| 1 | M&L for repairs to pot holes, not exc 1 square metre each, including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, cutting around edges to at least 25 mm in depth, on existing road surfaces, and making good applying evenly a tack coat of paving bitumen of grade VG-10 at the rate of 05 Kg per 10 Sqm, putting in premixed bituminous macadam with crushed and graded stone aggregate mixed together with 4% of paving bitumen of grade VG-30 by weight of total mix, well rammed and sealed with binder 9.8 Kg per 10 sqm, blinded with 0.09 Cum of stone chippings, 6.3 mm size and again well rammed including supply of premixed macadam, binder and chipping, depth of pot holes exc 30mm, complete all as specified and as directed.Note : Job mix formula of premix bituminous macadam shall be approved by CWE. |
| 2 | M&L for preparing black top surfaces by brushing with wire brushes for removing caked mud etc including sweeping with brooms and finally fanning the cleaned surface free from dust with air compressor through air jet to remove loose dirt etc, and making good applying evenly a tack coat of paving bitumen primer of grade VG-10 at the rate of 5 Kg per 10 Sqm, over paving bituminous macadam complete all as specified and as directed. |
| 3 | M&L for providing, laying, spreading premix bituminous macadam with crushed and graded stone aggregate mixed together with 4% of paving bitumen of grade VG-30 by weight of total mix including heating bitumen to the required temperature, mixing bituminous macadam in automatic and temperature controlled hot mixing with electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work at site by tippers and laying, spreading uniformly by means of hydrostatic paver finisher and rolling and consolidating to the required gradient and camber (consolidated thickness 75 mm or less) with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and directed.Note : (i) The contractor shall quote the rate against item considering 4% VG-30 bitumen content. Job Mix Formula as per CIause No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from MNIT Jaipur/MBM Jodhpur/ Govt approved Engineering Collage/ CTL for obtaining Optimum Binder Content (OBC) by the Contractor without any financial effect to the Department and same be submitted to the Accepting Officer for approval. Any variation in binder content on Minus side shall be adjusted @ 42/Kg of binder and no adjustment shall be made on Plus side.(ii) The bituminous macadam (BM) shall be covered with top layer/wearing course within in a maximum of 48 hours. If there is to be any delay by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. |
| 4 | Providing and laying spreading 30mm thick (consolidated thickness) of Premix Bituminous Concrete with crushed aggregates of grading 2 as per design based on Job mix formula with 5.5% bitumen binder content (bitumen of Grade VG-30) by weight of total mix including heating bitumen to the required temperature, mixing bituminous concrete in automatic and temperature controlled hot mixing with electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work at site by tippers and laying, spreading uniformly by means of hydrostatic paver finisher and rolling and consolidating to the required gradient and camber with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and directed.Notes : (i) Bitumen of Grade VG-30 for Bituminous Concrete shall be used and procured by the contractor under his own arrangement and at his own cost. (ii) Cost of all the materials, T&P, labour etc. required for providing and laying bituminous concrete including procurement of bitumen as specified here-in-before, stone aggregates & sand, cement etc., rolling and all other elements required for entire completion of the job shall be deemed to be included in the unit rate quoted for this item. Please Enable Macros to View BoQ information |
| 5 | Providing and laying spreading 30mm thick (consolidated thickness) of Premix Bituminous Concrete with crushed aggregates of grading 2 as per design based on Job mix formula with 5.5% bitumen binder content (bitumen of Grade VG-30) by weight of total mix including heating bitumen to the required temperature, mixing bituminous concrete in automatic and temperature controlled hot mixing with electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work at site by tippers and laying, spreading uniformly by means of hydrostatic paver finisher and rolling and consolidating to the required gradient and camber with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and directed.Notes : (i) Bitumen of Grade VG-30 for Bituminous Concrete shall be used and procured by the contractor under his own arrangement and at his own cost. (ii) Cost of all the materials, T&P, labour etc. required for providing and laying bituminous concrete including procurement of bitumen as specified here-in-before, stone aggregates & sand, cement etc., rolling and all other elements required for entire completion of the job shall be deemed to be included in the unit rate quoted for this item. Please Enable Macros to View BoQ information |