| 1 | Dismentalling of RCC including removal of debris within initial lead and lift etc complete |
| 2 | Eathwork in excavation in hard soil for foundation trenches including levelling and dressing the bed etc complete |
| 3 | Dismentalling of CC including removal of debris within initial lead and lift etc complete |
| 4 | Dismentalling of Brick masonary in cm including removal of debris within initial lead and lift etc complete |
| 5 | Supplying and filling Foundation and Plinth with sand including watering and ramming with cost,conveyance,royalities of sand etc complete. |
| 6 | Providing Cement Concrete (1:3:6) using 40mm size BHGCB Metal including cost,conveyance,royalities of all the materials with watering,curing etc complete. |
| 7 | R.C.C. work in M-25 using 20mm and down graded BHGCB chips including hoisting & laying the concrete, watering and curing etc. to required levels laid in layers including cost, conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour complete but excluding the cost & conveyance & labour charge for cutting , bending, binding etc. of M.S./ T.S. rod required for the RCC Items . |
| 8 | Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tying the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge |
| 9 | Rigid and smooth Centering and shuttering including dismentalling the false work after casting etc complete. A. vertical walls |
| 10 | Rigid and smooth Centering and shuttering including dismentalling the false work after casting etc complete. b. coverslabs |
| 11 | Fly-ash Brick masonary in C.M (1:6) in Super Structure |
| 12 | 12mm thick Cement Plaster in C.M(1:6) |
| 13 | 16mm thick Cement Plaster in C.M(1:6) |
| 14 | Weather coat two coats over a coat of primer |
| 15 | Engagement of 5hp diesel pump set for dewatering of drain |
| 16 | Disposal of excavated earth by truck load within 5km lead to outside of Municipality area including loading and unloading etc complete |
| 17 | Display Board and photographs Please Enable Macros to View BoQ information |