|
| 1 | Excavation for foundation / pipe trenches inearth, soils of all types, sand, gravel andsoft murum, including removing theexcavated material upto a distance of 50metres and lifts as below, stacking andspreading as directed, normal dewatering,preparing the bed for foundation andexcluding backfilling, etc. |
| 2 | Excavation for foundation / pipe trenches inhard murum and boulders, W.B.M. roadincluding removing the excavated materialupto a distance of 50 M beyond the areaand lifts as below, stacking and spreadingas directed by Engineer-in-charge, normaldewatering, preparing the bed forfoundation and excluding backfilling, etc.complete.(Bd-A-3/259) |
| 3 | Providing D.1. pipes (push on joints pressure pipes of D. I. of following class and diameters. confirming to the I. S. specification inclusive cost of jointing materials (Rubber gasket of EPOM Quality) excluding GST levied by GOI & GOM inall respect including Third party inspection charges of TPI Agency approved by MJP including Transit insurance, Railway Freight. Unloading from railway wagon, Loading into Truck, Transportation to departmental store, unloading, stacking etc. completed as directed byEngineer in charges (IS 1536/2001 for pipes and iS 158/1969 and IS 12820/1989 or latest edition/revision with amendments for Rubber Gaskets |
| 4 | Lowering, Laying and Jointing DI. pipes in proper position including all specials by compression fitting/electrofusion andbutt fusion jointing procedure as per relevent ISCode complete with all materials for jointingprocedure like Electrofusion machine, Electricheater/butt fusion welding machine with hydraulicjack, top loading clamp etc. and all labours asdirected |
| 5 | Providing double flange sluice valve confirming for IS-14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc.complet |
| 6 | Lowering, laying and jointing in position following CIDIF Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complate. (Rate for all class of valves.). |
| 7 | DI Socket and flanged fittings:-Providing and supplying D.i.fitting with ISI mark socket pushon joints or flanged joints confirming to table 12 to 31 of IS 9523/2000 upto latest amendments including cost of SBR/EDPM tyton rings. Fittings should be with internally ordinary portland cement mortor lined and externally metallic zinc coating/zinc rich paint with finishing layer of black bitumen coating including transportation & excluding all statutary duties and taxes such as GST levied by Gol and GoM in all respect etc complete |
| 8 | Helper (For Repair Works) |
| 9 | Fitter (For Repair Works) |
| 10 | Dewatering |
| 11 | Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc complete as directed by Engineer-in-charge. |
| 12 | Add 18% GST Please Enable Macros to View BoQ information |