| 1 | fo|qqr forj.k [k.M&L;kuk] cqyUn'kgj ds dk;Z{ks= eas iw.kZ tek ;kstukUrxZr ¼>ViV@fuos'k fe= iksVZy½ ij izkIr vkosnu tSls ;Fkk vkS/kksfxd] okf.kfT;d] ykbZu f'kf¶Vax o fo|qr la;kstu o vU; la;kstu “kh?kz vfr 'kh?kz fuxZRk fd;s tkus ds dk;ZA |
| 2 | Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx. |
| 3 | STP 11 mtr Long & PCC 8.5 mtr from E.S.C Bulandshahr to Site |
| 4 | PCC 11 mtr Long from E.S.C Bulandshahr to Site |
| 5 | CT/PT unit 10/5A from ESC. BSR to site |
| 6 | Pilffer ressitant metering cubicle from ESC. BSR to site with the help of Crane. |
| 7 | Cable 3x70/3x120/3x185 sqmm 11 KV XLPE with the help of Crane. |
| 8 | Cable LT ABC of sizes |
| 9 | Carrage 10/25/63/100 KVA TF |
| 10 | Carriage of All line Material from ESC to work at site as ACSR Weasel conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator & Pin Insulator etc. |
| 11 | Erection of Single support STP 11 mtr & PCC 8.5 mtr.including complete HT/LT fittings required for proper completion of work. |
| 12 | Erection of Single support PCC Pole 11 mtr.including complete HT/LT fittings required for proper completion of work. |
| 13 | Erection of Double Pole STP/ 11 mtr & PCC 8.5 mtr.including complete HT/LT fittings required for proper completion of work. |
| 14 | Erection of Double Pole PCC 11 mtr.including complete HT/LT fittings required for proper completion of work. |
| 15 | Grouting of Single support/Double pole shall be grouted with cement, sand and birck ballast/stone ballast required for proper completion of work. |
| 16 | Febrication cutting Hole Angle Channel etc. |
| 17 | Fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 18 | Mounting & Installation 10/25/63/100 kva T/F on the double Pole |
| 19 | Dismantalleing of old pole |
| 20 | Dismantalleing of old conductor |
| 21 | Grouting of Stay rods. |
| 22 | Fixing of earthing rod. |
| 23 | Laying of 3x70/3x120/3x185 sqmm 11KV XLPE cable proper completion of work |
| 24 | Laying, sagging. Stringing and binding and jumpering of ACSR weisal, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising |
| 25 | Laying, sagging. Stringing and binding and jumpering of LT AB Cable newly erected poles as per RESPO manual and as per direction of Supervising |
| 26 | Guarding of 11 K V line laying 3 Nos. Gl wire of size 6/10 SWG parallel and fixing of lacings (Tilli). |
| 27 | Mounting CT/PT unit on D/P with the help of Crane. |
| 28 | Provided & Fixing of Cable Box suitable for 3X70/3x120/3x185 sqmm 11KV XLPE. |
| 29 | Providing & Fixing Holding Clamps. |
| 30 | Providing & Fixing Double Pole Clamps. |
| 31 | Providing & Fixing L T Clamps. |
| 32 | Providing & Fixing Stay Clamps. |
| 33 | Providing & Fixing F- Clamps. |
| 34 | Providing & Fixing Stay Insulator. |
| 35 | Providing & Fixing LT Insulator. |
| 36 | Providing & Fixing J hook |
| 37 | Providing & Fixing Clamp for sutabile ABC |
| 38 | Providing & Fixing Suspension clamp |
| 39 | Providing & Fixing Dead end clamp |
| 40 | Providing & Fixing PRC |
| 41 | Providing Nut & Bolts off-size |
| 42 | Installation & Errection of Piffer ressitant metering cubicle . |
| 43 | Carriage of All line Material from site to store Bsr ACSR Weasel conductor etc. |
| 44 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |