| 1 | Dismantling of flexible pavement and disposal of dismantled material upto a lead of 1000mtrs, stacking serviceable and disposal of unserviceble materials separately within a lead of 50mtrsas per direction of Engineer-in-charge |
| 2 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the sise of foundation |
| 3 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc. |
| 4 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar, including supply of all material, labour and T&P etc. required for proper completion of the work. |
| 5 | Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions. |
| 6 | Centering and Shuttering in of C.C. work including all labour , T&P, etc. |
| 7 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. |
| 8 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. |
| 9 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. |
| 10 | S/f tar paper bearing over bed block. |
| 11 | S/F of wheel guard stone |
| 12 | Earth work in making Ramp and with compaction in 20.00 cm layers and dressing and also including labour T&Petc required for completion of work |
| 13 | Earth work in making of Diversion with compaction in 20.00 cm layers, dressing and also including labour T&P etc required for proper completion of work. /CUM |
| 14 | Earth work in Disposal of Earth from the road of Diversion including cost of all labour and T&P etc complete. /CUM |
| 15 | Providing Brick on edge Soling on Diversion Road including cost of all labour and T&P etc. Complete. /Sqm |
| 16 | Dismantling of Brick on edge Soling form Diversion road including cost of all labour and T&P etc. Complete. /Sqm |
| 17 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. |
| 18 | Supply and Fixing of M.S. Angle Sign Board 60x90 including cost of material,Taxes, labour T&P etc Complete,But excluding of G.S.T.per Nos.: Please Enable Macros to View BoQ information |