| 1 | Dismantling of Damaged stone boulder & kattal stacking with all lead & lift including all cost of labours, T&P, all taxes for proper completion of the work. |
| 2 | Dismentaling of old C.R.S masonary including staking of boulder all alabour T& P as per direction of Engineer in charge. |
| 3 | Dismentaling of old RCC Structure including disposing of scrap material, all alabour T& P as per direction of Engineer in charge. |
| 4 | Laying 150mm thick stone Kattal below stone boulder with all lead & lift including all cost of Materials, labours, T&P, all taxes for proper completion of the work. |
| 5 | Re Laying old stone Boulder over Laid Stone Kattal with all lead & lift including all cost of Materials, labours, T&P & all taxes for proper completion of the work. |
| 6 | Supply New stone Boulder 300mm thick over Laid Stone Kattal with all lead & lift including all cost of Materials, labours, T&P & all taxes for proper completion of the work. |
| 7 | E/W Excavation of Foundation in ordinary soil/sandy loam, clay or sand, soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge. |
| 8 | Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work. |
| 9 | P/L 100 mm thick Local sand in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 10 | Laying C.C. (1:3:6) in foundation with cement, course sand and hard stone ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 11 | Laying R.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 12 | Laying R.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. ( For Lining Work ) |
| 13 | Cement sand (1:2) pointing on stone masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 14 | Providing shuttering and centering work for different parts of structure including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 15 | Supply & laying of R.C.C. Hume pipe of 150mm dia (NP3) |
| 16 | Providing and laying C.C. (1:2:4) in coping with coarse sand cement and 10 mm to 20 mm crushed stone grite including cost of material, labour, T&P etc. proper completion of work as per dire ction of Engineer-in-charge. |
| 17 | Laying RCC (1:1.5:3) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 18 | Carriage, cutting, bending, binding & placing of steel reinforcement and binding wire including all cost of material, labour, T&P, Taxes etc. but excluding cost of binding wire, required for proper completion of work. |
| 19 | Laying and fixing of joint filler board 18 mm thick including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 20 | Stone pitching on VRB ramp and approach including cost of all materials, labours and T & P etc. |
| 21 | Colour washing of two coat of parapet including of all materials, labour and T & P etc. |
| 22 | Earth work filling Qty for cavity below damaged pitching in all type of soil with all lead & lift including all cost of labours, T&P, all taxes for proper completion of work By power transport lead beyond 1.00 km and upto 2.00 km with power transport/tractor trolley etc. |
| 23 | Ordinary Jungle including proper disposal etc. |
| 24 | Sluice repair for all complete work with crack rubber seal and nuts bolts and all arrangement etc. Please Enable Macros to View BoQ information |