| 1 | Excavation in trenches n.exc 1.5 M wide and n.exc 1.5 M in depth for pipe line, etc in soft/ loose soil getting out and levelling of bottom surface to required level complete all as specified and as directed.Note:- Excavation where existing UG Cables/ water pipe lines are crossing, manual excavation only will be allowed. |
| 2 | Returning filling in, including spreading, leveling, watering and well ramming in layers n.exc 25Cm thick soft / loose soil complete all as specified and as directed. |
| 3 | Removing excavated material (Soils) from site to a distance n.exc 50 M away and depositing where directed at a level n.exc 1.5 mtr above the starting point complete all as specified and as directed. |
| 4 | Supply & laying 110mm HDPE pipe IS:4984:2016, 8 Kg/cm2 heavy grade PE-80 for cable protection complete all as specified and as directed |
| 5 | Supply & laying 63mm HDPE pipe IS:4984:2016, 8 Kg/cm2 heavy grade PE-80 for cable protection complete all as specified and as directed |
| 6 | Boring holes under road pavement by bocky manually in any type of soil upto 150mm bore complete all as specified and as directed. |
| 7 | M & L for PCC (1:3:6) type C-2 (using 40mm graded stone aggregate) as in foundation of brick pillar to support the pipe line including demolition of old PCC and removing the debris from site complete all as specified and as directed. |
| 8 | M & L for Brick work with sub class 'B' bricks straight or curved on plan exc 6M mean radius built in CM (1:4) as in brick pillar of required size and shape to support the pipe line including demolition of old brickwork & removing from site complete all as specified and as directed. |
| 9 | M & L for rendering 10mm thick with cement mortar (1:6) on fair faces of brick work/ concrete surfaces, finished the surface even and fair complete all as specified and as directed. |
| 10 | M & L for cutting of damaged/ rusted portion of steel surfaces from LT/ AMF Panels and providing suitable size/ thick MS Sheet including welding and painting complete all as specified and as directed. |
| 11 | M & L for pin point the fault by arranging fault locating machine in any size of LT UG cable from any location/position/situtation, taking down/out the faulty portion of cable, of any length from trenches, jointing with cable jointing kit & testing for satisfactorily serviceable with & including necessary excavation and earth work, sand cushioning and making necessary connections to make it functional complete all as specified and as directed.Note :- (i) Cable jointing kit shall be measured and paid seperetely.(ii) Old retrieved bricks/cable cover shall be reused(iii) The rates quoted includes excavation & earth work with sand cushioning. |
| 12 | M & L for cable joint kit of following sizes for heat shrinkable straight through joint complete all as specified and as directed. |
| 13 | 4 Core 25 Sqmm |
| 14 | 3.5 Core 35 Sqmm |
| 15 | 3.5 Core 50 Sqmm |
| 16 | 3.5 Core 70 Sqmm |
| 17 | 3.5 Core 95 Sqmm |
| 18 | 3.5 Core 120 Sqmm |
| 19 | Supply and laying LT UG XLPE insulated armoured heavy duty electric, power cable with aluminium conductor, 1100 volts grade laid in trenches, fixed to poles etc cable including taking down old unserviceable cable of the following sizes :- |
| 20 | 2 Core 10 Sqmm |
| 21 | 4 Core 10 Sqmm |
| 22 | 4 Core 16 Sqmm |
| 23 | 4 Core 25 Sqmm |
| 24 | 3.5 Core 35 Sqmm |
| 25 | 3.5 Core 50 Sqmm |
| 26 | 3.5 Core 70 Sqmm |
| 27 | 3.5 Core 95 Sqmm |
| 28 | 3.5 Core 120 Sqmm |
| 29 | Taking out existing LT UG cable laid in trenches/ fixed to poles etc and refixing/ relaying the same after connected repair works cable of following sizes complete all as specified and as directed:-Note:- Earth work excavation will be measured and paid seperately under relevant items. |
| 30 | 2 core 10 Sqmm to 4 core 35 Sqmm |
| 31 | 3.5 core 50 Sqmm to 3.5 core 120 Sqmm |
| 32 | S & F in repairs following MCCB's Adjustable thermal and Adjustable magnetic type including studs and cable lugs in existing LT panel fixing with handle operated complete all as specified and as directed. |
| 33 | MCCB 100 Amps 16 KA, 4 Pole |
| 34 | MCCB 125 Amps 16 KA, 4 Pole |
| 35 | MCCB 160 Amps 25 KA, 4 Pole |
| 36 | MCCB 200 Amps 36 KA, 4 Pole |
| 37 | MCCB 250 Amps 36 KA, 4 Pole |
| 38 | MCCB 320 Amps 36 KA, 4 Pole |
| 39 | MCCB 400 Amps 36 KA, 4 Pole |
| 40 | Making bore hole under the road in any type of soil through trenchless technology by HDD (horizontal direction drilling method) including perparing and setting up the plant and equipment, perparing new pipe/cable laying work like excavation shoring/ strutting etc drilling, stringing reaming pulling back the new work on the path alignment proper disposal of drilling fluid and the ground penetrating radar survey to protec existing utilities at the pipe/ cable installation location restoration of site agter completion all inclusive as per and STT IS No 2.3 2.2 2.2 second edition 2008 code of practice of trenchless technology suitting indian condition for making horizontal bore size of 200mm dia for HDPE pipe insertion under the road crossing hard standing in and including HDPE pipe of size 200mm nominal dia 28.30mm minimum wall thickness of grade PE 80 for protection of MS pipe/cable to any depth complete all as specified and as directed. |
| 41 | M & L for Earthing complete with galvanised steel earth plate electrode 60 x 60cm x 3.15mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised iron strip 32 x 6mm as earthing lead dia by means of bolts, nuts, check nuts and washers and check nuts made out of galvanised iron, protected by GI pipe light grade 40mm bore dia and connected to main control board (minimum 7.5M long) all as shown in Electrical plate No.3 of MES SSR Part I including necessary excavation and earth work in any type of soil, salt, charcoal dust, PCC 1:2:4 type B-1 in chamber, RCC 1:2:4 chamber cover with 6 mm dia MS bar at 100 mm centre to centre both ways and MS 6 mm dia hook complete all as specified and as directed. |
| 42 | Supply and lay GI tubes, 'light grade' galvanised, with all fittings of bore of tube 50mm laid in trenches for drawing cables under road/ drain crossings etc complete all as specified and as directed. |
| 43 | Supply and lay GI tubes, 'light grade' galvanised, with all fittings of bore of tube 80mm laid in trenches for drawing cables under road/ drain crossings etc complete all as specified and as directed. Please Enable Macros to View BoQ information |
| 44 | Supply and lay GI tubes, 'light grade' galvanised, with all fittings of bore of tube 80mm laid in trenches for drawing cables under road/ drain crossings etc complete all as specified and as directed. Please Enable Macros to View BoQ information |