| 1 | Earth Work in surface excavation not exceeding 30 Cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5m, as directed by Engineer in Charge |
| 2 | Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level Fotting 1:1:5:3 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth Beam 1:1:5:3 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level Column1:1:5:3 |
| 6 | Steel reinfocement for R.C.C. work including straightening, cutting, bending, placing, in position and binding all complete upto plinth level. |
| 7 | Centering and shuttering including strutting propping etc and removal form work footing |
| 8 | Centering and shuttering including strutting propping etc and removal form work Beam |
| 9 | Centering and shuttering including strutting propping etc and removal form work Column |
| 10 | Brick Work with common burnt clay brick of class 150 in plinth foundation in all shapes and size cement mortar 1:4 |
| 11 | Brick Work with common burnt clay brick of class 150 in super structure above plinth level upto floor v level in all shapes and size cement mortar 1:4 |
| 12 | 12MM cement aplaster of mix 1:4 |
| 13 | Finshing wall with water proofling cement paint of approved make such as super snowcem, Durocem robiance super cement quaily and of required shade on under coated wall surface |
| 14 | Steel Work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Please Enable Macros to View BoQ information |