| 1 | Installation 100 mm dia UPVC DTW including arranging carriage of necessary boring materials/ tools etc including capacity of 100 mm dia UPVC Pipe assembly comprising of strainer pipe and cone including necessary jointing materials and developing of DTW with compression and supply and packing of pea gravel arround the periphery of casing including screening washing etc all complete as directed Average depth of DTW considered = 50 rm 1.At Ram Ray Stadium |
| 2 | 2.At Ganakkuchi Kalbari Satra |
| 3 | 3.At Madhoi Aatoi Than, W.No.19 |
| 4 | 4. At Barpeta Municipal Play Ground |
| 5 | 5. Sukhalata Choudhury Path W.No.18 |
| 6 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 7 | Supply, delivery, and installation of standalone water purification plant with solar pump set fitted with tube well, capable of removing contaminants such as iron, arsenic, etc. & bacteriological disinfection from the raw water as per the acceptable limits of IS: 10500:2012 including 3 months trail run and 21 (Twenty-one) months operation and maintenance after the trial run under PHED of Assam, which broadly comprises supply. Delivery, Installation, testing & Commissioning of standalone community water purification of BLDC Motor based solar pump set with tube well-having filtration rate not less than 2 m³/hr. the plant will be aided by photovoltaic submersible solar pumps within the bore well with a minimum yield of 10500 liters per day. (The plant is capable to work on solar energy (PV Panel), Lithium Ion batteries), the battery should be a Li-ion battery backup capable of giving a minimum of 2 hours of backup). The plant should treat the water from the minimum level of contamination of 5.0 ppm of iron and 2.0 ppm of Arsenic contamination in the raw water source available at the site and be able to purify the specified standards namely Arsenic<0.01 mg/ltr. And Iron<0.3 mg/ltr. (total concentration of manganese (as Mn) and Iron ( as Fe) shall not exceed 0.3 mg/ltr and bacteriological contamination as per BIS standard and conforming to MNRE norms & the norms prescribed in the Manual on Supply and treatment of CPHEEO. Filtration process technology is approved by CSIR-IMMT, Bhubaneswar. BLDC Solar Water Pump• Capacity: 1 HP• Dynamic Head: 30-40M (10500 LPD)•Pipe: UPVC 1.25\\"• Wire: 2.5 Sq mm 3 core Solar Panel•Capacity: 1005 Wp (335 x 3 NosyPeak Hours: 5-5 Hours/dayMax.Current: 8 Amps Solar panel structure for 3 Panels BatteryCapacity: 96V-24Ah Backup: 2 HoursDischarge: 2.3 KWp-6A ControllerAutomatic power source selection with preference to solar and battery for running the solar water pump Tank Full, Dry run control & Remote Monitoring SystemWire 2.5 Sq mm will support Solar and battery 1\\" stage: Chlorine Dosing System (CDS) Flowrate: 0-6 LPHIDosing: Hypo Chlorite 2 stage: Multigrade Sand Filter (MGF)Size: FRP 350 mm 1625 mmFlow Rate : 2000 LPHFilter Media: Pebbles, Gravels, Filter Sand & AnthraciteMPV Size :25 NB Top Mount 3d stage: Iron Removal Filter (IRF)Size:-FRP 350 mm 1625 mmFlow Rate : 2000 LPHFilter Media: Pebbles, Gravels, Filter Sand & MZ10+MPV Size :25 NB Top Mount 4th stage: Activated Carbon Filter (ACF)Size: FRP 350 mm * 1625 mmFlow Rate : 2000 LPH Filter Media: Pebbles, Gravels, & Activated CarbonMPV Size :25 NB Top Mount 5th stage: Arsenic Removal Filter (ARF) Size : FRP 350 mm 1625 mmFlow Rate : 2000 LPH1.At Ram Ray StadiumFilter Media: Ferrix A33EMPV Size :25 NB Top Mount Plumbing & Electrical only for WTP, Solar pump, SolarPanel, Controller & B |
| 8 | 2.At Ganakkuchi Kalbari Satra |
| 9 | 3.At Madhoi Aatoi Than, W.No.19 |
| 10 | 4. At Barpeta Municipal Play Ground |
| 11 | 5. Sukhalata Choudhury Path W.No.18 |
| 12 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 13 | \\"Storage Tank: LDPE ISI markedStaging 5000 Ltr: On MS atructure with 3.1 meter Height Staging 5000 Ltr. Resting on the plateform\\" 1.At Ram Ray Stadium |
| 14 | 2.At Ganakkuchi Kalbari Satra |
| 15 | 3.At Madhoi Aatoi Than, W.No.19 |
| 16 | 4. At Barpeta Municipal Play Ground |
| 17 | 5. Sukhalata Choudhury Path W.No.18 |
| 18 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 19 | Raised platform along with Boundary wall grill & gate 1.At Ram Ray Stadium |
| 20 | 2.At Ganakkuchi Kalbari Satra |
| 21 | 3.At Madhoi Aatoi Than, W.No.19 |
| 22 | 4. At Barpeta Municipal Play Ground |
| 23 | 5. Sukhalata Choudhury Path W.No.18 |
| 24 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 25 | Provding Service connection LT Line to the water purification plant including PSC pole 7.5m, LT stay, LT Guy Insulator, Stay Wire,7/14 SWG, anchore clamp, Flate pole clamp, GII Hook, LT Connector, Nut&Bolt, 10mm BTC Cable as per direction of the department.1.At Ram Ray Stadium |
| 26 | 2.At Ganakkuchi Kalbari Satra |
| 27 | 3.At Madhoi Aatoi Than, W.No.19 |
| 28 | 4. At Barpeta Municipal Play Ground |
| 29 | 5. Sukhalata Choudhury Path W.No.18 |
| 30 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 31 | Protection Shed for filter media.1.At Ram Ray Stadium |
| 32 | 2.At Ganakkuchi Kalbari Satra |
| 33 | 3.At Madhoi Aatoi Than, W.No.19 |
| 34 | 4. At Barpeta Municipal Play Ground |
| 35 | 5. Sukhalata Choudhury Path W.No.18 |
| 36 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 37 | For Drainage System.1.At Ram Ray Stadium |
| 38 | 2.At Ganakkuchi Kalbari Satra |
| 39 | 3.At Madhoi Aatoi Than, W.No.19 |
| 40 | 4. At Barpeta Municipal Play Ground |
| 41 | 5. Sukhalata Choudhury Path W.No.18 |
| 42 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 43 | Supply, delivery, and installation automatic IRF & ARF fiver system at CWPP scheme as directed by deptt.1.At Ram Ray Stadium |
| 44 | 2.At Ganakkuchi Kalbari Satra |
| 45 | 3.At Madhoi Aatoi Than, W.No.19 |
| 46 | 4. At Barpeta Municipal Play Ground |
| 47 | 5. Sukhalata Choudhury Path W.No.18 |
| 48 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 |
| 49 | 21 (Twenty one) months operation and maintenance of the entire plant including supplying of all accessories (Civil/Mechanical/Electrical and Instrumentation) manpower, spares, chemicals and other consumables as and when required and successful completion and trial run of the plant for three months (including commissioning but excluding the cost of electric power). The operation and maintenance will also cover change of filter media and it 2022/0621 extra cost. as per protocol at no extra cost. 1.At Ram Ray Stadium |
| 50 | 2.At Ganakkuchi Kalbari Satra |
| 51 | 3.At Madhoi Aatoi Than, W.No.19 |
| 52 | 4. At Barpeta Municipal Play Ground |
| 53 | 5. Sukhalata Choudhury Path W.No.18 |
| 54 | 6 At Sri Sri Garakhia Gokhai Than, W.No.10 Please Enable Macros to View BoQ information |