| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . |
| 2 | Clearing and Grubbing road landClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. |
| 3 | Compacting original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction. |
| 4 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 5 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 6 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 7 | Carriage Cement-10km |
| 8 | Sand -20Km |
| 9 | Stone chips-30 Km |
| 10 | Stone Dust-30Km |
| 11 | Stone Metal -30 Km |
| 12 | E/W in ecavation of foundation of structures as per drawing and technical specification, including setting out , construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.(upto 3.00 m depth)RCD 12.1 |
| 13 | Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less 40 kg each complete as per drawing and technical specification .(A) Boulder laid dry without wire crates.) RCD 15.1(A) |
| 14 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications(P.C.C. Grade M-15)S.O.R. Item No. RCD 12.8(A) |
| 15 | Stone masonary work in cement mortar 1:3 in foundation complete as per drawing and technical specification ..(b)Random Rubble Masonary in C.M. 1:3 in foundationS.O.R. Item No.RCD 12.7(B) |
| 16 | Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Random Rubble Masonary in C.M. (1:3) in sub-structure.S.O.R. Item No. RCD 13.4 |
| 17 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications(P.C.C. Grade M-15)S.O.R. Item No. 12.8(A) RCD |
| 18 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications(R.C.C. Grade M-20)S.O.R. Item No.RCD 13.50 case (iiE) Case I using concrete mixer |
| 19 | Furnishing and placing reinforced cement concrete in super structure as per drawing and technical specification.(P.C.C. Grade M-25 in Deck Slab)S.O.R. Item No. RCD 14.1 case ii case i(p) |
| 20 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical SpecificationsS.O.R. Item No. 14.4 |
| 21 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsS.O.R. Item No. RCD 14.2(A) |
| 22 | Providing 12 mm thick cement plaster (1:4) with clean course sand of f.m. 1.5 including screening curing with all leads and lifts of water do… do as per E/i. & 1204S.O.R. Item No. 5.7.2 |
| 23 | Providing weep holes with day grades stone filter of 53 mm to 22.4 mm size in abutment and wing wall all complete job as per specification and direction of E/I.S.O.R. Item No. 13.8 |
| 24 | Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8S.O.R. Item No13.9 (B). |
| 25 | Carriage Cement |
| 26 | stone Chips |
| 27 | Boulder |
| 28 | Steel |
| 29 | Add GST @ 18 % |
| 30 | Add L.Cess @ 1 % Please Enable Macros to View BoQ information |