| 1 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work |
| 2 | Dewaterin of nala water by pump etc all complete work. |
| 3 | making Bandha with empaty cement bag filled by local sand or soil etc comp. of work |
| 4 | Earth work Exavation in soil mixed with moorum/shingle/kanker soil foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) |
| 5 | PCC 1:5:10 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) |
| 6 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) |
| 7 | 12mm thick plaster cement mortar consisting of 1 part cement and 4 parts of fine sand of 1.25 finerness modulus.SI 574 |
| 8 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 |
| 9 | Providing &laying of Rubber molded reflective Zig-Zag 80 mm thick Interlocking tiles of precast compressive strength I.S.I marked. In gray based Including joints filled and bedding 5cm. With local sand leveling dressing of surface required level &slop and also including all materail labour T&p loading unloading stacking cartage and all taxes required for proper completion of work as per MORD specification No.1500 |
| 10 | Cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. |
| 11 | R.CC work (1:2:4) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) |
| 12 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) |
| 13 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) |
| 14 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) |
| 15 | Providing and laying non pressure NP-3 class (Medium duty) RCC pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 etc all complete work |
| 16 | Cartage of earth upto 5 km. distance from site with all complete work. |
| 17 | Sand filling in foundation trenches and in full formation draina layer in black cotton soil of road. (PWD SH 2022-SL-2) |
| 18 | Supply & fixing of R.C.C. manhole frame and cover including complete. (NS) |
| 19 | Making connection of drain or sewer line with exisiting ma hole including breaking into and making good the wall floors with cement concrete 1:2:4 cement plastered on bo side with cement mortar 1:3 finished with a floating co neat cement and making necessary channels with ceme concrete 1:2:4 for the drain etc. complete(Cp-22 SL-03) |
| 20 | Barricating with the help of 10 cm horizontal ballies and 1 cm vertical ballies @ 50 cm c/c ballies and fixing below 1.00 to 3.00 M of water level and placing sand filled ba upto 30 cm above water level. |
| 21 | Supply & Fixing Granite Stone Work Display Board including Painting, Lettering etc. all complete. (As Per Analysis) Please Enable Macros to View BoQ information |