| 1 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existingtelephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and makingflange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. |
| 2 | (A) Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials butexcluding cost of valves. 75 mm(OD) |
| 3 | Construction of RCC street stand post (700mm height) of RCC (1:1.5:3) footing over 75mm thick 4:2:1 P.C.C over a single B/F soling with 1% reinforcement, connected with saddle piece & 15mm dia brass ferrule with supplying fitting, fixing 15mm dia G.I. nipple, G.I.socket, G.I. 200mm x 150mm reducing elbow and 20mm dia GI(m) TATA pipe of (avg.) 2.6mtr. long and one 15mm dia alloy Iron with brass spindle bib cock with socket and 20mm G.I. elbow 2nos. with 15mm GI(m) TATA pipe of 0.225mtr. for connection of stand post to distribution line as per deptt. design and drawing as per direction of EIC along with Construction of platform of size CC platform (1:2:4) over a single B/F soling below G.L over 150mm.thick sand filling, neat cement finish over platform and inner side of band and 15mm thick cement plaster (4:1) on top of platform band and outside upto G.L. as per deptt. drawing and as per direction of EIC |
| 4 | Bituminous pucca road (approx. 450mm depth) cutting by using gaiti, chisel, hammer etc. and picking uip the withdrawing excavated materialsand remove the same within distance of 30mtr. at least all complete for fixing/crossing all dia of pipe line as per direction of EIC |
| 5 | Hire charges of J.C.B for road cutting including fuel, lubricant, and operator of the machine all complete |
| 6 | Ordinary mix cement concrete with M-15(mix 4:2:1) graded stone chips (20mm. size) excluding shuttering and reinforcement if any, in ground floor a) River bazree |
| 7 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m in ground floor including roof.i) Upto 150 mm thick |
| 8 | Making holes in two sides of wall of culvert/drain or any other structures in any places for laying any dia pipe line withinstructures intwo sides of wall of culvert /drain /any structure at any places and mending good damages all complete as per direction ofEIC. |
| 9 | Dewatering from the excavated trenches for repairing any type of pipe line including Hire Charge of pump / carriage / Fuel & lubricant / Operator etc. for big dia pipes more, than 200mrn dia all complete as per direction of EIC.(This item will be executed after the permission of E.l.C.) |
| 10 | Making barricading for protecting the trench to avoid any accident including making arrangement of road light during the night. |
| 11 | Add. @ 18% GST |
| 12 | Add. @ 1% CESS Please Enable Macros to View BoQ information |