| 1 | Work Schedule |
| 2 | Supply & erection of Sub-Stn D.P. Structure with 7.03 mtr H-Beam Pole-ISMB 250 (37.3 kg/mtr.). DP with all fabrications & fittings complete (details are attached in separate sheet)-L/S |
| 3 | Earthing Complete |
| 4 | Supply & fixing of Silicon Fiber Class Insulation Cover for 5 mm GI Wire |
| 5 | Erection of Trans. 315 KVA (O/D TYPE) & (I/D TYPE for H-beam) |
| 6 | Survey of H.T. & L.T. Cable route (UG) |
| 7 | Excavation of soil for making of trial hole (Size 1.1 x 0.76 x 1.2m depth) as per instruction of site Engineer including backfilling the excavated soil. |
| 8 | Excavation of soil for making trenches & re-instatement of cable trench with excavated soil |
| 9 | Supply of Klin-burnt 1st class Bricks Having proper size & shape |
| 10 | Laying of Bricks as per drawing & instruction of site Engineer |
| 11 | Making Plinth for Distribution Feeder Piller Box |
| 12 | Erection of 11kV 4-way RMU (Outdoor type) |
| 13 | Erection of Distribution Feeder Piller Box |
| 14 | Earthing of body of DTR, RMU- material supplied by contractor |
| 15 | Making protective Duct for cable joint complete |
| 16 | Supply & fixing of cable tag on the cable |
| 17 | Supply & erection of C.I. cable marker on concrete |
| 18 | Fixing of Loop Connection-3ph |
| 19 | Laying & dressing of 11kV, XLPE, 3x300/400 Sq.mm. in excavated cable trench- Single cable in a trench |
| 20 | Laying & dressing of 1.1kV, PVC / XLPE, 3.5/4x300/400 Sq.mm. in excavated cable trench- Single cable in a trench |
| 21 | Laying & dressing of 1.1kV, XLPE, Cable Size 240sq. mm & above in excavated cable trench- Double cable in a trench |
| 22 | Cable 11kV PILC / XLPE 3x95/120sq.mm. |
| 23 | Cable 11kV PILC / XLPE 3x300/400sq.mm. |
| 24 | Cable 1.1kV, PVC / XLPE, 3.5/4x300/400 Sq.mm. |
| 25 | Making Straight through joint including making of jointing pit without supply of jointing materials & excluding making of \\"protection duct for cable joint\\"- 11kV, XLPE, 3 Core, 300 / 400sq.mm. Cable |
| 26 | Micro-tunnelling work with laying & supply of HDPE pipe of 160mm dia., PE-80, PN-6 & without laying of U.G. cable (This rate is applicable for state highway / NH / Road with propensity of high density of heavy vehicle) Cable Size: 11kV, 3C x 300sq.mm |
| 27 | Supply and fixing/laying of G.I. Pipe (medium) (Non-TATA) as per I.S.I. of the 150mm dia |
| 28 | GIS Field Survey Please Enable Macros to View BoQ information |