| 1 | 25 KVA Distribution Transformer (Aluminium Wound) |
| 2 | Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. |
| 3 | Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage. |
| 4 | Labour Charges for cleaning of transformer tank, radiators top covers etc. |
| 5 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 6 | Re-Winding of LV Coil (Aluminium). |
| 7 | Winding of LV Leg Coil (Aluminium). |
| 8 | Winding of HV Leg Coil (Aluminium). |
| 9 | Rewinding of HV leg Coil (Aluminium) |
| 10 | Refitting/ Replacement of Bushing only HV/LV |
| 11 | Refitting/ Replacement of Bush rod only HV/LV |
| 12 | Labour charges for filtration of fresh/old transformer oil |
| 13 | Heat Treatment of Transformer HV/LV Coils |
| 14 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . |
| 15 | Labour Charges for testing of transformer |
| 16 | Labour Charges for Loading of transformer |
| 17 | Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. |
| 18 | Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. |
| 19 | Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc |
| 20 | 50/63 KVA Distribution Transformer (Aluminium Wound) |
| 21 | Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. |
| 22 | Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage. |
| 23 | Labour Charges for cleaning of transformer tank, radiators top covers etc. |
| 24 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 25 | Re-Winding of LV Coil (Aluminium). |
| 26 | Winding of LV Leg Coil (Aluminium). |
| 27 | Winding of HV Leg Coil (Aluminium). |
| 28 | Rewinding of HV leg Coil (Aluminium) |
| 29 | Refitting/ Replacement of Bushing only HV/LV |
| 30 | Refitting/ Replacement of Bush rod only HV/LV |
| 31 | Labour charges for filtration of fresh/old transformer oil |
| 32 | Heat Treatment of Transformer HV/LV Coils |
| 33 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . |
| 34 | Labour Charges for testing of transformer |
| 35 | Labour Charges for Loading of transformer |
| 36 | Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. |
| 37 | Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. |
| 38 | Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc |
| 39 | 100 KVA Distribution Transformer (Aluminium Wound) |
| 40 | Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. |
| 41 | Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage. |
| 42 | Labour Charges for cleaning of transformer tank, radiators top covers etc. |
| 43 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 44 | Re-Winding of LV Coil (Aluminium). |
| 45 | Winding of LV Leg Coil (Aluminium). |
| 46 | Winding of HV Leg Coil (Aluminium). |
| 47 | Rewinding of HV leg Coil (Aluminium) |
| 48 | Refitting/ Replacement of Bushing only HV/LV |
| 49 | Refitting/ Replacement of Bush rod only HV/LV |
| 50 | Labour charges for filtration of fresh/old transformer oil |
| 51 | Heat Treatment of Transformer HV/LV Coils |
| 52 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . |
| 53 | Labour Charges for testing of transformer |
| 54 | Labour Charges for Loading of transformer |
| 55 | Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. |
| 56 | Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. |
| 57 | Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc |
| 58 | 200/250 KVA Distribution Transformer (Aluminium Wound/Copper Wound) |
| 59 | Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. |
| 60 | Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage. |
| 61 | Labour Charges for cleaning of transformer tank, radiators top covers etc. |
| 62 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 63 | Re-Winding of LV Coil (Aluminium/Copper). |
| 64 | Winding of LV Leg Coil (Aluminium/copper). |
| 65 | Winding of HV Leg Coil (Aluminium/copper). |
| 66 | Rewinding of HV leg Coil (Aluminium/Copper) |
| 67 | Refitting/ Replacement of Bushing only HV/LV |
| 68 | Refitting/ Replacement of Bush rod only HV/LV |
| 69 | Labour charges for filtration of fresh/old transformer oil |
| 70 | Heat Treatment of Transformer HV/LV Coils |
| 71 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . |
| 72 | Labour Charges for testing of transformer |
| 73 | Labour Charges for Loading of transformer |
| 74 | Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. |
| 75 | Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. |
| 76 | Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc |
| 77 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 25 KVA DTR at site. |
| 78 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 79 | Dismantling and re-fixing of LV cable circuit of transformer |
| 80 | Dismounting of defective transformer from bed |
| 81 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 82 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 83 | Topping with transformer oil after Filtration/ Reconditioning |
| 84 | Reconditioning of HV coil (aluminium) |
| 85 | Reconditioning of LV coil (aluminium) |
| 86 | Winding of HV coil (Aluminium) |
| 87 | Winding of LV coil (Aluminium) |
| 88 | Replacement of HT/LT Bushing |
| 89 | Replacement of HT/LT Bush Rod |
| 90 | Mounting of repaired transformer on bed |
| 91 | Transportation of material from Divisional workshop Batote to the respective site for first 10 kms |
| 92 | Transportation of material for every additional 10 km |
| 93 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 50/63 KVA DTR at site. |
| 94 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 95 | Dismantling and re-fixing of LV cable circuit of transformer |
| 96 | Dismounting of defective transformer from bed |
| 97 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 98 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 99 | Topping with transformer oil after Filtration/ Reconditioning |
| 100 | Reconditioning of HV coil (aluminium) |
| 101 | Reconditioning of LV coil (aluminium) |
| 102 | Winding of HV coil (Aluminium) |
| 103 | Winding of LV coil (Aluminium) |
| 104 | Replacement of HT/LT Bushing |
| 105 | Replacement of HT/LT Bush Rod |
| 106 | Mounting of repaired transformer on bed |
| 107 | Transportation of material from Divisional workshop Batote to the respective site for first 10 kms |
| 108 | Transportation of material for every additional 10 km |
| 109 | Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 100 KVA DTR at site. |
| 110 | Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers |
| 111 | Dismantling and re-fixing of LV cable circuit of transformer |
| 112 | Dismounting of defective transformer from bed |
| 113 | Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs |
| 114 | Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core |
| 115 | Topping with transformer oil after Filtration/ Reconditioning |
| 116 | Reconditioning of HV coil (aluminium) |
| 117 | Reconditioning of LV coil (aluminium) |
| 118 | Winding of HV coil (Aluminium) |
| 119 | Winding of LV coil (Aluminium) |
| 120 | Replacement of HT/LT Bushing |
| 121 | Replacement of HT/LT Bush Rod |
| 122 | Mounting of repaired transformer on bed |
| 123 | Transportation of material from Divisional workshop Batote to the respective site for first 10 kms |
| 124 | Transportation of material for every additional 10 km |
| 125 | Provision for Rectification of Severely Damaged Transformer Tank/Body, Including Dent Removal, Welding, Fabrication/Replacement of Damaged Components, Leak Testing and Associated Works for Distribution Transformers (11KV/0.44KV) up to 250 KVA Please Enable Macros to View BoQ information |