Name of Work:- Improvement work of footpath and drain in Chhapera Sabji Mandi under Zone 06 Ward 52 Geeta Nagar.
Sl. No.
Item Description
1
Earth work in cutting (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.
2
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.
3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-III): 12 graded Brick aggregate 40 mm nominal size).
4
Brick work with common burnt clay (non modular) bricks of class-150 in fondation and plinth in: Cement motar 1:4 (1 cement: 4 coarse sand)
5
12 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand)
6
R.C.C works with1:1.5:3 cement approved coarse sand and 2 cm (3/4\\") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc.
7
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate) 12 mm to 32 mm. tor etc.all complete.
8
Construction of granular sub base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavaton at OMC and compacting with vibratory roller to achieve the desired density, Complete as per MORT & H clause 402
9
providing and laying of 80 mm rubber mould interlocking tiles including all complete.
10
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded Brick aggregate 20 mm nominal size).
11
cartage of earth in upto 3 km including all complete
12
supply and fixing in 1 sign boad including all complete.
13
TAX18% Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.