 | Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials, up to a lead of 1000 mtr. Including removal & disposal of top organic soil not exceeding 150mm in thickness etc. Complete as per direction of Engineer-in-Charge. (Premeasurement to be recorded prior to execution) |
| 2 | Earth work in excavation in all kinds of soil by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if required etc. Complete as per direction of Engineer-In-Charge |
| 3 | Collecting, supplying and stacking good quality Moorum & sand in regular box heaps of size 1.50mx 1.50m x 0.50m to be measured as one cum and admixing moorum and sand in 60:40 proportion and laying in sub base in layers to the required thickness with all leads, lifts and delifts including cost, conveyance, royality and taxes of all materials etc. with all labour and hire charges of T&P materials required for the work, watering and compacting to the required density in OMC condition with PRR including hire and running charges of machineries etc. Complete asper direction of Engineer-in-Charge. |
| 4 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. |
| 5 | Cement concrete M-20 using 20mm size & downgraded hard crusher broken granite chips from approved quarry for road work free from weathered skin surface, dust and all other deleterious materials including cost, carriage, royalty and taxes of materials to the site of work and mixing by mechanical means with hoisting, laying concrete in position and compacting by plate vibrator including curing upto required period etc. Complete as per direction of Engineer-in-Charge. |
| 6 | Collecting, supplying of good quality platerite moorum in regular box heaps of size 1.50mx 1.50m x 0.50m to be measured as one cum and laying on road surface in layers to the required thickness with all leads, lifts and delifts including cost, conveyance, royalty and taxes of all materials and labour including watering and consolidated with PRR with hire and running charges of all machineries etc. Complete as per direction of Engineer-in-Charge. |
| 7 | Earth work in excavation of any suitable types of soil in approved borrow area by mechanical means and unloading the soil within initial lead of 5.00 Km. on properly prepared and scientifically approved surface of emabankment in proper profiles including rough dressing and breaking clods to maximum 5cm to 7cm size including removal of roots, bushes and other deleterious materials from transported earth with all cost, carriage, royalty, labour, welfarecess and laying in layers not exceeding 22.50cm in depth including watering of earth work upto OMC condition @ 95% dry density by suitabe compacting equipment including construction of haul road, cost of hire and running charges of all the machineries, T & P, cost of fuel, lubricants, cost of labour, carriage, royalty, taxes, cess etc. Complete as per specification and direction of the Engineer-in-charge. (Measurement will be taken on finished compacted level section under OMC condition and earth to be arranged by the contractor at his own cost and responsibility) Please Enable Macros to View BoQ information |