|
| 1 | HT Line |
| 2 | Supply Part |
| 3 | Prov. RCC Muff with Concrete Filling 2000mm length. |
| 4 | Prov. 33 KV Pin Insulator with Pin Hellically formed fitting (Porcelain, 35kV, 10kN) |
| 5 | Prov. 33 KV Disc Insulator Set Cleaves & Toungue Hellically formed fitting (Porcelain, BS, 12kV, 90kN) |
| 6 | Prov. C.I. X-arm(100x50x5mm),Length: 3200 mm for S.Pole Str. Double circuit Line |
| 7 | Prov. C.I. X-arm(100x50x5mm),Length: 3500 mm for D.Pole Str. Double circuit Line |
| 8 | Prov. C.I. X-arm(100x50x5mm),Length: 3200 mm for D.Pole Str. Double circuit Line |
| 9 | Prov. Stay Set Complete in all respect i/c Guy Assembly with Helically Fitting |
| 10 | Prov.Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 11 | Prov. H.T. Earthing for PCC /S/T Pole |
| 12 | Prov. Full Clamp with nuts & bolts M.S. Flat 50x6 mm |
| 13 | Prov. Half Clamp with nuts & bolts M.S. Flat 50x6 mm |
| 14 | Prov. Earth Hook for Earth Wire |
| 15 | Prov. Danger Plate (250x200x1.6 mm) |
| 16 | Prov. Nuts & Bolts Of various sizes ( Gaivanised/ Coated) ( Preferably 16 mmɸ or more with flat and spring washers) |
| 17 | Prov. Barbed Wire |
| 18 | Prov. Alluminium Paint |
| 19 | Erection of HT line |
| 20 | Erection of ST pole 10/11/13 mtr ,muff i/c CC muffing with 1:2:4 ratio, CI-X-arm for Single pole structure (Run Through) , drilling of holes in pole & -X-arm etc, disc insulators with complete fitting, pin insulator with pin, AI -X- bracing set, barbed wire, danger plate, MS Full & half clamps, nuts & bolts off sizes, digging of pit, filling ramming & painting to all metal parts etc complete in all respect. |
| 21 | Erection of ST pole 10/11/13 mtr ,muff i/c CC muffing with 1:2:4 ratio, CI-X-arm for double pole structure (Dead) , drilling of holes in pole & -X-arm etc, disc insulators with complete fitting, pin insulator with pin, AI -X- bracing set, barbed wire, danger plate, MS Full & half clamps, nuts & bolts off sizes, digging of pit, filling ramming & painting to all metal parts etc complete in all respect. |
| 22 | Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling & ramming, fixing of stay rod, nozzeling & tightening etc. complete in all respect. |
| 23 | Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 24 | Re-Sagging of ACSR/AAAC Conductor (100 mm2 )(old) 1 KM single wire |
| 25 | Stringing and sagging |
| 26 | Binding with insulator |
| 27 | Manual Carriage of Material for 1KM lead line considering average distance from road to site of work 1 KM |
| 28 | HT steel Poles with muff ( New ) |
| 29 | Damage HT ST pole (Old) |
| 30 | X arms, bracing set, insulators etc. |
| 31 | Stay set & stay wires |
| 32 | GI wire |
| 33 | ACSR /AAAC Conductor 80 mmsq |
| 34 | Cutting of Tree/Tree branches fell on HT lines causing damage |
| 35 | Cutting and looping of Tree/Tree branches fell on HT lines due to landslide or any other means |
| 36 | Local Transportation Charges |
| 37 | For pole including conductor, cross arms, knee bracing sets, top clamps, Pin Insulator, Xross bracing sets, Disc Insulator, stay set, stay wire, Full clamps , Half clamps, Danger Plates, Nut & Bolts Barbed wires coplete in all respect . |
| 38 | Dismantling of damaged Steel Pole 9, 10 & 11 mtr @50% Of erection of new pole |
| 39 | Re-Erection of tilted ST pole 9/10/ 11/13 Mtr Long (DP Tilted/Displaced) Digging of Pit, Erection of Pole, Filling of Pit and Ramming & Fixing of insulator, X arm, X bracing set |
| 40 | Re-Erection of tilted ST pole 9/10/ 11/13 Mtr Long (SP Tilted/Displaced) Digging of Pit, Erection of Pole, Filling of Pit and Ramming & Fixing of insulator, X arm, X bracing set Please Enable Macros to View BoQ information |