|
| 1 | E/W as in Filling cartage up 5 km Distance all compt work. |
| 2 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge |
| 3 | Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in: cement mortar 1:4 (1 cement : 4 coarse sand) |
| 4 | Plaster 12mm in 1:4 cement and course sand mortar all complete |
| 5 | Providing and laying in position cement concrete in 1:6:12 excluding the cost of centering and shuttering - All work upto plinth level |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 |
| 7 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 8 | Providing and laying in position 1:1.5:3 Rineforced cement concrete, including the cost of centering, shuttering finishing and excluding reinforced - All work upto plinth level |
| 9 | Centering & Shuttering including strutting, propping etc.and removal of form for.(iii) Suspended floors,roofs,landing,balconies and access platform. |
| 10 | Supplying, fitting & placing TMT bar reinforcement in foundation complete as per drawing & technical specifications Clauses 1002,1005,1010,& 1202 |
| 11 | Cartage of grit, sand, ballast etc.including loading unloading but excluding stacking on pucca road.for 1Km. |
| 12 | Supply and fixing of informatory sign board. |
| 13 | Total |
| 14 | Less 5% (-) |
| 15 | Total Please Enable Macros to View BoQ information |