Name of Work:- Improvement to road on Bhailipur right flood embankment from RD 3.350Km. to 4.350Km
Sl. No.
Item Description
1
Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of servicible materials to be used for auctioned, up to a lead of 1000 mtr. Including revoval & disposal of top organic soil not exceeding 150mm in thickness etc. Complete as per direction of Engineer-in-Charge. (Premeasurement to be recorded prior to execution)
2
Collecting, supplying and stacking good quality Moorum & sand in regular box heaps of size 1.50mx 1.50m x 0.50m to be measured as one cum and admixing moorum and sand in 60:40 proportion and laying in sub base in layers to the required thickness with all leads, lifts and delifts including cost, conveyance, royality and taxes of all materials etc. with all labour and hire charges of T&P materials required for the work, watering and compacting to the required density in OMC condition with PRR including hire and running charges of machineries etc. Complete asper direction of Engineer-in-Charge.
3
Earth work in excavation of any suitable types of soil in approved borrow area by mechanical means and unloading the soil within initial lead of 5.00 Km. on properly prepared and scientifically approved surface of emabankment in proper profiles including rough dressing and breaking clods to maximum 5cm to 7cm size including removal of roots, bushes and other deleterious materials from transported earth with all cost, carriage, royalty, labour, welfarecess and laying in layers not exceeding 22.50cm in depth including watering of earth work upto OMC condition @ 95% dry density by suitabe compacting equipment including construction of haul road, cost of hire and running charges of all the machineries, T & P, cost of fuel, lubricants, cost of labour, carriage, royalty, taxes, cess etc. Complete as per specification and direction of the Engineer-in-charge. (Measurement will be taken on finished compacted level section under OMC condition and earth to be arranged by the contractor at his own cost and responsibility) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.