Name of Work:- Improvement of hot mix plant work i-block 15 to i block 47 Under Ward-55 Zone-5
Sl. No.
Item Description
1
Dismantaling of old interlocking including stacking of materials as directed by Engineer-in chage with in a distance of 60mt.(200feet)
2
Earth work in excavation in trenches or foundation pipes cable etc in ordinary soil including lift upto 1.5m lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as per directed by Engg. i/c within a lead of 50m.SI.NO.251
3
Providing and laying in cement concrete 1:6:12 (1cement : 6 fine sand : 12 graded brick aggregate 40mm nominal size) and curing complete, including cost of formwork in foundation and floors.SI.No.273
4
Class-150 brick work in 1:4 cement and coarse send in foundation including supply of all materails labour and tools and plants etc. required for proper completion of
5
Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401.
6
12mm thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal 1 cement : 3 Coarse sand etc. all comp work ITEM No.NBO17.59
Disposal of surplus earth upto 3km including loading & unloading etc all.complete.
9
providing laying spreading and compacting graded stone aggregate to Wet mix macadam (W.M.M.) specification including premixing the material with water at omc in mechanical mix plant carrige of mixed material by tipper to site.
Prov./applying tack coat with bitumen(VG-10) USING bitumin pressure distributer @0.20 KG/Sqm on prpared bitumiious/granular surface cleaned with machnicall brrom etc.all complete.
12
P/L Dense graded bituminious macadam (DGBM) ith 60-90 TPH batch type HMP producing an average output of 75 tones per hour crushed aggregates of specificed grading premixed with bituminour binder @ 4.5 percent by weight of total mix and filler trtansporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandom rollers to achieve the desired compaction as per MORTH specification clause No 507 complete in all
13
Prov./laying bitumious concrete(BC) with computrised HMP type hot mix plant producing an averge out put of 75 tonnes per hour crushed aggregates of specifited grading primixed with bittuminous binder (CRMB-55 )@ 5.4%of mix and fiiler transported to site laying with a hydrostatic paver finisher with sensor control to the required graded level and alignment folling with smooth wheeled vibratory and tantom rollar to achive the desired compaction specification CLAUSE no.509 as per MORTH the disired compaction etc.
14
P/F padestal with fixing of stone as per approved spacification lab.mat.T&P etc.all complete.
15
Add GST Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.