|
| 1 | Work Schedule |
| 2 | Earthing Complete |
| 3 | Supply & fixing of Silicon Fiber Class Insulation Cover for 5 mm GI Wire |
| 4 | Survey of H.T. & L.T. Cable route (UG) |
| 5 | Excavation of soil for making trenches & re-instatement of cable trench with excavated soil |
| 6 | Supply of Klin-burnt 1st class Bricks Having proper size & shape |
| 7 | Laying of Bricks as per drawing & instruction of site Engineer |
| 8 | Making Plinth for Distribution Feeder Piller Box |
| 9 | Erection of Distribution Feeder Piller Box |
| 10 | Supply & fixing of cable tag on the cable |
| 11 | Fixing of Loop Connection-1ph |
| 12 | Fixing of Loop Connection-3ph |
| 13 | Laying & dressing of 1.1kV, XLPE, Cable Size 185sq. mm & below in excavated cable trench- Double cable in a trench |
| 14 | Laying & dressing of 1.1kV, XLPE, Cable Size 240sq. mm & above in excavated cable trench- Double cable in a trench |
| 15 | Cable 1.1kV, PVC / XLPE, 3.5/4x95/120 Sq.mm. |
| 16 | Cable 1.1kV, PVC / XLPE, 3.5/4x185/225 Sq.mm. |
| 17 | Cable 1.1kV, PVC / XLPE, 3.5/4x300/400 Sq.mm. |
| 18 | Making Straight through joint including making of jointing pit without supply of jointing materials & excluding making of \\"protection duct for cable joint\\"- 1.1kV, XLPE, 3.5/4x 95/120sq.mm. Cable |
| 19 | Making Straight through joint including making of jointing pit without supply of jointing materials & excluding making of \\"protection duct for cable joint\\"- 1.1kV, XLPE, 3.5/4x 185/225/240sq.mm. Cable |
| 20 | Making Straight through joint including making of jointing pit without supply of jointing materials & excluding making of \\"protection duct for cable joint\\"- 1.1kV, XLPE, 3.5/4x 300/400sq.mm. Cable |
| 21 | GIS Field Survey Please Enable Macros to View BoQ information |