| 1 | Matrial Part of LT line |
| 2 | Prov. R.C.C. Muff (2000 mm) with C. C. 1:2:4 for filling |
| 3 | Prov. Shackle Insulaotrs |
| 4 | Prov. D-Iron |
| 5 | Prov. L.T Stay Set |
| 6 | Prov. Stay Wire 7/3.15 mm (@7.0 kg per stay set) |
| 7 | Prov.Single Continuous wire ( GI 8 SWG ) (for jointing) |
| 8 | Prov.Eye hook for Earth wire |
| 9 | Prov.Nut & bolt with washer of various sizes |
| 10 | Prov.Aluminium Paint |
| 11 | Errection Charges |
| 12 | Erection of steel poles(New) 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming & painting etc complete in all respect |
| 13 | Erection of LT stay set(New/Uprooted), stay wire, stay clamp, egg insulator, digging of pit, filling & ramming, fixing of stay rod, nozzeling & tightening etc. complete in all respect. |
| 14 | Fixing of jumpers |
| 15 | 1KM , Single wire ACSR/AAAC 20mm2 |
| 16 | Laying of GI wire |
| 17 | Stringing & Sagging |
| 18 | Binding with Earth hook/earth clamp |
| 19 | 1KM , Single wire ACSR/AAAC 30mm2 |
| 20 | Laying of Conductor |
| 21 | Stringing & Sagging |
| 22 | Binding with Insulator |
| 23 | 1KM , Single wire ACSR/AAAC 50mm2 |
| 24 | Laying of Conductor |
| 25 | Stringing & Sagging |
| 26 | Binding with Insulator |
| 27 | Manual Carriage of Material for 1KM lead line considering average distance from road to site of work 1 KM |
| 28 | LT steel Poles ( New ) |
| 29 | Damage LT ST pole |
| 30 | X-Arms, Shackle insulator & D-iron |
| 31 | GI wire |
| 32 | ACSR /AAAC Conductor |
| 33 | Transporation Charges |
| 34 | Transporation Charges for carriage of poles 8/9mtr long conductor , muff , lt stay set , insulators , stay wire , d-iron , GI wire and other allied material of LT line from section store to site of work and dismantle Damage pole from site of work to section store |
| 35 | Dismantling of damaged Steel Pole 8 & 9 mtr @50% Of erection of new pole |
| 36 | Straightening of tilted Steel Pole 8 & 9 mtr |
| 37 | Digging of Pit |
| 38 | Erection of Pole |
| 39 | Filling of Pit and Ramming |
| 40 | Cutting and looping of Tree/Tree branches fell on LT lines due to landslide or any other means Please Enable Macros to View BoQ information |