| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts both ways and headload where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking C) Beyond 2.00 km and upto 3.00 km |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and back filling with approved material complete as per direction of the Engineer-in-Charge. (upto 3.0 m depth) (i) With pumping out water including shoring as required. |
| 4 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged byDepartment within a lead of 150 m. |
| 5 | Supplying spreading and compacting silver sand to required thickness in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction including cost of silver sand lighting, guarding, barricading and making adequate earthen bundh where necessary, with water as per direction, mending cracks and depressions by ramming wherever necessary. |
| 6 | Brick edging 75mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench(on both side of the edging) with spoils and ramming the same thoroughly complete as per direction. (a) Brick-on-edge edging (125 mm) depth. |
| 7 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. (a) Single brick flat soling (thickness 75 mm.) |
| 8 | Providing and laying nominal mix Cement concrete (with mix proportion 1:1.5:3) / M-20 grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm of Pakur or other approved variety including Screening and cleaning of aggregates, if necessary, both of approved quality and cement, as necessary, compacting by vibrator or other suitable means, cost of curing with water, cost for quality control, sampling, testing etc. and including placing a Separation membrane of impermeable PVC sheet 125 micron thick transparent or white in colour laid flat with minimum creases. Before placing the separation membrane, the sub-base shall be swept clean of all the extraneous materials. Wherever overlap of plastic sheets is necessary, the same shall be at least 300 mm and any damaged sheathing shall be replaced at the Contractor's cost. Including carriage of all materials to site but excluding the cost of staging, shuttering and and reinforcement if any. |
| 9 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapetsb cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials.(a) In 1:4 proportion. |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With Mortar Mix- 1:4(a) 20mm thick plaster |
| 11 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 12 | Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void). (b) 1st class brick ballast |
| 13 | Providing and laying pre-cast brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster, curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport.The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is1:4) |
| 14 | SupplyingJhaw/Eucalyptusbullahpilesatworksite, including dressing and making one end pointed. Note:Diameterofpiletobemeasuredat adistanceof 1.5m from the thicker end. (ii) 12.5 cm av. Diameter |
| 15 | Labour for driving Jhaw/Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position,protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles (ii) 12.5 cm av. Diameter |
| 16 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm.and less than 15cm(i) Jhaw / Eucalyptus. |
| 17 | Coal tarring on wooden surfaces including cost of materials(b) Single coat |
| 18 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 19 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary. |
| 20 | Supplying,fitting & fixing with iron nails half split bamboo walling pieces(av dia of bamboo not less than 5 cm). |
| 21 | Supplying empty Cement bags in good condition. |
| 22 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. |
| 23 | Earthwork in re-excavation / silt clearance of drainage channels in all kinds of soil including sludge and slush but excluding slush mixed with industrial wastes, sewage, municipal garbage, carcasses, etc and depositing the same as per profile in proper place as directed by the Engineer-in-charge without causing hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition including removal of polypacks, brickbats, stone ballasts & boulders, remnants of bullah & bamboo pins and all kinds of water hyacinth, solid / semi solid compact mass formed due to water hyacinth and burning them to ashes or removing outside Govt land where necessary and removal of thick & thorny jungles upto 30 cm girth including shoring and shuttering, if required, and including initial removal of sludge and slush etc by pan or bucket if required, and making arrangement for bailing out of any seepage water and removal of sand or soil blown from underneath, all complete.(a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M |
| 24 | Making cubical bamboo porcupine cages with bamboo of 60 mm to 75mm dia. having length of 1.8 metre each for all horizontal and vertical struts and 2.5 metre length for diagonal struts, 3 nos horizontal and 3 nos vertical struts should be placed equi-distant from each face to make the square cage of outer dimension 60 cm x 60 cm and projecting each strut by 60 cm on all directions. Two nos dioganals or cross bamboo posts should be placed on each face having their centre tied with the centre of cage properly including fitting, fixing corners, vertical, horizontal and diagonal struts with iron nails not less than 20 cm long and tying corners with 16 SWG galvanized iron wires, filling the cages with 1st class kiln burn Brick @ 40 nos bricks per cage. Cages builts with 10 SWG hexagonal or square pattern 10 cm mesh, with proper lapping, tying and sewing with 10 SWG GI wire including cost of all materials, carriage to site and laying the same in the bed or slope of the river etc. complete as per direction of the Engineer - in - Charge( N.B::- If G I wirenetting is not considered then Rs. 215.00 per cage may be deducted from the following costs, towards cost of wire netting including OH and conctarcor's profit .)For cages of size 60cm x 60cm x 60cm with 1st class kiln burn Bricks (a) Single cage. |
| 25 | Add 18% for GST |
| 26 | Add 1% Cess Please Enable Macros to View BoQ information |