Name of Work:- Permanent Restoration of Road from Rehan to Demote (Balance work).
Sl. No.
Item Description
1
Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
2
Providing and laying in position cement concrete of 1:5:10 ( 1 Cement :5 Coarse sand : 10 graded stone agg. 40mm nominal size) crushed stone agg . All work upto plinth level.
3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level 1:3:6 ( 1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size ) crushed using 20% boulder
4
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
5
Providing and filling Hand Packed Stonein Wire Crates including Cost of Stone and Wire Crates complete job (NSI)
6
Providing and laying Hand packed Stone filling behind R/Wall
7
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
8
Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete
9
Foundations, footings, bases of columns
10
Carriage consumptions;
11
Sand by an average distance of 150 km by M.T.
12
Agg. below 40 mm by an average distance of 40 km by M.T.
13
stone by an average distance of 15 km by M.T. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.