| 1 | Demolition of cement concrete of any description and in any position, provided for complete all as directed.complete all as specified and as directed. |
| 2 | Removing demolished material exc.5KM n. exc. 10.00KM and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and as directed. |
| 3 | Providing and Laying Dry lean Concrete (DLC) 150 mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa. Minimum cemen content not less than 140 Kg/Cum DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting usign high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc complete all as specified and as directed. |
| 4 | Supplying and laying 400 micron thick HDPE sheet (Virgin Quality) water proof, wrinkle free without puncture having minimum weight 390 gm/Sqm over tack coat /sand cushion as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm. |
| 5 | M&L for 10 mm thick sand cushion with clean river sand duly clear of residual , organic and deleterious materials spread evenly to uniform thickness laid over DLC layer as specified and directed. (No additionaI amount to be paid for overlap), complete all as specified and directed. |
| 6 | M&L for Pavement quality concrete(PQC) of minimum 28 days field Flexural strength of 45Kg/ Sqcm or 4.5 Mpa, aggregate gradation as per Table 3 of IRC 15 2017, coarse aggregate of clean , hard strong, dense non-porous and durable pieces of crushed stone or gravel, fine aggregates of clean natural sand crushed stone sand or combination of both using minimum 360 kg/cum of cement with non-circular virgin synthetic fibre of 12-18 mm length, specific gravity 1.34 to 1.39, UV stable, alkali resistant, with equivalent dia 15-40 micron, minimum melting temperature as 240°C and minimum tensile strength of 300 Mpa and at the rate as specified by the manufacturer.PQC laid, spread and compacted with slip form paver of minimum 7.5 m width, including curing and tinning by texturing cum curing machine complete all as specified and directed. Required surface texturing to be done as specified in clause 10.1.14 of Table 9 of IRC : 15-2017. |
| 7 | M&L for Forming 25 mm width expansion joint in concrete slab for full depth of POC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. The join then filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant Placing of closed cell medium density,crossed linked polyethylene foam backup rod of 30 mm dia, over filler board and filled with polyurethane based sealant complying with BS 5212, BS 4254 and EN141875-2003 with minimum movement accommodation factor (MAF) of+/- 30% having minimum 10 year performance guarantee applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacture complete as specified and directed. |
| 8 | M&L for Cutting of construction joints 25 mm deep and 10 mm wide by early entry saw cut using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and othe debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell medium density, crossed linked polyethylene foam backup rod of 12 mm dia, application of bond breake tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant. complying with BS-5212, BS 4254 and EN- 141875-2003 with minimum movement accommodation factor (MAF) of +I- 30% having minimum 10 year performance guarantee, applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer complete as specified and directed. |
| 9 | M&L for Forming dummy/contraction joint with an initial saw cut of 3 mm soon after the concrete has set, upto a depth of 1/3rd the thickness of the slab widening the first saw cut to 10 mm and 27 mm deep by using diamond bit cutter of appropriate size straight and smooth edges Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam/ backup rod of 12 mm dia application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant after leaving 3mm recess ,complying with BS-5212 , BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) OF +/- 30% having minimum 10 year performance guarantee applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer complete as specified and directed. |
| 10 | Demolition of cement concrete in ground floor and paving exc 15 cm thickness (below or above ground level) incl removal of demolished material out side of MOD land complete all as specified and as directed. |
| 11 | M&L for 100mm thick PCC (1:4:8) type D2 using 40mm graded stone aggregate as in sub base of floor etc complete all as specified and as directed. |
| 12 | M&L for 75 mm thick PCC 1:2:4, type B1 (using 12.5 mm graded stone aggregate) as in flooring in leveling course complete all as specified and as directed. |
| 13 | M&L for Forming Contraction (Dummy) joints of 65 mm deep x 10mm wide, filled with sealing compound Grade 'A' complete all as specified & directed |
| 14 | M&L for 100mm thick PCC (1:3:6) type C2 using 40mm graded stone aggregate as in sub base of floor etc complete all as specified and as directed. |
| 15 | M&L for 25 mm thick sand cushioning laid dry to the profile under interlocking block complete all as specified and as directed. |
| 16 | M&L for machine pressed precast concrete interlocking paver block of approved shape and size of 60 mm thickness using grey cement and no pigment , with minimum compressive strength of 35 N / Sqmm (M-35 grade), without correction factor for chamfering, made in rubber moulds with 0.50 mm thick scratch proof lacquer coating on top surface complete all as specified and as directed. |
| 17 | M&L for machine pressed precast concrete interlocking paver block of approved shape and size of 80 mm thickness using grey cement and no pigment , with minimum compressive strength of Sqmm (M-40 grade), without correction factor for chamfering, made in rubber moulds with 0.50 mm thick scratch proof lacquer coating on top surface complete all as specified and as directed. |
| 18 | M&L for cement concrete Type B-0, 1:2:4 (using 12.5 mm graded stone aggregate) in kerb stone ,copings,, apex stones, , anchorage blocks, , etc.(of any section as directed) with plain fair faces, including chamfered weathering, throating etc complete all as specified and directed. |
| 19 | M&L for Finishing walls/concrate surface with Acrylic Smooth exterior paint of required shade : New work (Two coat )applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufactures instructions, complete all as specified and as directed. |
| 20 | Dismantling floor, hearth or wall tiling including cement mortar bedding and removing rubbish off the premises complete all as specified and as directed. |
| 21 | M&L for chequered cement concrete tile 30cmx30cmx20mm thick, set jointed and pointed in neat cement slurry in floors and including 20mm thick screed bed in CM (1:6) if approved colour and pointing with grey cement and pigment complete all as specified and directed. Please Enable Macros to View BoQ information |